| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,500.00 |
15,500.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
2,349   |
LNFT |
3.00 |
7,047.00 |
5.00 |
11,745.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,000   |
CUYD |
11.74 |
23,480.00 |
14.00 |
28,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
776   |
CUYD |
43.43 |
33,701.68 |
20.00 |
15,520.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (level 1)
|
6,776.3 |
TON |
52.26 |
354,129.43 |
48.00 |
325,262.40 |
|
|
|
|
| 502-01-D |
superpave asphaltic concrete, incidental paving (level
a) |
859.4 |
TON |
138.05 |
118,640.17 |
75.00 |
64,455.00 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
39,132   |
SQYD |
1.82 |
71,220.24 |
2.00 |
78,264.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
39,132   |
SQYD |
1.39 |
54,393.48 |
2.00 |
78,264.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,120   |
CUYD |
0.15 |
- 318.00 |
0.01 |
- 21.20 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,415.5 |
LNFT |
22.00 |
31,141.00 |
20.00 |
28,310.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
443.9 |
LNFT |
15.40 |
6,836.06 |
14.00 |
6,214.60 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
33.00 |
1,650.00 |
30.00 |
1,500.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
38.50 |
15,400.00 |
35.00 |
14,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
1,595.00 |
19,140.00 |
1,450.00 |
17,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,500.00 |
5,500.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.380 |
MILE |
275.00 |
2,304.50 |
160.00 |
1,340.80 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.211 |
MILE |
248.00 |
1,540.32 |
250.00 |
1,552.75 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.400 |
MILE |
467.50 |
10,939.50 |
300.00 |
7,020.00 |
|
|
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
370   |
EACH |
1.65 |
610.50 |
1.00 |
370.00 |
|
|
|
|
| 714-02 |
water
|
20.3 |
MGAL |
0.22 |
4.46 |
1.00 |
20.30 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.03 |
ACRE |
880.00 |
1,786.40 |
550.00 |
1,116.50 |
|
|
|
|
| 717-01 |
seeding
|
91   |
LB |
6.60 |
600.60 |
10.00 |
910.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,030   |
LB |
0.22 |
446.60 |
0.30 |
609.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
500   |
SQYD |
77.74 |
38,870.00 |
90.00 |
45,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,200.0 |
TON |
118.76 |
142,512.00 |
100.00 |
120,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
69.6 |
CUYD |
55.00 |
3,828.00 |
70.00 |
4,872.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
54,100.00 |
54,100.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
71.50 |
858.00 |
65.00 |
780.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
369   |
EACH |
4.95 |
1,826.55 |
8.00 |
2,952.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.800 |
MILE |
1,845.00 |
14,391.00 |
2,900.00 |
22,620.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.070 |
MILE |
660.00 |
1,366.20 |
1,350.00 |
2,794.50 |
|
|
|
|
| 735-01 |
mailboxes
|
5   |
EACH |
15.00 |
75.00 |
1.00 |
5.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
238.00 |
476.00 |
130.00 |
260.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
513.00 |
513.00 |
350.00 |
350.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,450.00 |
10,450.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.71 |
CUYD |
660.00 |
17,628.60 |
1,120.00 |
29,915.20 |
|
|
|
|
| 805-12-E-01 |
reinforced concrete box culverts (extension)(4'x 4')
|
100.0 |
LNFT |
440.00 |
44,000.00 |
425.00 |
42,500.00 |
|
|
|
|
| 805-12-Y-01 |
reinforced concrete box culverts (extension)(3'x 3')
|
80.0 |
LNFT |
385.00 |
30,800.00 |
465.00 |
37,200.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,084   |
LB |
1.10 |
2,292.40 |
1.00 |
2,084.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
300   |
LNFT |
3.30 |
990.00 |
10.00 |
3,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,140,670.69 |
|
1,195,685.85 |
|
|
|
|
|