| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - D & J CONSTRUCTION CO., INC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
550.00 |
550.00 |
2,000.00 |
2,000.00 |
7,500.00 |
7,500.00 |
| 202-02-D |
removal of concrete walks & drives
|
151   |
SQYD |
25.00 |
3,775.00 |
2.20 |
332.20 |
8.00 |
1,208.00 |
10.00 |
1,510.00 |
| 202-02-H |
removal of guard rail
|
469   |
LNFT |
3.00 |
1,407.00 |
2.20 |
1,031.80 |
10.00 |
4,690.00 |
4.25 |
1,993.25 |
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
8.00 |
2,400.00 |
13.00 |
3,900.00 |
23.00 |
6,900.00 |
10.00 |
3,000.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,000   |
CUYD |
8.00 |
8,000.00 |
17.00 |
17,000.00 |
9.00 |
9,000.00 |
15.00 |
15,000.00 |
| 304-01 |
lime
|
1,404.85 |
TON |
99.75 |
140,133.78 |
115.00 |
161,557.75 |
99.75 |
140,133.78 |
100.00 |
140,485.00 |
| 304-04-B |
lime treatment (type d) (8 1/2" thick)
|
113,332   |
SQYD |
0.77 |
87,265.64 |
1.07 |
121,265.24 |
1.15 |
130,331.80 |
0.80 |
90,665.60 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,607   |
CUYD |
23.00 |
36,961.00 |
14.50 |
23,301.50 |
15.00 |
24,105.00 |
30.00 |
48,210.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
15,511.6 |
TON |
42.40 |
657,691.84 |
38.04 |
590,061.26 |
44.50 |
690,266.20 |
40.00 |
620,464.00 |
| 502-01-A-01 |
superpave asphaltic conc wearing course (level 1f)
|
9,319.4 |
TON |
42.40 |
395,142.56 |
44.75 |
417,043.15 |
45.50 |
424,032.70 |
42.50 |
396,074.50 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
2,356.7 |
TON |
42.40 |
99,924.08 |
60.00 |
141,402.00 |
45.50 |
107,229.85 |
60.00 |
141,402.00 |
| 509-01 |
cold planing asphaltic pavement
|
108,051   |
SQYD |
1.00 |
108,051.00 |
0.95 |
102,648.45 |
0.86 |
92,923.86 |
1.10 |
118,856.10 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,752   |
CUYD |
0.01 |
- 37.52 |
0.10 |
- 375.20 |
0.01 |
- 37.52 |
1.00 |
- 3,752.00 |
| 701-01-S |
cross drain pipe (72" rcp/cmp)
|
240   |
LNFT |
180.00 |
43,200.00 |
200.00 |
48,000.00 |
205.00 |
49,200.00 |
200.00 |
48,000.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
176   |
LNFT |
105.00 |
18,480.00 |
165.00 |
29,040.00 |
112.00 |
19,712.00 |
140.00 |
24,640.00 |
| 701-05-G |
side drain pipe (18")
|
24   |
LNFT |
28.00 |
672.00 |
49.00 |
1,176.00 |
38.00 |
912.00 |
80.00 |
1,920.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
100.00 |
1,600.00 |
230.00 |
3,680.00 |
230.00 |
3,680.00 |
135.00 |
2,160.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
775.00 |
1,550.00 |
800.00 |
1,600.00 |
1,500.00 |
3,000.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
42.00 |
4,200.00 |
40.00 |
4,000.00 |
43.00 |
4,300.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
118.0 |
LNFT |
35.00 |
4,130.00 |
38.00 |
4,484.00 |
35.00 |
4,130.00 |
38.00 |
4,484.00 |
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
16.00 |
1,400.00 |
17.00 |
1,487.50 |
16.00 |
1,400.00 |
17.50 |
1,531.25 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,650.00 |
6,600.00 |
1,750.00 |
7,000.00 |
1,650.00 |
6,600.00 |
1,800.00 |
7,200.00 |
| 710-01 |
flowable fill
|
191   |
CUYD |
66.00 |
12,606.00 |
78.00 |
14,898.00 |
72.00 |
13,752.00 |
100.00 |
19,100.00 |
| 711-01-C |
riprap (30 lb,12" thick)
|
625   |
SQYD |
40.00 |
25,000.00 |
42.00 |
26,250.00 |
40.00 |
25,000.00 |
45.00 |
28,125.00 |
| 711-04 |
geotextile fabric
|
625   |
SQYD |
2.50 |
1,562.50 |
2.20 |
1,375.00 |
2.50 |
1,562.50 |
1.50 |
937.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
5,000.00 |
5,000.00 |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.681 |
MILE |
250.00 |
3,420.25 |
200.00 |
2,736.20 |
200.00 |
2,736.20 |
325.00 |
4,446.32 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
46.569 |
MILE |
62.00 |
2,887.27 |
200.00 |
9,313.80 |
0.01 |
0.46 |
215.00 |
10,012.33 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
19.523 |
MILE |
1,000.00 |
19,523.00 |
400.00 |
7,809.20 |
1,200.00 |
23,427.60 |
430.00 |
8,394.89 |
| 720-01-A |
erosion control system, slope protection (type a)
|
172   |
SQYD |
0.85 |
146.20 |
1.00 |
172.00 |
0.85 |
146.20 |
1.00 |
172.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
7,500.00 |
7,500.00 |
| 726-01 |
bedding material
|
160.9 |
CUYD |
55.00 |
8,849.50 |
52.00 |
8,366.80 |
55.00 |
8,849.50 |
35.00 |
5,631.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
11,000.00 |
11,000.00 |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
240,000.00 |
240,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
18   |
EACH |
65.00 |
1,170.00 |
68.00 |
1,224.00 |
65.00 |
1,170.00 |
70.00 |
1,260.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,108   |
EACH |
5.50 |
6,094.00 |
4.50 |
4,986.00 |
3.90 |
4,321.20 |
5.00 |
5,540.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
24.00 |
528.00 |
3.00 |
66.00 |
24.00 |
528.00 |
3.25 |
71.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
26.832 |
MILE |
2,050.00 |
55,005.60 |
1,650.00 |
44,272.80 |
1,675.00 |
44,943.60 |
1,800.00 |
48,297.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.660 |
MILE |
850.00 |
3,961.00 |
600.00 |
2,796.00 |
750.00 |
3,495.00 |
650.00 |
3,029.00 |
| 735-01 |
mailboxes
|
114   |
EACH |
1.00 |
114.00 |
11.00 |
1,254.00 |
1.00 |
114.00 |
10.00 |
1,140.00 |
| 735-02 |
mailbox supports (single)
|
111   |
EACH |
118.00 |
13,098.00 |
125.00 |
13,875.00 |
85.00 |
9,435.00 |
100.00 |
11,100.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
170.00 |
170.00 |
335.00 |
335.00 |
125.00 |
125.00 |
150.00 |
150.00 |
| 739-01 |
hydro-seeding
|
6.00 |
ACRE |
838.00 |
5,028.00 |
850.00 |
5,100.00 |
838.00 |
5,028.00 |
900.00 |
5,400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
7,500.00 |
7,500.00 |
11,000.00 |
11,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
cement treated base course (12 in depth)
|
113,091   |
SQYD |
4.65 |
525,873.15 |
4.55 |
514,564.05 |
3.85 |
435,400.35 |
4.95 |
559,800.45 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,343,332.85 |
|
2,379,229.50 |
|
2,387,052.28 |
|
2,673,751.79 |
|