| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - F. MILLER & SONS, LLC |
- 4 - KOSTMAYER CONSTRUCTION, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
6,000.00 |
6,000.00 |
50,000.00 |
50,000.00 |
24,000.00 |
24,000.00 |
7,000.00 |
7,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
8,400.00 |
8,400.00 |
2,500.00 |
2,500.00 |
| 202-02-A |
removal of bridges, (sta. 1+302.6,8.3m x 40.5m conc.
deck on timber piles) |
1   |
ea |
16,000.00 |
16,000.00 |
30,000.00 |
30,000.00 |
55,000.00 |
55,000.00 |
16,000.00 |
16,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,076.0 |
sq m |
5.00 |
10,380.00 |
3.00 |
6,228.00 |
6.00 |
12,456.00 |
7.00 |
14,532.00 |
| 203-01 |
general excavation
|
1,388   |
cu m |
8.00 |
11,104.00 |
5.00 |
6,940.00 |
7.00 |
9,716.00 |
5.00 |
6,940.00 |
| 203-02 |
drainage excavation
|
1,790   |
cu m |
8.00 |
14,320.00 |
8.00 |
14,320.00 |
14.00 |
25,060.00 |
13.00 |
23,270.00 |
| 203-04 |
embankment
|
672   |
cu m |
18.00 |
12,096.00 |
18.00 |
12,096.00 |
11.00 |
7,392.00 |
15.00 |
10,080.00 |
| 204-02 |
temporary hay or straw bales
|
20   |
ea |
10.00 |
200.00 |
8.00 |
160.00 |
5.00 |
100.00 |
10.00 |
200.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
ea |
100.00 |
200.00 |
125.00 |
250.00 |
67.00 |
134.00 |
100.00 |
200.00 |
| 204-06 |
temporary silt fencing
|
538   |
ln m |
5.00 |
2,690.00 |
4.00 |
2,152.00 |
6.00 |
3,228.00 |
5.00 |
2,690.00 |
| 302-02-B-01 |
class ii base course (crushed stone or recycle pccp)
(220 mm thick ) |
2,199.4 |
sq m |
21.00 |
46,187.40 |
16.00 |
35,190.40 |
16.00 |
35,190.40 |
19.00 |
41,788.60 |
| 304-01 |
lime
|
15.86 |
Mg |
225.00 |
3,568.50 |
110.00 |
1,744.60 |
164.00 |
2,601.04 |
130.00 |
2,061.80 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
1,049   |
sq m |
14.00 |
14,686.00 |
4.00 |
4,196.00 |
2.50 |
2,622.50 |
4.50 |
4,720.50 |
| 401-01 |
aggregate surface course (net section)
|
62.4 |
cu m |
85.00 |
5,304.00 |
75.00 |
4,680.00 |
96.00 |
5,990.40 |
85.00 |
5,304.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
cu m |
80.00 |
8,000.00 |
100.00 |
10,000.00 |
74.00 |
7,400.00 |
100.00 |
10,000.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
628.2 |
Mg |
65.00 |
40,833.00 |
74.00 |
46,486.80 |
56.00 |
35,179.20 |
145.00 |
91,089.00 |
| 502-01-A-01 |
superpave asphaltic conc wearing course (level 1f)
|
324.0 |
Mg |
65.00 |
21,060.00 |
82.00 |
26,568.00 |
56.00 |
18,144.00 |
145.00 |
46,980.00 |
| 701-05-G |
side drain pipe (450 mm)
|
50.2 |
ln m |
118.00 |
5,923.60 |
200.00 |
10,040.00 |
76.00 |
3,815.20 |
110.00 |
5,522.00 |
| 701-05-I |
side drain pipe (600 mm)
|
20.3 |
ln m |
185.00 |
3,755.50 |
300.00 |
6,090.00 |
149.00 |
3,024.70 |
130.00 |
2,639.00 |
| 702-08-A |
side drain safety end (type 1)
|
8   |
ea |
1,200.00 |
9,600.00 |
1,200.00 |
9,600.00 |
1,000.00 |
8,000.00 |
1,700.00 |
13,600.00 |
| 704-03 |
blocked out guard rail
|
177.17 |
ln m |
55.00 |
9,744.35 |
49.00 |
8,681.33 |
50.00 |
8,858.50 |
61.00 |
10,807.37 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
140.00 |
4,267.20 |
148.00 |
4,511.04 |
154.00 |
4,693.92 |
155.00 |
4,724.40 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
1,600.00 |
6,400.00 |
1,750.00 |
7,000.00 |
1,800.00 |
7,200.00 |
1,900.00 |
7,600.00 |
| 708-01 |
right-of-way monument
|
12   |
ea |
400.00 |
4,800.00 |
150.00 |
1,800.00 |
300.00 |
3,600.00 |
100.00 |
1,200.00 |
| 708-02 |
right-of-way monument witness post
|
12   |
ea |
400.00 |
4,800.00 |
150.00 |
1,800.00 |
300.00 |
3,600.00 |
100.00 |
1,200.00 |
| 712-04 |
