Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 018-04-0040
Parish: ST TAMMANY
Routes: US 11
Description: JCT. US 190 - JCT. I-12
Type Const: grading,cold planing asphaltic concrete,pavement patching pavement widening,superpave
asphaltic concrete overlay,and related work.
 
RankLicenseBidderAmount
106487 HUEY STOCKSTILL, INC. $769,324.85
202179 BOH BROS. CONSTRUCTION CO., LLC. $793,095.45
306276 BARRIERE CONSTRUCTION CO., LLC. $807,472.12
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $835,970.17
522040 COVINGTON PAVING CO. $1,024,712.10
634567 JAMES CONSTRUCTION GROUP LLC $1,094,135.65
 
Item Number Item Description Quantity Unit of Measure - 1 -
HUEY STOCKSTILL, INC.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
BARRIERE CONSTRUCTION CO., LLC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 731      LNFT 5.00 3,655.00 4.00 2,924.00 9.00 6,579.00 5.00 3,655.00
203-08 borrow (vehicular measurement) 1,425      CUYD 12.00 17,100.00 10.00 14,250.00 10.00 14,250.00 20.00 28,500.00
401-02 aggregate surface course (adjusted vehicular
measurement)
163      CUYD 42.00 6,846.00 50.00 8,150.00 35.00 5,705.00 25.00 4,075.00
502-01 superpave asphaltic concrete 6,862.5    TON 46.00 315,675.00 55.00 377,437.50 52.00 356,850.00 64.64 443,592.00
502-01-D superpave asphaltic concrete, incidental paving (level
a)
595.2    TON 80.00 47,616.00 70.00 41,664.00 70.00 41,664.00 83.35 49,609.92
509-01 cold planing asphaltic pavement 34,601      SQYD 1.20 41,521.20 1.75 60,551.75 1.60 55,361.60 1.50 51,901.50
509-02 contractor retained reclaimed asphaltic pavement - 1,087      CUYD FREE FREE 7.00 - 7,609.00 2.00 - 2,174.00 1.00 - 1,087.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 262.5    LNFT 47.00 12,337.50 50.00 13,125.00 31.00 8,137.50 53.00 13,912.50
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,656.0    LNFT 23.00 38,088.00 25.00 41,400.00 26.00 43,056.00 25.00 41,400.00
704-03 blocked out guard rail 212.6    LNFT 14.00 2,976.40 15.00 3,189.00 16.00 3,401.60 16.00 3,401.60
704-05 guard rail anchor sections (bct) 18.8    LNFT 44.00 827.20 50.00 940.00 57.00 1,071.60 50.00 940.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 37.00 3,700.00 40.00 4,000.00 37.00 3,700.00 41.00 4,100.00
704-11-A guard rail end treatment (flared) 1      EACH 1,500.00 1,500.00 1,500.00 1,500.00 1,800.00 1,800.00 1,700.00 1,700.00
704-11-B guard rail end treatment (tangent) 10      EACH 1,700.00 17,000.00 1,700.00 17,000.00 1,900.00 19,000.00 2,000.00 20,000.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 15,000.00 15,000.00 26,000.00 26,000.00 5,000.00 5,000.00
713-03-C temporary pavement markings (8" width) 2,025      LNFT 0.10 202.50 0.20 405.00 0.20 405.00 0.22 445.50
713-03-D temporary pavement markings (12" width) 648      LNFT 0.15 97.20 0.30 194.40 0.30 194.40 0.34 220.32
713-03-E temporary pavement markings (24" width) 1,794      LNFT 0.30 538.20 1.30 2,332.20 0.60 1,076.40 0.67 1,201.98
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.701  MILE 150.00 705.15 350.00 1,645.35 120.00 564.12 308.00 1,447.90
