| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
731   |
LNFT |
5.00 |
3,655.00 |
4.00 |
2,924.00 |
9.00 |
6,579.00 |
5.00 |
3,655.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,425   |
CUYD |
12.00 |
17,100.00 |
10.00 |
14,250.00 |
10.00 |
14,250.00 |
20.00 |
28,500.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
163   |
CUYD |
42.00 |
6,846.00 |
50.00 |
8,150.00 |
35.00 |
5,705.00 |
25.00 |
4,075.00 |
| 502-01 |
superpave asphaltic concrete
|
6,862.5 |
TON |
46.00 |
315,675.00 |
55.00 |
377,437.50 |
52.00 |
356,850.00 |
64.64 |
443,592.00 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
595.2 |
TON |
80.00 |
47,616.00 |
70.00 |
41,664.00 |
70.00 |
41,664.00 |
83.35 |
49,609.92 |
| 509-01 |
cold planing asphaltic pavement
|
34,601   |
SQYD |
1.20 |
41,521.20 |
1.75 |
60,551.75 |
1.60 |
55,361.60 |
1.50 |
51,901.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,087   |
CUYD |
FREE |
FREE |
7.00 |
- 7,609.00 |
2.00 |
- 2,174.00 |
1.00 |
- 1,087.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
262.5 |
LNFT |
47.00 |
12,337.50 |
50.00 |
13,125.00 |
31.00 |
8,137.50 |
53.00 |
13,912.50 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,656.0 |
LNFT |
23.00 |
38,088.00 |
25.00 |
41,400.00 |
26.00 |
43,056.00 |
25.00 |
41,400.00 |
| 704-03 |
blocked out guard rail
|
212.6 |
LNFT |
14.00 |
2,976.40 |
15.00 |
3,189.00 |
16.00 |
3,401.60 |
16.00 |
3,401.60 |
| 704-05 |
guard rail anchor sections (bct)
|
18.8 |
LNFT |
44.00 |
827.20 |
50.00 |
940.00 |
57.00 |
1,071.60 |
50.00 |
940.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
37.00 |
3,700.00 |
40.00 |
4,000.00 |
37.00 |
3,700.00 |
41.00 |
4,100.00 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,800.00 |
1,800.00 |
1,700.00 |
1,700.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
10   |
EACH |
1,700.00 |
17,000.00 |
1,700.00 |
17,000.00 |
1,900.00 |
19,000.00 |
2,000.00 |
20,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
26,000.00 |
26,000.00 |
5,000.00 |
5,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
2,025   |
LNFT |
0.10 |
202.50 |
0.20 |
405.00 |
0.20 |
405.00 |
0.22 |
445.50 |
| 713-03-D |
temporary pavement markings (12" width)
|
648   |
LNFT |
0.15 |
97.20 |
0.30 |
194.40 |
0.30 |
194.40 |
0.34 |
220.32 |
| 713-03-E |
temporary pavement markings (24" width)
|
1,794   |
LNFT |
0.30 |
538.20 |
1.30 |
2,332.20 |
0.60 |
1,076.40 |
0.67 |
1,201.98 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.701 |
MILE |
150.00 |
705.15 |
350.00 |
1,645.35 |
120.00 |
564.12 |
308.00 |
1,447.90 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.705 |
MILE |
100.00 |
370.50 |
250.00 |
926.25 |
50.00 |
185.25 |
290.00 |
1,074.45 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
16.080 |
MILE |
200.00 |
3,216.00 |
500.00 |
8,040.00 |
100.00 |
1,608.00 |
600.00 |
9,648.00 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
51   |
EACH |
10.00 |
510.00 |
40.00 |
2,040.00 |
10.00 |
510.00 |
45.00 |
2,295.00 |
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
9   |
EACH |
10.00 |
90.00 |
60.00 |
540.00 |
10.00 |
90.00 |
67.00 |
603.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
24   |
EACH |
10.00 |
240.00 |
40.00 |
960.00 |
10.00 |
240.00 |
45.00 |
1,080.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
50.00 |
25,000.00 |
80.00 |
40,000.00 |
50.00 |
25,000.00 |
48.00 |
24,000.00 |
| 724-02 |
pavement widening
|
1,684.6 |
SQYD |
30.00 |
50,538.00 |
37.00 |
62,330.20 |
39.00 |
65,699.40 |
25.00 |
42,115.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