flexible revetment
|
865   |
sq m |
55.00 |
47,575.00 |
50.00 |
43,250.00 |
50.00 |
43,250.00 |
65.00 |
56,225.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
56,800.00 |
56,800.00 |
13,000.00 |
13,000.00 |
| 714-02 |
water
|
77   |
cu m |
1.00 |
77.00 |
3.00 |
231.00 |
3.00 |
231.00 |
5.00 |
385.00 |
| 717-01 |
seeding
|
37   |
kg |
20.00 |
740.00 |
23.00 |
851.00 |
23.00 |
851.00 |
33.00 |
1,221.00 |
| 718-01 |
fertilizer
|
913   |
kg |
1.10 |
1,004.30 |
1.00 |
913.00 |
1.30 |
1,186.90 |
2.00 |
1,826.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
17,400.00 |
17,400.00 |
8,000.00 |
8,000.00 |
| 725-01 |
temporary detour roads
|
464.3 |
ln m |
378.00 |
175,505.40 |
380.00 |
176,434.00 |
365.00 |
169,469.50 |
382.00 |
177,362.60 |
| 725-03 |
temporary detour bridging
|
78.00 |
ln m |
2,200.00 |
171,600.00 |
3,000.00 |
234,000.00 |
3,910.00 |
304,980.00 |
2,800.00 |
218,400.00 |
| 727-01 |
mobilization
|
lump |
lump |
80,000.00 |
80,000.00 |
110,000.00 |
110,000.00 |
100,000.00 |
100,000.00 |
105,000.00 |
105,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
65.00 |
260.00 |
70.00 |
280.00 |
73.00 |
292.00 |
75.00 |
300.00 |
| 731-02 |
reflectorized raised pavement markers
|
28   |
ea |
20.00 |
560.00 |
7.00 |
196.00 |
16.00 |
448.00 |
17.00 |
476.00 |
| 732-01-A |
plastic pavement striping (100 mm width)
|
658   |
ln m |
4.25 |
2,796.50 |
2.00 |
1,316.00 |
4.10 |
2,697.80 |
4.00 |
2,632.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.084 |
km |
2,500.00 |
210.00 |
2,900.00 |
243.60 |
1,900.00 |
159.60 |
3,300.00 |
277.20 |
| 735-01 |
mailboxes
|
10   |
ea |
50.00 |
500.00 |
75.00 |
750.00 |
10.00 |
100.00 |
17.00 |
170.00 |
| 735-02 |
mailbox supports (single)
|
10   |
ea |
100.00 |
1,000.00 |
150.00 |
1,500.00 |
155.00 |
1,550.00 |
130.00 |
1,300.00 |
| 740-01 |
construction layout
|
lump |
lump |
18,000.00 |
18,000.00 |
12,000.00 |
12,000.00 |
108,000.00 |
108,000.00 |
15,000.00 |
15,000.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
585.6 |
ln m |
275.00 |
161,040.00 |
200.00 |
117,120.00 |
200.70 |
117,529.92 |
400.00 |
234,240.00 |
| 804-05 |
precast concrete test piles
|
1   |
ea |
22,000.00 |
22,000.00 |
12,000.00 |
12,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
| 804-09 |
loading test piles
|
1   |
ea |
1.00 |
1.00 |
7,000.00 |
7,000.00 |
28,000.00 |
28,000.00 |
1.00 |
1.00 |
| 804-10 |
reloading test piles
|
1   |
ea |
1.00 |
1.00 |
100.00 |
100.00 |
100.00 |
100.00 |
1.00 |
1.00 |
| 804-11 |
redriving test piles
|
1   |
ea |
1.00 |
1.00 |
100.00 |
100.00 |
100.00 |
100.00 |
1.00 |
1.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
100.00 |
100.00 |
100.00 |
100.00 |
1.00 |
1.00 |
| 804-17 |
dynamic monitoring
|
3   |
ea |
2,500.00 |
7,500.00 |
750.00 |
2,250.00 |
600.00 |
1,800.00 |
2,200.00 |
6,600.00 |
| 805-01-F |
class a concrete (bents)
|
64.15 |
cu m |
950.00 |
60,942.50 |
600.00 |
38,490.00 |
566.00 |
36,308.90 |
700.00 |
44,905.00 |
| 805-03 |
class aa concrete
|
173.05 |
cu m |
600.00 |
103,830.00 |
525.00 |
90,851.25 |
427.00 |
73,892.35 |
700.00 |
121,135.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
474.00 |
ln m |
235.00 |
111,390.00 |
275.00 |
130,350.00 |
172.00 |
81,528.00 |
299.00 |
141,726.00 |
| 805-11 |
strip seal joints
|
24.00 |
ln m |
350.00 |
8,400.00 |
350.00 |
8,400.00 |
272.00 |
6,528.00 |
325.00 |
7,800.00 |
| 806-01 |
deformed reinforcing steel
|
26,313   |
kg |
2.00 |
52,626.00 |
1.70 |
44,732.10 |
1.55 |
40,785.15 |
1.85 |
48,679.05 |
| 807-06 |
structural metalwork
|
lump |
