February 06, 2014 Error processing SSI file

Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 056-03-0024
Parish: ST MARTIN
Routes: LA 31
Description: RUTH CANAL BRIDGE
Type Const: grading, lime treatment, class ii base course, superpave asphaltic concrete pavement,
precast prestressed concrete girder span bridge and related work.
 
RankLicenseBidderAmount
109090 GUINN BROTHERS, LLC. $1,410,724.25
234567 JAMES CONSTRUCTION GROUP LLC $1,437,052.12
300060 F. MILLER & SONS, LLC $1,588,057.98
425747 KOSTMAYER CONSTRUCTION, LLC $1,621,440.68
536827 SHAVERS-WHITTLE CONSTRUCTION INC $1,686,778.78
612312 GILCHRIST CONSTRUCTION CO. LLC $1,697,818.90
702179 BOH BROS. CONSTRUCTION CO., LLC. $1,770,650.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
F. MILLER & SONS, LLC
- 4 -
KOSTMAYER CONSTRUCTION, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 6,000.00 6,000.00 50,000.00 50,000.00 24,000.00 24,000.00 7,000.00 7,000.00
202-01 removal of structures & obstructions lump      lump 8,000.00 8,000.00 15,000.00 15,000.00 8,400.00 8,400.00 2,500.00 2,500.00
202-02-A removal of bridges, (sta. 1+302.6,8.3m x 40.5m conc.
deck on timber piles)
1      ea 16,000.00 16,000.00 30,000.00 30,000.00 55,000.00 55,000.00 16,000.00 16,000.00
202-02-G removal of surfacing & stabilized base 2,076.0    sq m 5.00 10,380.00 3.00 6,228.00 6.00 12,456.00 7.00 14,532.00
203-01 general excavation 1,388      cu m 8.00 11,104.00 5.00 6,940.00 7.00 9,716.00 5.00 6,940.00
203-02 drainage excavation 1,790      cu m 8.00 14,320.00 8.00 14,320.00 14.00 25,060.00 13.00 23,270.00
203-04 embankment 672      cu m 18.00 12,096.00 18.00 12,096.00 11.00 7,392.00 15.00 10,080.00
204-02 temporary hay or straw bales 20      ea 10.00 200.00 8.00 160.00 5.00 100.00 10.00 200.00
204-05-A temporary sediment check dams (hay) 2      ea 100.00 200.00 125.00 250.00 67.00 134.00 100.00 200.00
204-06 temporary silt fencing 538      ln m 5.00 2,690.00 4.00 2,152.00 6.00 3,228.00 5.00 2,690.00
302-02-B-01 class ii base course (crushed stone or recycle pccp)
(220 mm thick )
2,199.4    sq m 21.00 46,187.40 16.00 35,190.40 16.00 35,190.40 19.00 41,788.60
304-01 lime 15.86   Mg 225.00 3,568.50 110.00 1,744.60 164.00 2,601.04 130.00 2,061.80
304-04-D lime treatment (type d) (300 mm thick) 1,049      sq m 14.00 14,686.00 4.00 4,196.00 2.50 2,622.50 4.50 4,720.50
401-01 aggregate surface course (net section) 62.4    cu m 85.00 5,304.00 75.00 4,680.00 96.00 5,990.40 85.00 5,304.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    cu m 80.00 8,000.00 100.00 10,000.00 74.00 7,400.00 100.00 10,000.00
502-01-A superpave asphaltic concrete (level 1) 628.2    Mg 65.00 40,833.00 74.00 46,486.80 56.00 35,179.20 145.00 91,089.00
502-01-A-01 superpave asphaltic conc wearing course (level 1f) 324.0    Mg 65.00 21,060.00 82.00 26,568.00 56.00 18,144.00 145.00 46,980.00
701-05-G side drain pipe (450 mm) 50.2    ln m 118.00 5,923.60 200.00 10,040.00 76.00 3,815.20 110.00 5,522.00
701-05-I side drain pipe (600 mm) 20.3    ln m 185.00 3,755.50 300.00 6,090.00 149.00 3,024.70 130.00 2,639.00
702-08-A side drain safety end (type 1) 8      ea 1,200.00 9,600.00 1,200.00 9,600.00 1,000.00 8,000.00 1,700.00 13,600.00
704-03 blocked out guard rail 177.17   ln m 55.00 9,744.35 49.00 8,681.33 50.00 8,858.50 61.00 10,807.37