76,000.00 |
76,000.00 |
25,000.00 |
25,000.00 |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
70.00 |
840.00 |
85.00 |
1,020.00 |
70.00 |
840.00 |
67.00 |
804.00 |
| 731-02 |
reflectorized raised pavement markers
|
599   |
EACH |
6.00 |
3,594.00 |
5.35 |
3,204.65 |
5.50 |
3,294.50 |
6.00 |
3,594.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
675   |
LNFT |
1.00 |
675.00 |
0.70 |
472.50 |
1.00 |
675.00 |
1.00 |
675.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
216   |
LNFT |
2.00 |
432.00 |
1.35 |
291.60 |
1.50 |
324.00 |
1.50 |
324.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
598   |
LNFT |
3.00 |
1,794.00 |
2.65 |
1,584.70 |
3.00 |
1,794.00 |
3.00 |
1,794.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.360 |
MILE |
2,000.00 |
10,720.00 |
1,800.00 |
9,648.00 |
1,900.00 |
10,184.00 |
2,000.00 |
10,720.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.235 |
MILE |
1,000.00 |
1,235.00 |
610.00 |
753.35 |
650.00 |
802.75 |
700.00 |
864.50 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
17   |
EACH |
200.00 |
3,400.00 |
125.00 |
2,125.00 |
140.00 |
2,380.00 |
140.00 |
2,380.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
3   |
EACH |
200.00 |
600.00 |
175.00 |
525.00 |
200.00 |
600.00 |
196.00 |
588.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
EACH |
200.00 |
1,600.00 |
150.00 |
1,200.00 |
170.00 |
1,360.00 |
168.00 |
1,344.00 |
| 735-01 |
mailboxes
|
19   |
EACH |
10.00 |
190.00 |
6.00 |
114.00 |
5.00 |
95.00 |
14.00 |
266.00 |
| 735-02 |
mailbox supports (single)
|
19   |
EACH |
200.00 |
3,800.00 |
150.00 |
2,850.00 |
140.00 |
2,660.00 |
150.00 |
2,850.00 |
| 736-09 |
loop detector
|
525   |
LNFT |
15.00 |
7,875.00 |
11.00 |
5,775.00 |
11.00 |
5,775.00 |
12.00 |
6,300.00 |
| 739-01 |
hydro-seeding
|
1.90 |
acre |
1,500.00 |
2,850.00 |
1,500.00 |
2,850.00 |
1,600.00 |
3,040.00 |
3,200.00 |
6,080.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
| S-001 |
u-channel post installation
|
19   |
ea |
50.00 |
950.00 |
75.00 |
1,425.00 |
77.00 |
1,463.00 |
84.00 |
1,596.00 |
| S-002 |
milling portland cement concrete pavement (1" average
depth) |
107   |
SQYD |
60.00 |
6,420.00 |
3.00 |
321.00 |
30.00 |
3,210.00 |
37.00 |
3,959.00 |
| S-003 |
cleaning existing ditches
|
1,000   |
LNFT |
6.00 |
6,000.00 |
6.00 |
6,000.00 |
4.00 |
4,000.00 |
7.00 |
7,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
769,324.85 |
|
793,095.45 |
|
807,472.12 |
|
835,970.17 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - COVINGTON PAVING CO. |
- 6 - JAMES CONSTRUCTION GROUP LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
731   |
LNFT |
6.50 |
4,751.50 |
4.00 |
2,924.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,425   |
CUYD |
13.50 |
19,237.50 |
25.00 |
35,625.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
163   |
CUYD |
45.00 |
7,335.00 |
65.00 |
10,595.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,862.5 |
TON |
65.00 |
446,062.50 |
67.00 |
459,787.50 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
595.2 |
TON |
65.00 |
38,688.00 |
100.00 |
59,520.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
34,601   |
SQYD |
1.55 |
53,631.55 |
3.00 |
103,803.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,087   |
CUYD |
2.00 |
- 2,174.00 |
5.00 |
- 5,435.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
262.5 |
LNFT |
52.00 |
13,650.00 |
47.00 |
12,337.50 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,656.0 |
LNFT |
25.00 |
41,400.00 |
23.00 |
