| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AMERICAN CIVIL CONSTRUCTORS, INC. |
- 2 - SOIL EROSION SERVICES, INC. |
- 3 - LAMAY GROUP, LLC |
JAMES A. DECKER BUILDERS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,197.32 |
15,197.32 |
1,500.00 |
1,500.00 |
8,050.00 |
8,050.00 |
25,000.00 |
25,000.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
4,203.64 |
4,203.64 |
9,000.00 |
9,000.00 |
7,860.00 |
7,860.00 |
35,000.00 |
35,000.00 |
| 203-09-A |
geotextile fabric(nonwoven)
|
1,800   |
SQYD |
1.17 |
2,106.00 |
3.00 |
5,400.00 |
0.94 |
1,692.00 |
2.00 |
3,600.00 |
| 703-03-A |
perforated pipe underdrains(4" polyethelene drain pipe)
|
150   |
LNFT |
21.33 |
3,199.50 |
11.00 |
1,650.00 |
9.67 |
1,450.50 |
10.00 |
1,500.00 |
| 706-03-C |
incidental concrete paving (6" thick)(with
#3 reinforcing steel) |
165.0 |
SQYD |
64.50 |
10,642.50 |
70.00 |
11,550.00 |
119.00 |
19,635.00 |
100.00 |
16,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,796.19 |
6,796.19 |
9,000.00 |
9,000.00 |
4,200.00 |
4,200.00 |
10,000.00 |
10,000.00 |
| 714-01-A |
slab sodding(cynodon dactylon/common bermuda sod)
|
4,162   |
SQYD |
3.32 |
13,817.84 |
4.29 |
17,854.98 |
3.00 |
12,486.00 |
4.50 |
18,729.00 |
| 719-01-A |
plants (quercus virginiana/live oak, 5 1/2" - 6" cal.,
14'-16' min. ht., full spread) |
21   |
EACH |
1,225.46 |
25,734.66 |
900.00 |
18,900.00 |
1,392.00 |
29,232.00 |
1,200.00 |
25,200.00 |
| 719-01-B |
plants (lagerstroemia indica 'natchez'/natchez crape
myrtle, 8'-10'min ht, multi-trunk,3-5 canes min, b&b,4'min spread) |
16   |
EACH |
144.00 |
2,304.00 |
75.00 |
1,200.00 |
80.10 |
1,281.60 |
155.00 |
2,480.00 |
| 719-01-C |
plants (lagerstroemia indica'muscogee'/muscogee crape
myrtle, 8'-10'min ht' multi-trunk,3-5 canes min, b&b,4'min spread) |
18   |
EACH |
144.00 |
2,592.00 |
75.00 |
1,350.00 |
80.10 |
1,441.80 |
155.00 |
2,790.00 |
| 719-01-D |
plants (rahpiolepsis indica 'clara'/clara indian
hawthorn, 3 gal.,space 4' o.c., full plant) |
336   |
EACH |
10.27 |
3,450.72 |
7.50 |
2,520.00 |
80.90 |
27,182.40 |
14.25 |
4,788.00 |
| 719-01-E |
plants (pennisetum alopecuroides 'hameln'/hameln dwarf
fountain grass,3-gal . space 24" o.c., full plant) |
349   |
EACH |
10.27 |
3,584.23 |
8.00 |
2,792.00 |
80.90 |
28,234.10 |
14.00 |
4,886.00 |
| 719-01-F |
plants (nandina domestica 'harbour dwarf'/harbour
dwarf nandina,3-gal., space 24" o.c., full plant) |
554   |
EACH |
12.05 |
6,675.70 |
11.00 |
6,094.00 |
8.85 |
4,902.90 |
14.00 |
7,756.00 |
| 719-01-G |
plants (ilex crenata 'helleri'/helleri holly,3-gal.,
18", space 24" o.c., full plant) |
319   |
EACH |
10.27 |
3,276.13 |
