| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - FORBY CONTRACTING, INC. |
- 3 - BEVERLY CONSTRUCTION CO. LLC |
- 4 - COMMAND CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
50   |
CUYD |
5.00 |
250.00 |
20.00 |
1,000.00 |
22.50 |
1,125.00 |
20.00 |
1,000.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
3,400   |
LNFT |
1.10 |
3,740.00 |
1.00 |
3,400.00 |
1.10 |
3,740.00 |
1.00 |
3,400.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
4,000   |
LNFT |
1.10 |
4,400.00 |
1.25 |
5,000.00 |
1.10 |
4,400.00 |
1.00 |
4,000.00 |
| 602-03 |
cleaning and sealing random cracks
|
250   |
LNFT |
2.70 |
675.00 |
2.50 |
625.00 |
2.62 |
655.00 |
3.00 |
750.00 |
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
175.0 |
SQYD |
105.00 |
18,375.00 |
125.00 |
21,875.00 |
96.50 |
16,887.50 |
110.00 |
19,250.00 |
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
200.0 |
SQYD |
95.00 |
19,000.00 |
110.00 |
22,000.00 |
97.50 |
19,500.00 |
82.00 |
16,400.00 |
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
1,500.0 |
SQYD |
87.00 |
130,500.00 |
85.00 |
127,500.00 |
87.50 |
131,250.00 |
80.00 |
120,000.00 |
| 702-03-C |
catch basins (cb-06)
|
10   |
EACH |
1,500.00 |
15,000.00 |
2,250.00 |
22,500.00 |
3,200.00 |
32,000.00 |
3,000.00 |
30,000.00 |
| 702-03-F |
catch basins (cb-08)
|
5   |
EACH |
3,000.00 |
15,000.00 |
3,500.00 |
17,500.00 |
5,500.00 |
27,500.00 |
6,000.00 |
30,000.00 |
| 702-04-A |
adjusting manholes
|
6   |
EACH |
400.00 |
2,400.00 |
250.00 |
1,500.00 |
592.00 |
3,552.00 |
450.00 |
2,700.00 |
| 702-04-B |
adjusting catch basins
|
25   |
EACH |
200.00 |
5,000.00 |
750.00 |
18,750.00 |
773.00 |
19,325.00 |
450.00 |
11,250.00 |
| 707-01 |
concrete curb
|
500.0 |
LNFT |
20.00 |
10,000.00 |
10.00 |
5,000.00 |
12.50 |
6,250.00 |
12.00 |
6,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
24,000.00 |
24,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
21,000.00 |
21,000.00 |
10,000.00 |
10,000.00 |
7,200.00 |
7,200.00 |
30,000.00 |
30,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
225   |
EACH |
6.00 |
1,350.00 |
5.00 |
1,125.00 |
5.50 |
1,237.50 |
5.00 |
1,125.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
300   |
LNFT |
1.00 |
300.00 |
1.00 |
300.00 |
0.93 |
279.00 |
1.00 |
300.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
48   |
LNFT |
3.00 |
144.00 |
2.80 |
134.40 |
3.10 |
148.80 |
3.00 |
144.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.520 |
MILE |
2,500.00 |
6,300.00 |
2,000.00 |
5,040.00 |
2,075.00 |
5,229.00 |
2,000.00 |
5,040.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.260 |
MILE |
1,000.00 |
1,260.00 |
900.00 |
1,134.00 |
945.00 |
1,190.70 |
900.00 |
1,134.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
150.00 |
600.00 |
130.00 |
520.00 |
143.00 |
572.00 |
150.00 |
600.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
195.00 |
390.00 |
199.50 |
399.00 |
200.00 |
400.00 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
500.00 |
500.00 |
425.00 |
425.00 |
462.00 |
462.00 |
400.00 |
400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
270,194.00 |
|
275,718.40 |
|
290,902.50 |
|
307,893.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - HARD ROCK CONSTRUCTION CO. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
50   |
CUYD |
5.00 |
250.00 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
3,400   |
LNFT |
2.00 |
6,800.00 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
4,000   |
LNFT |
2.00 |
8,000.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
250   |
LNFT |
2.00 |
500.00 |
|
|
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
175.0 |
SQYD |
109.00 |
19,075.00 |
|
|
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
200.0 |
SQYD |
109.00 |
21,800.00 |
|
|
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
1,500.0 |
SQYD |
109.00 |
163,500.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
10   |
EACH |
5,600.00 |
56,000.00 |
|
|
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
5   |
EACH |
7,800.00 |
39,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
500.00 |
3,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
25   |
EACH |
500.00 |
12,500.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
500.0 |
LNFT |
10.00 |
5,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,500.00 |
5,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
225   |
EACH |
5.00 |
1,125.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
300   |
LNFT |
1.00 |
300.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
48   |
LNFT |
3.00 |
144.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.520 |
MILE |
2,000.00 |
5,040.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.260 |
MILE |
900.00 |
1,134.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
136.00 |
544.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
190.00 |
380.00 |
|
|
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
440.00 |
440.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
375,032.00 |
|
|
|
|
|
|
|