38,088.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
212.6 |
LNFT |
15.00 |
3,189.00 |
14.00 |
2,976.40 |
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
18.8 |
LNFT |
49.00 |
921.20 |
44.00 |
827.20 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
36.00 |
3,600.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,665.00 |
1,665.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
10   |
EACH |
1,890.00 |
18,900.00 |
1,700.00 |
17,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
74,000.00 |
74,000.00 |
105,000.00 |
105,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,025   |
LNFT |
0.22 |
445.50 |
0.20 |
405.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
648   |
LNFT |
0.33 |
213.84 |
0.30 |
194.40 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,794   |
LNFT |
0.66 |
1,184.04 |
0.60 |
1,076.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.701 |
MILE |
400.00 |
1,880.40 |
650.00 |
3,055.65 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.705 |
MILE |
283.00 |
1,048.51 |
260.00 |
963.30 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
16.080 |
MILE |
567.00 |
9,117.36 |
515.00 |
8,281.20 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
51   |
EACH |
44.00 |
2,244.00 |
40.00 |
2,040.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
9   |
EACH |
66.00 |
594.00 |
60.00 |
540.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
24   |
EACH |
44.00 |
1,056.00 |
40.00 |
960.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
100.00 |
50,000.00 |
64.00 |
32,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
1,684.6 |
SQYD |
64.00 |
107,814.40 |
35.00 |
58,961.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
69,000.00 |
69,000.00 |
74,000.00 |
74,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
75.00 |
900.00 |
60.00 |
720.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
599   |
EACH |
5.90 |
3,534.10 |
5.50 |
3,294.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
675   |
LNFT |
0.75 |
506.25 |
0.70 |
472.50 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
216   |
LNFT |
1.45 |
313.20 |
1.30 |
280.80 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
598   |
LNFT |
2.90 |
1,734.20 |
2.70 |
1,614.60 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.360 |
MILE |
1,960.00 |
10,505.60 |
1,800.00 |
9,648.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.235 |
MILE |
670.00 |
827.45 |
620.00 |
765.70 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
17   |
EACH |
138.00 |
2,346.00 |
125.00 |
2,125.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
3   |
EACH |
195.00 |
585.00 |
175.00 |
525.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
EACH |
165.00 |
1,320.00 |
150.00 |
1,200.00 |
|
|
|
|
| 735-01 |
mailboxes
|
19   |
EACH |
10.00 |
190.00 |
1.00 |
19.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
19   |
EACH |
210.00 |
3,990.00 |
95.00 |
1,805.00 |
|
|
|
|
| 736-09 |
loop detector
|
525   |
LNFT |
11.00 |
5,775.00 |
10.00 |
5,250.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.90 |
acre |
2,000.00 |
3,800.00 |
1,700.00 |
3,230.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
u-channel post installation
|
19   |
ea |
75.00 |
1,425.00 |
60.00 |
1,140.00 |
|
|
|
|
| S-002 |
milling portland cement concrete pavement (1" average
depth) |
107   |
SQYD |
15.00 |
1,605.00 |
60.00 |
6,420.00 |
|
|
|
|
| S-003 |
cleaning existing ditches
|
1,000   |
LNFT |
3.50 |
3,500.00 |
5.00 |
5,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,024,712.10 |
|
1,094,135.65 |
|
|
|
|
|