lump |
9,500.00 |
9,500.00 |
8,000.00 |
8,000.00 |
8,500.00 |
8,500.00 |
13,000.00 |
13,000.00 |
| 810-01 |
concrete railing (barrier)
|
120.00 |
ln m |
140.00 |
16,800.00 |
100.00 |
12,000.00 |
104.00 |
12,480.00 |
140.00 |
16,800.00 |
| 813-01 |
concrete approach slabs
|
295.20 |
sq m |
220.00 |
64,944.00 |
175.00 |
51,660.00 |
170.00 |
50,184.00 |
85.80 |
25,328.16 |
| S-101 |
dynamic analysis
|
3   |
each |
1,000.00 |
3,000.00 |
800.00 |
2,400.00 |
800.00 |
2,400.00 |
3,000.00 |
9,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,410,724.25 |
|
1,437,052.12 |
|
1,588,057.98 |
|
1,621,440.68 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - SHAVERS-WHITTLE CONSTRUCTION INC |
- 6 - GILCHRIST CONSTRUCTION CO. LLC |
- 7 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
7,500.00 |
7,500.00 |
4,000.00 |
4,000.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-A |
removal of bridges, (sta. 1+302.6,8.3m x 40.5m conc.
deck on timber piles) |
1   |
ea |
80,000.00 |
80,000.00 |
60,000.00 |
60,000.00 |
65,000.00 |
65,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
2,076.0 |
sq m |
5.00 |
10,380.00 |
5.00 |
10,380.00 |
5.25 |
10,899.00 |
|
|
| 203-01 |
general excavation
|
1,388   |
cu m |
8.00 |
11,104.00 |
6.60 |
9,160.80 |
8.00 |
11,104.00 |
|
|
| 203-02 |
drainage excavation
|
1,790   |
cu m |
14.00 |
25,060.00 |
8.50 |
15,215.00 |
13.00 |
23,270.00 |
|
|
| 203-04 |
embankment
|
672   |
cu m |
16.00 |
10,752.00 |
20.00 |
13,440.00 |
23.00 |
15,456.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
20   |
ea |
8.00 |
160.00 |
32.00 |
640.00 |
11.00 |
220.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
ea |
125.00 |
250.00 |
198.00 |
396.00 |
185.00 |
370.00 |
|
|
| 204-06 |
temporary silt fencing
|
538   |
ln m |
4.00 |
2,152.00 |
7.00 |
3,766.00 |
4.60 |
2,474.80 |
|
|
| 302-02-B-01 |
class ii base course (crushed stone or recycle pccp)
(220 mm thick ) |
2,199.4 |
sq m |
18.00 |
39,589.20 |
14.00 |
30,791.60 |
17.00 |
37,389.80 |
|
|
| 304-01 |
lime
|
15.86 |
Mg |
165.00 |
2,616.90 |
165.00 |
2,616.90 |
130.00 |
2,061.80 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
1,049   |
sq m |
2.50 |
2,622.50 |
4.00 |
4,196.00 |
2.50 |
2,622.50 |
|
|
| 401-01 |
aggregate surface course (net section)
|
62.4 |
cu m |
58.00 |
3,619.20 |
47.00 |
2,932.80 |
80.00 |
4,992.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
cu m |
35.00 |
3,500.00 |
45.00 |
4,500.00 |
80.00 |
8,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
628.2 |
Mg |
65.00 |
40,833.00 |
80.00 |
50,256.00 |
62.00 |
38,948.40 |
|
|
| 502-01-A-01 |
superpave asphaltic conc wearing course (level 1f)
|
324.0 |
Mg |
65.00 |
21,060.00 |
85.00 |
27,540.00 |
66.00 |
21,384.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
50.2 |
ln m |
120.00 |
6,024.00 |
120.00 |
6,024.00 |
182.00 |
9,136.40 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
20.3 |
ln m |
185.00 |
3,755.50 |
160.00 |
3,248.00 |
274.00 |
5,562.20 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
8   |
ea |
250.00 |
2,000.00 |
1,200.00 |
9,600.00 |
1,475.00 |
11,800.00 |
|
|
| 704-03 |
blocked out guard rail
|
177.17 |
ln m |
54.00 |
9,567.18 |
50.00 |
8,858.50 |
60.30 |
10,683.35 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
135.00 |
4,114.80 |
150.00 |
4,572.00 |
155.00 |
4,724.40 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
1,700.00 |
6,800.00 |
1,800.00 |
7,200.00 |
1,800.00 |
7,200.00 |
|
|
| 708-01 |
right-of-way monument
|
12   |
ea |
60.00 |
720.00 |
200.00 |
2,400.00 |
90.00 |