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.705  MILE 100.00 370.50 250.00 926.25 50.00 185.25 290.00 1,074.45
713-05-A temporary pavement markings (solid line)(4" width) 16.080  MILE 200.00 3,216.00 500.00 8,040.00 100.00 1,608.00 600.00 9,648.00
713-06-A temporary pavement legends and symbols (arrow) 51      EACH 10.00 510.00 40.00 2,040.00 10.00 510.00 45.00 2,295.00
713-06-B temporary pavement legends and symbols (double arrow) 9      EACH 10.00 90.00 60.00 540.00 10.00 90.00 67.00 603.00
713-06-C temporary pavement legends and symbols (only) 24      EACH 10.00 240.00 40.00 960.00 10.00 240.00 45.00 1,080.00
724-01-B pavement patching (12" minimum thickness) 500      SQYD 50.00 25,000.00 80.00 40,000.00 50.00 25,000.00 48.00 24,000.00
724-02 pavement widening 1,684.6    SQYD 30.00 50,538.00 37.00 62,330.20 39.00 65,699.40 25.00 42,115.00
727-01 mobilization lump      LUMP 76,000.00 76,000.00 25,000.00 25,000.00 80,000.00 80,000.00 20,000.00 20,000.00
729-16-C object marker assembly (type 3) 12      EACH 70.00 840.00 85.00 1,020.00 70.00 840.00 67.00 804.00
731-02 reflectorized raised pavement markers 599      EACH 6.00 3,594.00 5.35 3,204.65 5.50 3,294.50 6.00 3,594.00
732-01-C plastic pavement striping (8" width) 675      LNFT 1.00 675.00 0.70 472.50 1.00 675.00 1.00 675.00
732-01-D plastic pavement striping (12" width) 216      LNFT 2.00 432.00 1.35 291.60 1.50 324.00 1.50 324.00
732-01-E plastic pavement striping (24" width) 598      LNFT 3.00 1,794.00 2.65 1,584.70 3.00 1,794.00 3.00 1,794.00
732-02-A plastic pavement striping (solid line) (4" width) 5.360  MILE 2,000.00 10,720.00 1,800.00 9,648.00 1,900.00 10,184.00 2,000.00 10,720.00
732-03-A plastic pavement striping (broken line)(4" width) 1.235  MILE 1,000.00 1,235.00 610.00 753.35 650.00 802.75 700.00 864.50
732-04-A plastic pavement legends & symbols (arrow) 17      EACH 200.00 3,400.00 125.00 2,125.00 140.00 2,380.00 140.00 2,380.00
732-04-B plastic pavement legends & symbols (double arrow) 3      EACH 200.00 600.00 175.00 525.00 200.00 600.00 196.00 588.00
732-04-C plastic pavement legends & symbols (only) 8      EACH 200.00 1,600.00 150.00 1,200.00 170.00 1,360.00 168.00 1,344.00
735-01 mailboxes 19      EACH 10.00 190.00 6.00 114.00 5.00 95.00 14.00 266.00
735-02 mailbox supports (single) 19      EACH 200.00 3,800.00 150.00 2,850.00 140.00 2,660.00 150.00 2,850.00
736-09 loop detector 525      LNFT 15.00 7,875.00 11.00 5,775.00 11.00 5,775.00 12.00 6,300.00
739-01 hydro-seeding 1.90   acre 1,500.00 2,850.00 1,500.00 2,850.00 1,600.00 3,040.00 3,200.00 6,080.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 5,000.00 5,000.00 10,000.00 10,000.00
S-001 u-channel post installation 19      ea 50.00 950.00 75.00 1,425.00 77.00 1,463.00 84.00 1,596.00
S-002 milling portland cement concrete pavement (1" average
depth)
107      SQYD 60.00 6,420.00 3.00 321.00 30.00 3,210.00 37.00 3,959.00
S-003 cleaning existing ditches 1,000      LNFT 6.00 6,000.00 6.00 6,000.00 4.00 4,000.00 7.00 7,000.00
                       
