| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
162   |
LNFT |
12.50 |
2,025.00 |
4.00 |
648.00 |
10.00 |
1,620.00 |
3.50 |
567.00 |
| 203-08 |
borrow (vehicular measurement)
|
550   |
CUYD |
12.75 |
7,012.50 |
31.00 |
17,050.00 |
20.00 |
11,000.00 |
18.00 |
9,900.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,208   |
CUYD |
28.75 |
92,230.00 |
32.00 |
102,656.00 |
50.00 |
160,400.00 |
16.75 |
53,734.00 |
| 502-01-A |
superpave asphaltic concrete (level 1)
|
21,291.8 |
TON |
42.60 |
907,030.68 |
50.12 |
1,067,145.01 |
47.50 |
1,011,360.50 |
55.00 |
1,171,049.00 |
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
1,295.8 |
TON |
69.00 |
89,410.20 |
75.30 |
97,573.74 |
65.00 |
84,227.00 |
68.00 |
88,114.40 |
| 507-01-B |
asphaltic surface treatment (2 applications)
|
102,859   |
SQYD |
1.96 |
201,603.64 |
2.50 |
257,147.50 |
1.75 |
180,003.25 |
1.91 |
196,460.69 |
| 509-01 |
cold planing asphaltic pavement
|
102,859   |
SQYD |
0.51 |
52,458.09 |
1.00 |
102,859.00 |
1.00 |
102,859.00 |
1.68 |
172,803.12 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,143   |
CUYD |
1.00 |
- 2,143.00 |
0.10 |
- 214.30 |
0.01 |
- 21.43 |
0.01 |
- 21.43 |
| 701-01-U |
cross drain pipe (84" rcp/pcp)
|
60   |
LNFT |
460.00 |
27,600.00 |
470.00 |
28,200.00 |
450.00 |
27,000.00 |
433.00 |
25,980.00 |
| 701-10-I |
reinforced concrete pipe(extension)(24")
|
8   |
LNFT |
310.00 |
2,480.00 |
150.00 |
1,200.00 |
300.00 |
2,400.00 |
75.00 |
600.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
47.20 |
7,080.00 |
42.00 |
6,300.00 |
50.00 |
7,500.00 |
41.00 |
6,150.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
100.0 |
LNFT |
22.25 |
2,225.00 |
35.00 |
3,500.00 |
21.00 |
2,100.00 |
35.00 |
3,500.00 |
| 704-01-D |
guard rail (double thrie beam)(6'-3" post spacing)
|
50.0 |
LNFT |
30.75 |
1,537.50 |
38.00 |
1,900.00 |
30.00 |
1,500.00 |
43.00 |
2,150.00 |
| 704-03 |
blocked out guard rail
|
587.5 |
LNFT |
14.60 |
8,577.50 |
17.00 |
9,987.50 |
15.00 |
8,812.50 |
17.00 |
9,987.50 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,620.00 |
6,480.00 |
1,650.00 |
6,600.00 |
1,600.00 |
6,400.00 |
1,615.00 |
6,460.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
1,850.00 |
7,400.00 |
2,100.00 |
8,400.00 |
1,800.00 |
7,200.00 |
2,027.00 |
8,108.00 |
| 710-01 |
flowable fill
|
57   |
CUYD |
90.00 |
5,130.00 |
77.00 |
4,389.00 |
90.00 |
5,130.00 |
104.00 |
5,928.00 |
| 711-01-C |
riprap (30 lb, 12" thick)
|
65   |
SQYD |
58.30 |
3,789.50 |
50.00 |
3,250.00 |
60.00 |
3,900.00 |
52.00 |
3,380.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
25,680.00 |
25,680.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
100   |
LNFT |
0.21 |
21.00 |
0.42 |
42.00 |
0.20 |
20.00 |
0.46 |
46.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.870 |
MILE |
260.00 |
5,686.20 |
295.00 |
6,451.65 |
225.00 |
4,920.75 |
405.00 |
8,857.35 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.151 |
MILE |
240.00 |
1,716.24 |
295.00 |
2,109.54 |
425.00 |
3,039.17 |
275.00 |
1,966.52 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
15.995 |
MILE |
450.00 |
7,197.75 |
360.00 |
5,758.20 |
250.00 |
3,998.75 |