1,080.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
12   |
ea |
60.00 |
720.00 |
200.00 |
2,400.00 |
90.00 |
1,080.00 |
|
|
| 712-04 |
flexible revetment
|
865   |
sq m |
58.00 |
50,170.00 |
55.00 |
47,575.00 |
40.00 |
34,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
15,000.00 |
15,000.00 |
|
|
| 714-02 |
water
|
77   |
cu m |
2.50 |
192.50 |
5.00 |
385.00 |
12.00 |
924.00 |
|
|
| 717-01 |
seeding
|
37   |
kg |
22.50 |
832.50 |
35.00 |
1,295.00 |
51.00 |
1,887.00 |
|
|
| 718-01 |
fertilizer
|
913   |
kg |
1.25 |
1,141.25 |
0.60 |
547.80 |
1.20 |
1,095.60 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
|
|
| 725-01 |
temporary detour roads
|
464.3 |
ln m |
725.00 |
336,617.50 |
390.00 |
181,077.00 |
531.00 |
246,543.30 |
|
|
| 725-03 |
temporary detour bridging
|
78.00 |
ln m |
2,600.00 |
202,800.00 |
4,800.00 |
374,400.00 |
4,733.00 |
369,174.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
65,000.00 |
65,000.00 |
140,000.00 |
140,000.00 |
174,000.00 |
174,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
75.00 |
300.00 |
80.00 |
320.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
28   |
ea |
15.00 |
420.00 |
8.00 |
224.00 |
16.50 |
462.00 |
|
|
| 732-01-A |
plastic pavement striping (100 mm width)
|
658   |
ln m |
4.50 |
2,961.00 |
2.50 |
1,645.00 |
4.40 |
2,895.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.084 |
km |
1,800.00 |
151.20 |
3,200.00 |
268.80 |
2,100.00 |
176.40 |
|
|
| 735-01 |
mailboxes
|
10   |
ea |
45.00 |
450.00 |
23.00 |
230.00 |
50.00 |
500.00 |
|
|
| 735-02 |
mailbox supports (single)
|
10   |
ea |
45.00 |
450.00 |
160.00 |
1,600.00 |
120.00 |
1,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
585.6 |
ln m |
280.00 |
163,968.00 |
205.00 |
120,048.00 |
189.00 |
110,678.40 |
|
|
| 804-05 |
precast concrete test piles
|
1   |
ea |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
17,000.00 |
17,000.00 |
|
|
| 804-09 |
loading test piles
|
1   |
ea |
1,000.00 |
1,000.00 |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
|
|
| 804-10 |
reloading test piles
|
1   |
ea |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
2,500.00 |
2,500.00 |
|
|
| 804-11 |
redriving test piles
|
1   |
ea |
1.00 |
1.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
3   |
ea |
500.00 |
1,500.00 |
3,000.00 |
9,000.00 |
2,000.00 |
6,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
64.15 |
cu m |
1,000.00 |
64,150.00 |
750.00 |
48,112.50 |
850.00 |
54,527.50 |
|
|
| 805-03 |
class aa concrete
|
173.05 |
cu m |
850.00 |
147,092.50 |
700.00 |
121,135.00 |
710.00 |
122,865.50 |
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
474.00 |
ln m |
185.00 |
87,690.00 |
200.00 |
94,800.00 |
175.00 |
82,950.00 |
|
|
| 805-11 |
strip seal joints
|
24.00 |
ln m |
350.00 |
8,400.00 |
400.00 |
9,600.00 |
345.00 |
8,280.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
26,313   |
kg |
1.85 |
48,679.05 |
1.40 |
36,838.20 |
1.60 |
42,100.80 |
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
8,000.00 |
8,000.00 |
6,200.00 |
6,200.00 |
9,500.00 |
9,500.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
120.00 |
ln m |
175.00 |
21,000.00 |
210.00 |
25,200.00 |
110.00 |
13,200.00 |
|
|
| 813-01 |
concrete approach slabs
|
295.20 |
sq m |
175.00 |
51,660.00 |
170.00 |
50,184.00 |
185.00 |
54,612.00 |
|
|
| S-101 |
dynamic analysis
|
3   |
each |
750.00 |
2,250.00 |
3,000.00 |
9,000.00 |
900.00 |
2,700.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,686,778.78 |
|
1,697,818.90 |
|
1,770,650.35 |
|
|
|