Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 026-06-0066 | |
| Parish: Franklin | |
| Routes: US 425 | |
| Description: RADIUS IMPROVEMENT & TURN LANE AT LA 128 EAST (TSM) | |
| Type Const: EARTHWORK, DRAINAGE STRUCTURES, CLASS II BASE COURSE, PCC PAVEMENT AND RELATED WORK | |
| Estimated Construction Cost: $130,929.08 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 15099 | Amethyst Construction, Inc. | $132,369.15 |
| 2 | 32563 | The Mabry Company Llc | $135,648.50 |
| 3 | 21982 | Forby Contracting, Inc. | $144,759.60 |
| 4 | 39104 | Rmk Construction Co. LLC | $146,364.48 |
| 5 | 38936 | Southern Industrial Contractors Llc | $218,018.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Amethyst Construction, Inc. |
- 2 - The Mabry Company Llc |
- 3 - Forby Contracting, Inc. |
- 4 - Rmk Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 460.8 | LNFT | 6.50 | 2,995.20 | 10.00 | 4,608.00 | 10.00 | 4,608.00 | 3.00 | 1,382.40 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 79.7 | SQYD | 6.50 | 518.05 | 15.00 | 1,195.50 | 15.00 | 1,195.50 | 5.75 | 458.28 |
| 0003 | 203-01-00100 | General Excavation | 290 | CUYD | 10.00 | 2,900.00 | 8.00 | 2,320.00 | 20.00 | 5,800.00 | 4.00 | 1,160.00 |
| 0004 | 203-03-00100 | Embankment | 183 | CUYD | 12.00 | 2,196.00 | 15.00 | 2,745.00 | 20.00 | 3,660.00 | 4.50 | 823.50 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 59.8 | CUYD | 16.00 | 956.80 | 18.00 | 1,076.40 | 45.00 | 2,691.00 | 13.50 | 807.30 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 15.00 | 300.00 | 20.00 | 400.00 | 30.00 | 600.00 | 2.50 | 50.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 120.00 | 360.00 | 250.00 | 750.00 | 200.00 | 600.00 | 50.00 | 150.00 |
| 0008 | 302-02-06000 | Class II Base Course (12" Thick) | 443.5 | SQYD | 38.00 | 16,853.00 | 35.00 | 15,522.50 | 60.00 | 26,610.00 | 61.00 | 27,053.50 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 20 | CUYD | 60.00 | 1,200.00 | 60.00 | 1,200.00 | 60.00 | 1,200.00 | 40.00 | 800.00 |
| 0010 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 423.9 | SQYD | 79.00 | 33,488.10 | 90.00 | 38,151.00 | 105.00 | 44,509.50 | 95.00 | 40,270.50 |
| 0011 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 153 | LNFT | 35.00 | 5,355.00 | 55.00 | 8,415.00 | 35.00 | 5,355.00 | 56.00 | 8,568.00 |
| 0012 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 5,400.00 | 5,400.00 | 4,000.00 | 4,000.00 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 |
| 0013 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 5,500.00 | 5,500.00 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 59.9 | SQYD | 78.00 | 4,672.20 | 65.00 | 3,893.50 | 95.00 | 5,690.50 | 62.00 | 3,713.80 |
| 0015 | 707-01-00200 | Concrete Curb (Barrier) | 107.3 | LNFT | 12.00 | 1,287.60 | 12.00 | 1,287.60 | 15.00 | 1,609.50 | 12.00 | 1,287.60 |
| 0016 | 707-01-00300 | Concrete Curb (Mountable) | 267.4 | LNFT | 12.00 | 3,208.80 | 10.00 | 2,674.00 | 10.00 | 2,674.00 | 11.00 | 2,941.40 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 11,500.00 | 11,500.00 |
| 0018 | 726-01-00100 | Bedding Material | 27 | CUYD | 65.00 | 1,755.00 | 110.00 | 2,970.00 | 60.00 | 1,620.00 | 85.00 | 2,295.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 18,500.00 | 18,500.00 | 15,000.00 | 15,000.00 | 13,500.00 | 13,500.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 9 | EACH | 25.00 | 225.00 | 125.00 | 1,125.00 | 37.00 | 333.00 | 15.00 | 135.00 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.072 | MILE | 8,000.00 | 576.00 | 50,000.00 | 3,600.00 | 9,800.00 | 705.60 | 25,000.00 | 1,800.00 |
