LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 023-06-0065
Parish: Jackson
Routes:
Description: EDGE OF CROSSOVER TO JACKSON P/L and WINN P/L TO JONESBORO
Type Const: CLEARING AND GRUBBING, GRADING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost: $3,411,889.01


RankLicenseBidderConstruction Bid
1 05789 D & J Construction Co., Inc. $2,793,149.91
2 12487 Diamond B Construction Co., L.L.C. $2,793,331.17
3 12312 Gilchrist Construction Co. LLC $3,292,134.35


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
D & J Construction Co., Inc.
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00200 Clearing and Grubbing (Selective) (Tree Trimming) 1      LUMP 8,000.00 8,000.00 8,050.00 8,050.00 8,000.00 8,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 100.00 100.00 1.00 1.00 3,000.00 3,000.00
0003 202-02-14500 Removal of Guard Rail 2,874      LNFT 7.00 20,118.00 5.00 14,370.00 5.00 14,370.00
0004 203-01-00100 General Excavation 97      CUYD 38.00 3,686.00 32.00 3,104.00 18.00 1,746.00
0005 203-04-00300 Nonplastic Embankment (Stone) 97      CUYD 115.00 11,155.00 100.00 9,700.00 100.00 9,700.00
0006 203-07-00100 Borrow (Vehicular Measurement) 2,262      CUYD 14.00 31,668.00 17.00 38,454.00 15.00 33,930.00
0007 203-08-00100 Geotextile Fabric 100      SQYD 1.50 150.00 5.00 500.00 5.00 500.00
0008 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 20      CUYD 20.00 400.00 100.00 2,000.00 100.00 2,000.00
0009 502-01-00100 Superpave Asphaltic Concrete 19,344.8    TON 75.00 1,450,860.00 67.00 1,296,101.60 80.00 1,547,584.00
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,413.3    TON 75.00 105,997.50 109.00 154,049.70 140.00 197,862.00
0011 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 47,998      GAL 2.90 139,194.20 3.00 143,994.00 3.00 143,994.00
0012 507-02-00200 Aggregate (S2) 70,583      SQYD 1.09 76,935.47 1.05 74,112.15 1.15 81,170.45
0013 507-02-00300 Aggregate (S3) 70,583      SQYD 0.90 63,524.70 0.80 56,466.40 0.95 67,053.85
0014 509-01-00100 Cold Planing Asphaltic Pavement 72,821      SQYD 1.00 72,821.00 1.70 123,795.70 0.80 58,256.80
0015 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,035      CUYD 0.10 -303.50 0.10 -303.50 1.00 -3,035.00
0016 510-01-00300 Pavement Patching (18" Minimum Thickness) 3,114      SQYD 80.00 249,120.00 80.00 249,120.00 110.00 342,540.00
0017 510-01-00400 Pavement Patching (24" Minimum Thickness) 876      SQYD 120.00 105,120.00 122.00 106,872.00 135.00 118,260.00
0018 510-03-00100 Pavement Joint Repair 503.4    TON 180.00 90,612.00 140.00 70,476.00 190.00 95,646.00
0019 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 612.5    LNFT 58.00 35,525.00 60.00 36,750.00 60.00 36,750.00
0020 704-03-00100 Blocked Out Guard Rail 3,093.8    LNFT 20.00 61,876.00 21.00 64,969.80 20.00 61,876.00
0021 704-06-00200 Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) 68.8    LNFT 70.00 4,816.00 70.00 4,816.00 70.00 4,816.00
0022 704-11-00100 Guard Rail End Treatment (Flared) 11      EACH 2,100.00 23,100.00 2,200.00 24,200.00 2,300.00 25,300.00
0023 713-01-00100 Temporary Signs and Barricades 1      LUMP 43,000.00 43,000.00 55,000.00 55,000.00 25,000.00 25,000.00
0024 713-02-00300 Temporary Pavement Markings (8" Width) 493      LNFT 0.75 369.75 0.30 147.90 0.25 123.25
0025 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 14.361  MILE 225.00 3,231.23 150.00 2,154.15 300.00 4,308.30
0026 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 19.148  MILE 1.00 19.15 320.00 6,127.36 100.00 1,914.80
0027 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 38.296  MILE 1.00 38.30 425.00 16,275.80 100.00 3,829.60
0028 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 4      EACH 75.00 300.00 52.00 208.00 55.00 220.00
0029 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 4      EACH 75.00 300.00 52.00 208.00 55.00 220.00
0030 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,350      EACH 2.25 3,037.50 1.90 2,565.00 2.00 2,700.00
0031 716-01-00100 Mulch (Vegetative) 18.5    TON 500.00 9,250.00 250.00 4,625.00 250.00 4,625.00
0032 717-01-00100 Seeding 554      LB 6.00 3,324.00 9.50 5,263.00 9.00 4,986.00
0033 718-01-00100 Fertilizer 9,230      LB 0.40 3,692.00 0.35 3,230.50 0.35 3,230.50
0034 727-01-00100 Mobilization 1      LUMP 62,000.00 62,000.00 101,000.00 101,000.00 210,000.00 210,000.00
0035 729-16-00300 Object Marker Assembly (Type 3) 22      EACH 65.00 1,430.00 70.00 1,540.00 75.00 1,650.00
0036 731-02-00100 Reflectorized Raised Pavement Markers 721      EACH 5.00 3,605.00 4.75 3,424.75 5.90 4,253.90
0037 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 493      LNFT 3.75 1,848.75 1.00 493.00 1.50 739.50
0038 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 670      LNFT 4.75 3,182.50 3.20 2,144.00 5.00 3,350.00
0039 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 9.574  MILE 2,400.00 22,977.60 2,250.00 21,541.50 2,800.00 26,807.20
0040 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.787  MILE 1,050.00 5,026.35 850.00 4,068.95 950.00 4,547.65
0041 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4      EACH 275.00 1,100.00 250.00 1,000.00 240.00 960.00
0042 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 4      EACH 375.00 1,500.00 250.00 1,000.00 250.00 1,000.00
0043 735-01-00100 Mailboxes 1      EACH 5.00 5.00 5.00 5.00 1.00 1.00
0044 735-02-00100 Mailbox Supports (Single) 1      EACH 200.00 200.00 300.00 300.00 165.00 165.00
0045 740-01-00100 Construction Layout 1      LUMP 2,500.00 2,500.00 6,000.00 6,000.00 10,000.00 10,000.00
0046 NS-500-00220 Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay 9,109      LNFT 1.50 13,663.50 1.35 12,297.15 1.15 10,475.35
0047 NS-500-00240 Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay 5,160      LNFT 1.70 8,772.00 1.35 6,966.00 1.15 5,934.00
0048 NS-500-00260 Sawcuts in Asphaltic Concrete Lifts 14,269      LNFT 0.90 12,842.10 0.92 13,127.48 1.00 14,269.00
0049 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 116,514      INLF 0.09 10,486.26 0.10 11,651.40 0.40 46,605.60
0050 NS-500-00360 Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement 39,552      INLF 0.11 4,350.72 0.16 6,328.32 0.40 15,820.80
0051 NS-602-00001 Milling Concrete Pavement 1,882.7    SQYD 4.75 8,942.83 9.83 18,506.94 14.00 26,357.80
0052 NS-724-00002 Rumble Strips (Shoulder Ground-In) 9.6    MILE 800.00 7,680.00 472.20 4,533.12 700.00 6,720.00
                     
    CONTRACTOR TOTAL       2,793,149.91   2,793,331.17   3,292,134.35