LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 030-04-0029
Parish: Washington
Routes: LA 21
Description: JCT. LA 10 - N. JCT. LA 436
Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost: $3,424,038.78


RankLicenseBidderConstruction Bid
1 12487 Diamond B Construction Co., L.L.C. $2,754,964.81
2 06276 Barriere Construction Co., LLC. $2,852,182.12
3 06487 Huey Stockstill, Inc. $3,170,779.95
4 02179 Boh Bros. Construction Co., LLC. $3,643,582.78


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Barriere Construction Co., LLC.
- 3 -
Huey Stockstill, Inc.
- 4 -
Boh Bros. Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 2,120      LNFT 2.00 4,240.00 3.00 6,360.00 2.00 4,240.00 7.00 14,840.00
0002 202-02-38300 Removal of Sign and U-Channel Post 16      EACH 66.00 1,056.00 11.00 176.00 10.00 160.00 11.00 176.00
0003 203-07-00100 Borrow (Vehicular Measurement) 2,376      CUYD 15.00 35,640.00 6.00 14,256.00 12.00 28,512.00 10.00 23,760.00
0004 204-06-00100 Temporary Silt Fencing 2,930      LNFT 1.50 4,395.00 1.50 4,395.00 1.40 4,102.00 1.40 4,102.00
0005 502-01-00100 Superpave Asphaltic Concrete 30,962.2    TON 57.75 1,788,067.05 65.00 2,012,543.00 68.00 2,105,429.60 80.00 2,476,976.00
0006 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,300.8    TON 95.00 123,576.00 1.00 1,300.80 68.00 88,454.40 100.00 130,080.00
0007 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 47,494      GAL 3.15 149,606.10 3.00 142,482.00 3.20 151,980.80 3.20 151,980.80
0008 507-02-00200 Aggregate (S2) 69,844      SQYD 0.95 66,351.80 1.00 69,844.00 1.00 69,844.00 1.00 69,844.00
0009 507-02-00300 Aggregate (S3) 69,844      SQYD 0.80 55,875.20 0.50 34,922.00 0.80 55,875.20 0.80 55,875.20
0010 509-01-00100 Cold Planing Asphaltic Pavement 84,960      SQYD 1.40 118,944.00 1.20 101,952.00 1.10 93,456.00 2.00 169,920.00
0011 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,425      CUYD 0.10 -442.50 1.00 -4,425.00 0.00 0.00 10.00 -44,250.00
0012 510-01-00200 Pavement Patching (12" Minimum Thickness) 1,500      SQYD 69.00 103,500.00 50.00 75,000.00 100.00 150,000.00 85.00 127,500.00
0013 602-05-01160 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) 6      SQYD 1,000.00 6,000.00 500.00 3,000.00 250.00 1,500.00 1,000.00 6,000.00
0014 702-04-00100 Adjusting Manholes 8      EACH 1,500.00 12,000.00 500.00 4,000.00 150.00 1,200.00 250.00 2,000.00
0015 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 1,120      LNFT 31.00 34,720.00 30.00 33,600.00 30.00 33,600.00 30.00 33,600.00
0016 704-03-00100 Blocked Out Guard Rail 700      LNFT 22.00 15,400.00 21.00 14,700.00 21.00 14,700.00 19.00 13,300.00
0017 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 400      LNFT 71.00 28,400.00 70.00 28,000.00 65.00 26,000.00 60.00 24,000.00
0018 704-11-00100 Guard Rail End Treatment (Flared) 16      EACH 2,100.00 33,600.00 2,150.00 34,400.00 2,000.00 32,000.00 2,300.00 36,800.00
0019 711-01-03000 Riprap (30 lb, 14" Thick) 5      SQYD 350.00 1,750.00 200.00 1,000.00 210.00 1,050.00 250.00 1,250.00
0020 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00 80,000.00 80,000.00 25,000.00 25,000.00 25,000.00 25,000.00
0021 713-02-00500 Temporary Pavement Markings (24" Width) 48      LNFT 0.65 31.20 1.00 48.00 0.30 14.40 0.10 4.80
0022 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 19.503  MILE 150.00 2,925.45 1.00 19.50 50.00 975.15 10.00 195.03
0023 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 7.532  MILE 380.00 2,862.16 1.00 7.53 100.00 753.20 15.00 112.98
0024 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 31.586  MILE 650.00 20,530.90 1.00 31.59 200.00 6,317.20 20.00 631.72
0025 713-05-00400 Temporary Pavement Legends & Symbols (RR Crossing) 4      EACH 210.00 840.00 1.00 4.00 50.00 200.00 10.00 40.00
0026 717-01-00100 Seeding 217      LB 8.50 1,844.50 8.00 1,736.00 8.00 1,736.00 8.00 1,736.00
0027 718-01-00100 Fertilizer 7,220      LB 0.50 3,610.00 0.45 3,249.00 0.45 3,249.00 0.45 3,249.00
0028 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,350      SQYD 1.25 2,937.50 1.30 3,055.00 1.20 2,820.00 1.20 2,820.00
0029 727-01-00100 Mobilization 1      LUMP 73,500.00 73,500.00 115,000.00 115,000.00 220,000.00 220,000.00 250,000.00 250,000.00
0030 729-01-00100 Sign (Type A) (W11-1 "Bicycle Traffic" & W16-1P "Share The Road") 74      SQFT 22.00 1,628.00 20.00 1,480.00 20.00 1,480.00 17.00 1,258.00
0031 729-16-00300 Object Marker Assembly (Type 3) 16      EACH 71.00 1,136.00 70.00 1,120.00 70.00 1,120.00 85.00 1,360.00
0032 731-02-00100 Reflectorized Raised Pavement Markers 1,772      EACH 4.75 8,417.00 5.50 9,746.00 5.00 8,860.00 5.50 9,746.00
0033 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 24      LNFT 3.25 78.00 5.00 120.00 3.00 72.00 4.50 108.00
0034 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 15.793  MILE 1,100.00 17,372.30 2,000.00 31,586.00 1,000.00 15,793.00 1,950.00 30,796.35
0035 732-03-01000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) 3.766  MILE 525.00 1,977.15 700.00 2,636.20 500.00 1,883.00 650.00 2,447.90
0036 732-03-04000 Plastic Pavement Striping (Broken Line) (7" Width) (Preformed Tape) (Retroreflectivity Level I) Contrast 0.86   MILE 4,100.00 3,526.00 6,400.00 5,504.00 4,000.00 3,440.00 6,000.00 5,160.00
0037 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 2      EACH 400.00 800.00 400.00 800.00 400.00 800.00 400.00 800.00
0038 732-05-00100 Removal of Existing Markings 0.535  MILE 5,200.00 2,782.00 5,300.00 2,835.50 5,000.00 2,675.00 5,000.00 2,675.00
0039 735-01-00100 Mailboxes 48      EACH 1.00 48.00 1.00 48.00 1.00 48.00 6.00 288.00
0040 735-02-00100 Mailbox Supports (Single) 42      EACH 120.00 5,040.00 125.00 5,250.00 120.00 5,040.00 120.00 5,040.00
0041 735-03-00100 Mailbox Supports (Double) 2      EACH 200.00 400.00 200.00 400.00 200.00 400.00 180.00 360.00
0042 740-01-00100 Construction Layout 1      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 6,000.00 6,000.00 2,000.00 2,000.00
                         
    CONTRACTOR TOTAL       2,754,964.81   2,852,182.12   3,170,779.95   3,643,582.78