| 0022 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.009 | MILE | 11,000.00 | 99.00 | 50,000.00 | 450.00 | 60,000.00 | 540.00 | 95,000.00 | 855.00 |
| 0023 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 200.00 | 200.00 | 750.00 | 750.00 | 400.00 | 400.00 | 500.00 | 500.00 |
| 0024 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 225.00 | 225.00 | 750.00 | 750.00 | 400.00 | 400.00 | 500.00 | 500.00 |
| 0025 | 732-05-00100 | Removal of Existing Markings | 0.06 | MILE | 25,000.00 | 1,500.00 | 12,000.00 | 720.00 | 8,700.00 | 522.00 | 25,000.00 | 1,500.00 |
| 0026 | 739-01-00100 | Hydro-Seeding | 0.15 | ACRE | 10,000.00 | 1,500.00 | 4,000.00 | 600.00 | 7,200.00 | 1,080.00 | 6,500.00 | 975.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 6,000.00 | 6,000.00 | 1,500.00 | 1,500.00 | 7,200.00 | 7,200.00 |
| 0028 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,356 | INLF | 1.40 | 6,098.40 | 1.25 | 5,445.00 | 1.00 | 4,356.00 | 0.95 | 4,138.20 |
| CONTRACTOR TOTAL | 132,369.15 | 135,648.50 | 144,759.60 | 146,364.48 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Southern Industrial Contractors Llc |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 460.8 | LNFT | 5.00 | 2,304.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 79.7 | SQYD | 10.00 | 797.00 |
| 0003 | 203-01-00100 | General Excavation | 290 | CUYD | 15.00 | 4,350.00 |
| 0004 | 203-03-00100 | Embankment | 183 | CUYD | 25.00 | 4,575.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 59.8 | CUYD | 50.00 | 2,990.00 |
| 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 25.00 | 500.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 650.00 | 1,950.00 |
| 0008 | 302-02-06000 | Class II Base Course (12" Thick) | 443.5 | SQYD | 30.00 | 13,305.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 20 | CUYD | 100.00 | 2,000.00 |
| 0010 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 423.9 | SQYD | 80.00 | 33,912.00 |
| 0011 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 153 | LNFT | 40.00 | 6,120.00 |
| 0012 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,500.00 | 3,500.00 |
| 0013 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 7,500.00 | 7,500.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 59.9 | SQYD | 60.00 | 3,594.00 |
| 0015 | 707-01-00200 | Concrete Curb (Barrier) | 107.3 | LNFT | 10.00 | 1,073.00 |
| 0016 | 707-01-00300 | Concrete Curb (Mountable) | 267.4 | LNFT | 8.00 | 2,139.20 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 |
| 0018 | 726-01-00100 | Bedding Material | 27 | CUYD | 75.00 | 2,025.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 9 | EACH | 120.00 | 1,080.00 |
| 0021 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.072 | MILE | 50,000.00 | 3,600.00 |
| 0022 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.009 | MILE | 50,000.00 | 450.00 |
| 0023 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 600.00 | 600.00 |
| 0024 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 600.00 | 600.00 |
| 0025 | 732-05-00100 | Removal of Existing Markings | 0.06 | MILE | 12,000.00 | 720.00 |
| 0026 | 739-01-00100 | Hydro-Seeding | 0.15 | ACRE | 12,000.00 | 1,800.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0028 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,356 | INLF | 1.50 | 6,534.00 |
| CONTRACTOR TOTAL | 218,018.20 | |||||