 CONTRACTOR TOTAL       769,324.85   793,095.45   807,472.12   835,970.17
 
Item Number Item Description Quantity Unit of Measure - 5 -
COVINGTON PAVING CO.
- 6 -
JAMES CONSTRUCTION GROUP LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 731      LNFT 6.50 4,751.50 4.00 2,924.00        
203-08 borrow (vehicular measurement) 1,425      CUYD 13.50 19,237.50 25.00 35,625.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
163      CUYD 45.00 7,335.00 65.00 10,595.00        
502-01 superpave asphaltic concrete 6,862.5    TON 65.00 446,062.50 67.00 459,787.50        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
595.2    TON 65.00 38,688.00 100.00 59,520.00        
509-01 cold planing asphaltic pavement 34,601      SQYD 1.55 53,631.55 3.00 103,803.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,087      CUYD 2.00 - 2,174.00 5.00 - 5,435.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 262.5    LNFT 52.00 13,650.00 47.00 12,337.50        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,656.0    LNFT 25.00 41,400.00 23.00 38,088.00        
704-03 blocked out guard rail 212.6    LNFT 15.00 3,189.00 14.00 2,976.40        
704-05 guard rail anchor sections (bct) 18.8    LNFT 49.00 921.20 44.00 827.20        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 40.00 4,000.00 36.00 3,600.00        
704-11-A guard rail end treatment (flared) 1      EACH 1,665.00 1,665.00 1,500.00 1,500.00        
704-11-B guard rail end treatment (tangent) 10      EACH 1,890.00 18,900.00 1,700.00 17,000.00        
713-01 temporary signs & barricades lump      LUMP 74,000.00 74,000.00 105,000.00 105,000.00        
713-03-C temporary pavement markings (8" width) 2,025      LNFT 0.22 445.50 0.20 405.00        
713-03-D temporary pavement markings (12" width) 648      LNFT 0.33 213.84 0.30 194.40        
713-03-E temporary pavement markings (24" width) 1,794      LNFT 0.66 1,184.04 0.60 1,076.40        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.701  MILE 400.00 1,880.40 650.00 3,055.65        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.705  MILE 283.00 1,048.51 260.00 963.30        
713-05-A temporary pavement markings (solid line)(4" width) 16.080  MILE 567.00 9,117.36 515.00 8,281.20        
713-06-A temporary pavement legends and symbols (arrow) 51      EACH 44.00 2,244.00 40.00 2,040.00        
713-06-B temporary pavement legends and symbols (double arrow) 9      EACH 66.00 594.00 60.00 540.00        
713-06-C temporary pavement legends and symbols (only) 24      EACH 44.00 1,056.00 40.00 960.00        
724-01-B pavement patching (12" minimum thickness) 500      SQYD 100.00 50,000.00 64.00 32,000.00        
724-02 pavement widening 1,684.6    SQYD 64.00 107,814.40 35.00 58,961.00        
727-01 mobilization lump      LUMP 69,000.00 69,000.00 74,000.00 74,000.00        
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00 60.00 720.00        
731-02 reflectorized raised pavement markers 599      EACH 5.90 3,534.10 5.50 3,294.50        
732-01-C plastic pavement striping (8" width) 675      LNFT 0.75 506.25 0.70 472.50        
732-01-D plastic pavement striping (12" width) 216      LNFT 1.45 313.20 1.30 280.80        
732-01-E plastic pavement striping (24" width) 598      LNFT 2.90 1,734.20 2.70 1,614.60        
732-02-A plastic pavement striping (solid line) (4" width) 5.360  MILE 1,960.00 10,505.60 1,800.00 9,648.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.235  MILE 670.00 827.45 620.00 765.70        
732-04-A plastic pavement legends & symbols (arrow) 17      EACH 138.00 2,346.00 125.00 2,125.00        
732-04-B plastic pavement legends & symbols (double arrow) 3      EACH 195.00 585.00 175.00 525.00        
732-04-C plastic pavement legends & symbols (only) 8      EACH 165.00 1,320.00 150.00 1,200.00        
735-01 mailboxes 19      EACH 10.00 190.00 1.00 19.00        
735-02 mailbox supports (single) 19      EACH 210.00 3,990.00 95.00 1,805.00        
736-09 loop detector 525      LNFT 11.00 5,775.00 10.00 5,250.00        
739-01 hydro-seeding 1.90   acre 2,000.00 3,800.00 1,700.00 3,230.00        
740-01 construction layout lump      LUMP 12,000.00 12,000.00 20,000.00 20,000.00        
S-001 u-channel post installation 19      ea 75.00 1,425.00 60.00 1,140.00        
S-002 milling portland cement concrete pavement (1" average
depth)
107      SQYD 15.00 1,605.00 60.00 6,420.00        
S-003 cleaning existing ditches 1,000      LNFT 3.50 3,500.00 5.00 5,000.00        
                       
 CONTRACTOR TOTAL       1,024,712.10   1,094,135.65        