537.00 |
8,589.31 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
1   |
EACH |
84.80 |
84.80 |
50.00 |
50.00 |
80.00 |
80.00 |
67.00 |
67.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
1   |
EACH |
95.40 |
95.40 |
47.00 |
47.00 |
90.00 |
90.00 |
67.00 |
67.00 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
1   |
EACH |
212.00 |
212.00 |
280.00 |
280.00 |
200.00 |
200.00 |
231.00 |
231.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
996   |
EACH |
1.76 |
1,752.96 |
1.50 |
1,494.00 |
1.25 |
1,245.00 |
1.16 |
1,155.36 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,458   |
SQYD |
46.75 |
68,161.50 |
57.00 |
83,106.00 |
52.00 |
75,816.00 |
48.00 |
69,984.00 |
| 726-01 |
bedding material
|
326.3 |
CUYD |
95.40 |
31,129.02 |
49.00 |
15,988.70 |
90.00 |
29,367.00 |
56.00 |
18,272.80 |
| 727-01 |
mobilization
|
lump |
LUMP |
63,500.00 |
63,500.00 |
16,000.00 |
16,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
53.00 |
424.00 |
71.00 |
568.00 |
50.00 |
400.00 |
69.00 |
552.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
69.00 |
552.00 |
83.00 |
664.00 |
65.00 |
520.00 |
79.00 |
632.00 |
| 731-02 |
reflectorized raised pavement markers
|
996   |
EACH |
4.25 |
4,233.00 |
5.50 |
5,478.00 |
4.00 |
3,984.00 |
6.00 |
5,976.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
100   |
LNFT |
1.05 |
105.00 |
1.18 |
118.00 |
1.00 |
100.00 |
0.47 |
47.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.995 |
MILE |
1,750.00 |
27,991.25 |
2,100.00 |
33,589.50 |
1,700.00 |
27,191.50 |
2,054.00 |
32,853.73 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.151 |
MILE |
640.00 |
4,576.64 |
850.00 |
6,078.35 |
600.00 |
4,290.60 |
772.00 |
5,520.57 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
133.00 |
133.00 |
153.00 |
153.00 |
150.00 |
150.00 |
157.00 |
157.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
133.00 |
133.00 |
175.00 |
175.00 |
150.00 |
150.00 |
220.00 |
220.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
425.00 |
425.00 |
535.00 |
535.00 |
150.00 |
150.00 |
460.00 |
460.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
11,500.00 |
11,500.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
129.37 |
CUYD |
795.00 |
102,849.15 |
765.00 |
98,968.05 |
750.00 |
97,027.50 |
900.00 |
116,433.00 |
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
26.0 |
LNFT |
745.00 |
19,370.00 |
618.00 |
16,068.00 |
700.00 |
18,200.00 |
433.00 |
11,258.00 |
| 805-12-B |
reinforced concrete box culverts (5'x 3')
|
48.0 |
LNFT |
795.00 |
38,160.00 |
650.00 |
31,200.00 |
750.00 |
36,000.00 |
467.00 |
22,416.00 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
76.0 |
LNFT |
765.00 |
58,140.00 |
706.00 |
53,656.00 |
720.00 |
54,720.00 |
266.00 |
20,216.00 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
104.0 |
LNFT |
820.00 |
85,280.00 |
825.00 |
85,800.00 |
800.00 |
83,200.00 |
798.00 |
82,992.00 |
| 806-01 |
deformed reinforcing steel
|
7,136   |
LB |
1.22 |
8,705.92 |
1.76 |
12,559.36 |
1.20 |
8,563.20 |
0.75 |
5,352.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,962,561.44 |
|
2,232,708.80 |
|
2,286,814.29 |
|
2,324,171.92 |
|