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 140.00 4,267.20 148.00 4,511.04 154.00 4,693.92 155.00 4,724.40
704-11-A guard rail end treatment (flared) 4      ea 1,600.00 6,400.00 1,750.00 7,000.00 1,800.00 7,200.00 1,900.00 7,600.00
708-01 right-of-way monument 12      ea 400.00 4,800.00 150.00 1,800.00 300.00 3,600.00 100.00 1,200.00
708-02 right-of-way monument witness post 12      ea 400.00 4,800.00 150.00 1,800.00 300.00 3,600.00 100.00 1,200.00
712-04 flexible revetment 865      sq m 55.00 47,575.00 50.00 43,250.00 50.00 43,250.00 65.00 56,225.00
713-01 temporary signs & barricades lump      lump 14,000.00 14,000.00 10,000.00 10,000.00 56,800.00 56,800.00 13,000.00 13,000.00
714-02 water 77      cu m 1.00 77.00 3.00 231.00 3.00 231.00 5.00 385.00
717-01 seeding 37      kg 20.00 740.00 23.00 851.00 23.00 851.00 33.00 1,221.00
718-01 fertilizer 913      kg 1.10 1,004.30 1.00 913.00 1.30 1,186.90 2.00 1,826.00
722-01 project site laboratory 1      ea 5,000.00 5,000.00 4,000.00 4,000.00 17,400.00 17,400.00 8,000.00 8,000.00
725-01 temporary detour roads 464.3    ln m 378.00 175,505.40 380.00 176,434.00 365.00 169,469.50 382.00 177,362.60
725-03 temporary detour bridging 78.00   ln m 2,200.00 171,600.00 3,000.00 234,000.00 3,910.00 304,980.00 2,800.00 218,400.00
727-01 mobilization lump      lump 80,000.00 80,000.00 110,000.00 110,000.00 100,000.00 100,000.00 105,000.00 105,000.00
729-16-C object marker assembly (type 3) 4      ea 65.00 260.00 70.00 280.00 73.00 292.00 75.00 300.00
731-02 reflectorized raised pavement markers 28      ea 20.00 560.00 7.00 196.00 16.00 448.00 17.00 476.00
732-01-A plastic pavement striping (100 mm width) 658      ln m 4.25 2,796.50 2.00 1,316.00 4.10 2,697.80 4.00 2,632.00
732-03-A plastic pavement striping (broken line)(100 mm width) 0.084  km 2,500.00 210.00 2,900.00 243.60 1,900.00 159.60 3,300.00 277.20
735-01 mailboxes 10      ea 50.00 500.00 75.00 750.00 10.00 100.00 17.00 170.00
735-02 mailbox supports (single) 10      ea 100.00 1,000.00 150.00 1,500.00 155.00 1,550.00 130.00 1,300.00
740-01 construction layout lump      lump 18,000.00 18,000.00 12,000.00 12,000.00 108,000.00 108,000.00 15,000.00 15,000.00
804-01-F precast concrete piles (600 mm) 585.6    ln m 275.00 161,040.00 200.00 117,120.00 200.70 117,529.92 400.00 234,240.00
804-05 precast concrete test piles 1      ea 22,000.00 22,000.00 12,000.00 12,000.00 25,000.00 25,000.00 18,000.00 18,000.00
804-09 loading test piles 1      ea 1.00 1.00 7,000.00 7,000.00 28,000.00 28,000.00 1.00 1.00
804-10 reloading test piles 1      ea 1.00 1.00 100.00 100.00 100.00 100.00 1.00 1.00
804-11 redriving test piles 1      ea 1.00 1.00 100.00 100.00 100.00 100.00 1.00 1.00
804-12 loading permanent piles 1      ea 1.00 1.00 100.00 100.00 100.00 100.00 1.00 1.00
804-17 dynamic monitoring 3      ea 2,500.00 7,500.00 750.00 2,250.00 600.00 1,800.00 2,200.00 6,600.00
805-01-F class a concrete (bents) 64.15   cu m 950.00 60,942.50 600.00 38,490.00 566.00 36,308.90 700.00 44,905.00
805-03 class aa concrete 173.05   cu m 600.00 103,830.00 525.00 90,851.25 427.00 73,892.35 700.00 121,135.00
805-08-H precast-prestressed concrete girders (type quad beam) 474.00   ln m 235.00 111,390.00 275.00 130,350.00 172.00 81,528.00 299.00 141,726.00
805-11 strip seal joints 24.00   ln m 350.00 8,400.00 350.00 8,400.00 272.00 6,528.00 325.00 7,800.00
