Bid Tabulations
Letting of
08/31/2011
LA DOTD Headquarters
| Lead Project: 022-05-0054 | |
| Parish: LaSalle | |
| Routes: US 84 | |
| Description: TROUT - LA 459 | |
| Type Const: PAVEMENT PATCHING, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AST INTERLAYER, AND RELATED WORK | |
| Estimated Construction Cost: $2,079,780.65 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $1,851,525.82 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,089,259.50 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $2,206,442.98 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,000.00 | 1,000.00 | 1,100.00 | 1,100.00 | 600.00 | 600.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 35.5 | SQYD | 10.00 | 355.00 | 11.00 | 390.50 | 25.00 | 887.50 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 5 | CUYD | 30.00 | 150.00 | 11.00 | 55.00 | 200.00 | 1,000.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 390 | CUYD | 25.00 | 9,750.00 | 47.00 | 18,330.00 | 30.00 | 11,700.00 |
| 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 1.00 | 500.00 | 12.00 | 6,000.00 | 25.00 | 12,500.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 12,481.6 | TON | 88.00 | 1,098,380.80 | 89.00 | 1,110,862.40 | 91.00 | 1,135,825.60 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,033.8 | TON | 88.00 | 178,974.40 | 1.00 | 2,033.80 | 120.00 | 244,056.00 |
| 0008 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 34,551 | GAL | 3.05 | 105,380.55 | 4.00 | 138,204.00 | 3.50 | 120,928.50 |
| 0009 | 507-02-00200 | Aggregate (S2) | 50,809 | SQYD | 0.98 | 49,792.82 | 0.90 | 45,728.10 | 1.00 | 50,809.00 |
| 0010 | 507-02-00300 | Aggregate (S3) | 50,809 | SQYD | 0.77 | 39,122.93 | 0.70 | 35,566.30 | 0.85 | 43,187.65 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 79,438 | SQYD | 1.60 | 127,100.80 | 3.25 | 258,173.50 | 1.15 | 91,353.70 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,083 | CUYD | 0.01 | -30.83 | 0.10 | -308.30 | 0.50 | -1,541.50 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 600 | SQYD | 125.00 | 75,000.00 | 110.00 | 66,000.00 | 110.00 | 66,000.00 |
| 0014 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 8 | LNFT | 140.00 | 1,120.00 | 150.00 | 1,200.00 | 145.00 | 1,160.00 |
| 0015 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 8 | LNFT | 155.00 | 1,240.00 | 165.00 | 1,320.00 | 165.00 | 1,320.00 |
| 0016 | 701-15-00100 | Concrete Collar | 2 | EACH | 800.00 | 1,600.00 | 800.00 | 1,600.00 | 850.00 | 1,700.00 |
| 0017 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,000.00 | 3,000.00 | 3,300.00 | 3,300.00 | 6,600.00 | 6,600.00 |
| 0018 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,500.00 | 7,000.00 | 3,700.00 | 7,400.00 | 3,700.00 | 7,400.00 |
| 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 12 | EACH | 1,000.00 | 12,000.00 | 1,100.00 | 13,200.00 | 735.00 | 8,820.00 |
| 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 35.5 | SQYD | 65.00 | 2,307.50 | 65.00 | 2,307.50 | 80.00 | 2,840.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,000.00 | 9,000.00 | 72,000.00 | 72,000.00 | 35,000.00 | 35,000.00 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.629 | MILE | 150.00 | 1,594.35 | 300.00 | 3,188.70 | 525.00 | 5,580.23 |
| 0023 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 936 | EACH | 2.50 | 2,340.00 | 0.40 | 374.40 | 2.00 | 1,872.00 |
| 0024 | 717-01-00100 | Seeding | 3 | LB | 55.00 | 165.00 | 350.00 | 1,050.00 | 115.00 | 345.00 |
| 0025 | 718-01-00100 | Fertilizer | 50 | LB | 6.00 | 300.00 | 7.00 | 350.00 | 3.00 | 150.00 |
| 0026 | 726-01-00100 | Bedding Material | 13.9 | CUYD | 100.00 | 1,390.00 | 110.00 | 1,529.00 | 90.00 | 1,251.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 200,000.00 | 200,000.00 | 275,000.00 | 275,000.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 469 | EACH | 4.50 | 2,110.50 | 5.00 | 2,345.00 | 5.80 | 2,720.20 |
| 0029 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 550 | LNFT | 4.00 | 2,200.00 | 2.00 | 1,100.00 | 1.65 | 907.50 |
| 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 130 | LNFT | 5.00 | 650.00 | 6.50 | 845.00 | 5.50 | 715.00 |
| 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.172 | MILE | 2,600.00 | 36,847.20 | 2,900.00 | 41,098.80 | 3,100.00 | 43,933.20 |
| 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 250.00 | 1,000.00 | 280.00 | 1,120.00 | 235.00 | 940.00 |
| 0033 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 250.00 | 500.00 | 280.00 | 560.00 | 235.00 | 470.00 |
| 0034 | 735-01-00100 | Mailboxes | 11 | EACH | 5.00 | 55.00 | 1.00 | 11.00 | 11.00 | 121.00 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 175.00 | 1,575.00 | 190.00 | 1,710.00 | 100.00 | 900.00 |
| 0036 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 210.00 | 210.00 | 135.00 | 135.00 |
| 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 7,000.00 | 7,000.00 | 7,000.00 | 7,000.00 |
| 0038 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 700.00 | 700.00 | 700.00 | 700.00 | 1,000.00 | 1,000.00 |
| 0039 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 17,016 | INLF | 0.30 | 5,104.80 | 0.30 | 5,104.80 | 0.40 | 6,806.40 |
| 0040 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 9,000 | INLF | 0.70 | 6,300.00 | 1.60 | 14,400.00 | 0.85 | 7,650.00 |
| 0041 | NS-706-00100 | Truncated Dome System (Asphaltic Concrete Pavement) | 17 | EACH | 1,250.00 | 21,250.00 | 1,300.00 | 22,100.00 | 400.00 | 6,800.00 |
| CONTRACTOR TOTAL | 1,851,525.82 | 2,089,259.50 | 2,206,442.98 | |||||||