Letting of 3/03/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 002-03-0039
Parish: RICHLAND
Routes: US 80
Description: HOLLY RIDGE - DUNN
Type Const: drainage structures,pavement patching,cold planing asph pavement,asph surface treatment,
superpave asph concrete overlay,and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,140,670.69
205789 D & J CONSTRUCTION CO., INC. $1,195,685.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 15,500.00 15,500.00 2,500.00 2,500.00        
202-02-H removal of guard rail 2,349      LNFT 3.00 7,047.00 5.00 11,745.00        
203-08 borrow (vehicular measurement) 2,000      CUYD 11.74 23,480.00 14.00 28,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
776      CUYD 43.43 33,701.68 20.00 15,520.00        
502-01-A superpave asphaltic concrete (level 1) 6,776.3    TON 52.26 354,129.43 48.00 325,262.40        
502-01-D superpave asphaltic concrete, incidental paving (level
a)
859.4    TON 138.05 118,640.17 75.00 64,455.00        
507-01-B asphaltic surface treatment (2 applications) 39,132      SQYD 1.82 71,220.24 2.00 78,264.00        
509-01 cold planing asphaltic pavement 39,132      SQYD 1.39 54,393.48 2.00 78,264.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,120      CUYD 0.15 - 318.00 0.01 - 21.20        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,415.5    LNFT 22.00 31,141.00 20.00 28,310.00        
704-03 blocked out guard rail 443.9    LNFT 15.40 6,836.06 14.00 6,214.60        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 33.00 1,650.00 30.00 1,500.00        
704-08-B guard rail transitions (double thrie beam) 400.0    LNFT 38.50 15,400.00 35.00 14,000.00        
704-11-A guard rail end treatment (flared) 12      EACH 1,595.00 19,140.00 1,450.00 17,400.00        
713-01 temporary signs & barricades lump      LUMP 5,500.00 5,500.00 75,000.00 75,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.380  MILE 275.00 2,304.50 160.00 1,340.80        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.211  MILE 248.00 1,540.32 250.00 1,552.75        
713-05-A temporary pavement markings (solid line)(4" width) 23.400  MILE 467.50 10,939.50 300.00 7,020.00        
713-07-A temporary reflectorized raised pavement markers (tabs) 370      EACH 1.65 610.50 1.00 370.00        
714-02 water 20.3    MGAL 0.22 4.46 1.00 20.30        
716-01-A mulch (vegetative) 2.03   ACRE 880.00 1,786.40 550.00 1,116.50        
717-01 seeding 91      LB 6.60 600.60 10.00 910.00        
718-01 fertilizer 2,030      LB 0.22 446.60 0.30 609.00        
724-01-C pavement patching (18" minimum thickness) 500      SQYD 77.74 38,870.00 90.00 45,000.00        
724-03 pavement joint repair 1,200.0    TON 118.76 142,512.00 100.00 120,000.00        
726-01 bedding material 69.6    CUYD 55.00 3,828.00 70.00 4,872.00        
727-01 mobilization lump      LUMP 54,100.00 54,100.00 110,000.00 110,000.00        
729-16-C object marker assembly (type 3) 12      EACH 71.50 858.00 65.00 780.00        
731-02 reflectorized raised pavement markers 369      EACH 4.95 1,826.55 8.00 2,952.00        
732-02-A plastic pavement striping (solid line) (4" width) 7.800  MILE 1,845.00 14,391.00 2,900.00 22,620.00        
732-03-A plastic pavement striping (broken line)(4" width) 2.070  MILE 660.00 1,366.20 1,350.00 2,794.50        
735-01 mailboxes 5      EACH 15.00 75.00 1.00 5.00        
735-02 mailbox supports (single) 2      EACH 238.00 476.00 130.00 260.00        
735-04 mailbox supports (multiple) 1      EACH 513.00 513.00 350.00 350.00        
740-01 construction layout lump      LUMP 10,450.00 10,450.00 12,000.00 12,000.00        
805-01-B class a concrete (box culvert headwalls) 26.71   CUYD 660.00 17,628.60 1,120.00 29,915.20        
805-12-E-01 reinforced concrete box culverts (extension)(4'x 4') 100.0    LNFT 440.00 44,000.00 425.00 42,500.00        
805-12-Y-01 reinforced concrete box culverts (extension)(3'x 3') 80.0    LNFT 385.00 30,800.00 465.00 37,200.00        
806-01 deformed reinforcing steel 2,084      LB 1.10 2,292.40 1.00 2,084.00        
S-001 cleaning existing ditches 300      LNFT 3.30 990.00 10.00 3,000.00        
                       
 CONTRACTOR TOTAL       1,140,670.69   1,195,685.85        