806-01 deformed reinforcing steel 26,313      kg 2.00 52,626.00 1.70 44,732.10 1.55 40,785.15 1.85 48,679.05
807-06 structural metalwork lump      lump 9,500.00 9,500.00 8,000.00 8,000.00 8,500.00 8,500.00 13,000.00 13,000.00
810-01 concrete railing (barrier) 120.00   ln m 140.00 16,800.00 100.00 12,000.00 104.00 12,480.00 140.00 16,800.00
813-01 concrete approach slabs 295.20   sq m 220.00 64,944.00 175.00 51,660.00 170.00 50,184.00 85.80 25,328.16
S-101 dynamic analysis 3      each 1,000.00 3,000.00 800.00 2,400.00 800.00 2,400.00 3,000.00 9,000.00
                       
 CONTRACTOR TOTAL       1,410,724.25   1,437,052.12   1,588,057.98   1,621,440.68
 
Item Number Item Description Quantity Unit of Measure - 5 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 6 -
GILCHRIST CONSTRUCTION CO. LLC
- 7 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00    
202-01 removal of structures & obstructions lump      lump 7,500.00 7,500.00 4,000.00 4,000.00 15,000.00 15,000.00    
202-02-A removal of bridges, (sta. 1+302.6,8.3m x 40.5m conc.
deck on timber piles)
1      ea 80,000.00 80,000.00 60,000.00 60,000.00 65,000.00 65,000.00    
202-02-G removal of surfacing & stabilized base 2,076.0    sq m 5.00 10,380.00 5.00 10,380.00 5.25 10,899.00    
203-01 general excavation 1,388      cu m 8.00 11,104.00 6.60 9,160.80 8.00 11,104.00    
203-02 drainage excavation 1,790      cu m 14.00 25,060.00 8.50 15,215.00 13.00 23,270.00    
203-04 embankment 672      cu m 16.00 10,752.00 20.00 13,440.00 23.00 15,456.00    
204-02 temporary hay or straw bales 20      ea 8.00 160.00 32.00 640.00 11.00 220.00    
204-05-A temporary sediment check dams (hay) 2      ea 125.00 250.00 198.00 396.00 185.00 370.00    
204-06 temporary silt fencing 538      ln m 4.00 2,152.00 7.00 3,766.00 4.60 2,474.80    
302-02-B-01 class ii base course (crushed stone or recycle pccp)
(220 mm thick )
2,199.4    sq m 18.00 39,589.20 14.00 30,791.60 17.00 37,389.80    
304-01 lime 15.86   Mg 165.00 2,616.90 165.00 2,616.90 130.00 2,061.80    
304-04-D lime treatment (type d) (300 mm thick) 1,049      sq m 2.50 2,622.50 4.00 4,196.00 2.50 2,622.50    
401-01 aggregate surface course (net section) 62.4    cu m 58.00 3,619.20 47.00 2,932.80 80.00 4,992.00    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    cu m 35.00 3,500.00 45.00 4,500.00 80.00 8,000.00    
502-01-A superpave asphaltic concrete (level 1) 628.2    Mg 65.00 40,833.00 80.00 50,256.00 62.00 38,948.40    
502-01-A-01 superpave asphaltic conc wearing course (level 1f) 324.0    Mg 65.00 21,060.00 85.00 27,540.00 66.00 21,384.00    
701-05-G side drain pipe (450 mm) 50.2    ln m 120.00 6,024.00 120.00 6,024.00 182.00 9,136.40    
701-05-I side drain pipe (600 mm) 20.3    ln m 185.00 3,755.50 160.00 3,248.00 274.00 5,562.20    
702-08-A side drain safety end (type 1) 8      ea 250.00 2,000.00 1,200.00 9,600.00 1,475.00 11,800.00    
704-03 blocked out guard rail 177.17   ln m 54.00 9,567.18 50.00 8,858.50 60.30 10,683.35    
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 135.00 4,114.80 150.00 4,572.00 155.00 4,724.40    
704-11-A guard rail end treatment (flared) 4      ea 1,700.00 6,800.00 1,800.00 7,200.00 1,800.00 7,200.00    
708-01 right-of-way monument 12      ea 60.00 720.00 200.00 2,400.00 90.00 1,080.00    