10.00 |
3,190.00 |
8.90 |
2,839.10 |
14.00 |
4,466.00 |
| 719-01-H |
plants (iris pseudacarpus/yellow flag iris,1-gal.,
space 18' o.c., full plant) |
405   |
EACH |
3.44 |
1,393.20 |
3.50 |
1,417.50 |
4.45 |
1,802.25 |
6.00 |
2,430.00 |
| 719-01-I |
plants (hemerocallis fulva 'joyful centennial'/joyful
centennial daylily, 1-gal., space 18" o.c., full plant) |
151   |
EACH |
4.70 |
709.70 |
4.00 |
604.00 |
4.46 |
673.46 |
6.00 |
906.00 |
| 719-01-J |
plants (hemerocallis fulva 'ice carnival'/ice carnival
daylily, 1-gal., space 18" o.c., full plant) |
219   |
EACH |
4.70 |
1,029.30 |
4.00 |
876.00 |
4.50 |
985.50 |
6.00 |
1,314.00 |
| 719-01-K |
plants (hemerocallis fulva 'ruby red'/ruby red daylily,
1-gal,space 18"o.c. full plant) |
147   |
EACH |
4.70 |
690.90 |
4.00 |
588.00 |
4.45 |
654.15 |
6.00 |
882.00 |
| 719-01-L |
plants (lantana camara 'dallas red'/dallas red lantana,
1-gal,space 24"o.c. ,full plant) |
90   |
EACH |
6.02 |
541.80 |
4.00 |
360.00 |
3.58 |
322.20 |
6.00 |
540.00 |
| 719-01-M |
plants (lantana camara 'new gold'/new gold lantana,
1-gal.,space 24"o.c., full plant) |
170   |
EACH |
3.81 |
647.70 |
4.00 |
680.00 |
3.56 |
605.20 |
6.00 |
1,020.00 |
| 719-01-N |
plants (liriope muscari 'variegata'/variegated big
blue liriope, 4" pot, space 12" o.c.) |
808   |
EACH |
1.60 |
1,292.80 |
3.50 |
2,828.00 |
0.89 |
719.12 |
1.50 |
1,212.00 |
| 719-02-A |
top dressing mulch (4" min. depth)(cypress bark)
|
800   |
SQYD |
6.26 |
5,008.00 |
9.00 |
7,200.00 |
4.62 |
3,696.00 |
7.00 |
5,600.00 |
| 719-03 |
bed preparation (3 1/4" min. depth)
|
1,450   |
SQYD |
2.72 |
3,944.00 |
9.00 |
13,050.00 |
6.00 |
8,700.00 |
10.00 |
14,500.00 |
| 723-02-A |
granular material (vehicular measurement)(crushed
limestone or granite,u.s. sieve 2-inches (50 mm), 4" depth) |
200   |
CUYD |
61.15 |
12,230.00 |
80.00 |
16,000.00 |
53.40 |
10,680.00 |
75.00 |
15,000.00 |
| 723-02-B |
granular material (vehicular measurement)(crushed
limestone or granite,u.s. sieve 3/4" (19 mm), 3" depth) |
53   |
CUYD |
61.15 |
3,240.95 |
80.00 |
4,240.00 |
53.40 |
2,830.20 |
75.00 |
3,975.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
19,246.43 |
19,246.43 |
17,500.00 |
17,500.00 |
20,000.00 |
20,000.00 |
12,846.00 |
12,846.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
568.12 |
568.12 |
1,500.00 |
1,500.00 |
2,999.52 |
2,999.52 |
21,000.00 |
21,000.00 |
| S-001 |
irrigation system
|
lump |
LUMP |
35,661.06 |
35,661.06 |
34,500.00 |
34,500.00 |
52,132.00 |
52,132.00 |
40,000.00 |
40,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
189,784.39 |
|
193,344.48 |
|
257,287.00 |
|
IRREGULAR |
|