708-02 right-of-way monument witness post 12      ea 60.00 720.00 200.00 2,400.00 90.00 1,080.00    
712-04 flexible revetment 865      sq m 58.00 50,170.00 55.00 47,575.00 40.00 34,600.00    
713-01 temporary signs & barricades lump      lump 20,000.00 20,000.00 45,000.00 45,000.00 15,000.00 15,000.00    
714-02 water 77      cu m 2.50 192.50 5.00 385.00 12.00 924.00    
717-01 seeding 37      kg 22.50 832.50 35.00 1,295.00 51.00 1,887.00    
718-01 fertilizer 913      kg 1.25 1,141.25 0.60 547.80 1.20 1,095.60    
722-01 project site laboratory 1      ea 35,000.00 35,000.00 10,000.00 10,000.00 8,000.00 8,000.00    
725-01 temporary detour roads 464.3    ln m 725.00 336,617.50 390.00 181,077.00 531.00 246,543.30    
725-03 temporary detour bridging 78.00   ln m 2,600.00 202,800.00 4,800.00 374,400.00 4,733.00 369,174.00    
727-01 mobilization lump      lump 65,000.00 65,000.00 140,000.00 140,000.00 174,000.00 174,000.00    
729-16-C object marker assembly (type 3) 4      ea 75.00 300.00 80.00 320.00 80.00 320.00    
731-02 reflectorized raised pavement markers 28      ea 15.00 420.00 8.00 224.00 16.50 462.00    
732-01-A plastic pavement striping (100 mm width) 658      ln m 4.50 2,961.00 2.50 1,645.00 4.40 2,895.20    
732-03-A plastic pavement striping (broken line)(100 mm width) 0.084  km 1,800.00 151.20 3,200.00 268.80 2,100.00 176.40    
735-01 mailboxes 10      ea 45.00 450.00 23.00 230.00 50.00 500.00    
735-02 mailbox supports (single) 10      ea 45.00 450.00 160.00 1,600.00 120.00 1,200.00    
740-01 construction layout lump      lump 35,000.00 35,000.00 25,000.00 25,000.00 40,000.00 40,000.00    
804-01-F precast concrete piles (600 mm) 585.6    ln m 280.00 163,968.00 205.00 120,048.00 189.00 110,678.40    
804-05 precast concrete test piles 1      ea 15,000.00 15,000.00 12,000.00 12,000.00 17,000.00 17,000.00    
804-09 loading test piles 1      ea 1,000.00 1,000.00 14,000.00 14,000.00 10,000.00 10,000.00    
804-10 reloading test piles 1      ea 1.00 1.00 4,000.00 4,000.00 2,500.00 2,500.00    
804-11 redriving test piles 1      ea 1.00 1.00 3,000.00 3,000.00 1,500.00 1,500.00    
804-12 loading permanent piles 1      ea 1.00 1.00 1,000.00 1,000.00 5,000.00 5,000.00    
804-17 dynamic monitoring 3      ea 500.00 1,500.00 3,000.00 9,000.00 2,000.00 6,000.00    
805-01-F class a concrete (bents) 64.15   cu m 1,000.00 64,150.00 750.00 48,112.50 850.00 54,527.50    
805-03 class aa concrete 173.05   cu m 850.00 147,092.50 700.00 121,135.00 710.00 122,865.50    
805-08-H precast-prestressed concrete girders (type quad beam) 474.00   ln m 185.00 87,690.00 200.00 94,800.00 175.00 82,950.00    
805-11 strip seal joints 24.00   ln m 350.00 8,400.00 400.00 9,600.00 345.00 8,280.00    
806-01 deformed reinforcing steel 26,313      kg 1.85 48,679.05 1.40 36,838.20 1.60 42,100.80    
807-06 structural metalwork lump      lump 8,000.00 8,000.00 6,200.00 6,200.00 9,500.00 9,500.00    
810-01 concrete railing (barrier) 120.00   ln m 175.00 21,000.00 210.00 25,200.00 110.00 13,200.00    
813-01 concrete approach slabs 295.20   sq m 175.00 51,660.00 170.00 50,184.00 185.00 54,612.00    
S-101 dynamic analysis 3      each 750.00 2,250.00 3,000.00 9,000.00 900.00 2,700.00    
                       
 CONTRACTOR TOTAL       1,686,778.78   1,697,818.90   1,770,650.35    