Bid Tabulations
Letting of
05/19/2010
LA DOTD Headquarters
| Lead Project: 022-02-0037 | |
| Parish: Winn | |
| Routes: US84 | |
| Description: WOLF CREEK - JCT. US 167 | |
| Type Const: PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK | |
| Estimated Construction Cost: $1,107,652.57 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $977,656.66 |
| 2 | 08584 | Madden Contracting Co., Inc. | $1,060,792.54 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,283,605.96 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Madden Contracting Co., Inc. |
- 3 - Diamond B Construction Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 487 | LNFT | 10.00 | 4,870.00 | 6.15 | 2,995.05 | 2.95 | 1,436.65 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 50.00 | 1,000.00 | 50.00 | 1,000.00 | 41.00 | 820.00 |
| 0003 | 502-01-00100 | Superpave Asphaltic Concrete | 8,082 | TON | 70.00 | 565,740.00 | 75.00 | 606,150.00 | 88.50 | 715,257.00 |
| 0004 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 200 | TON | 125.00 | 25,000.00 | 65.00 | 13,000.00 | 202.00 | 40,400.00 |
| 0005 | 509-01-00100 | Cold Planing Asphaltic Pavement | 73,490 | SQYD | 1.20 | 88,188.00 | 1.50 | 110,235.00 | 2.30 | 169,027.00 |
| 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,041 | CUYD | 1.00 | -2,041.00 | 0.01 | -20.41 | 0.10 | -204.10 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 300 | SQYD | 88.00 | 26,400.00 | 44.00 | 13,200.00 | 113.00 | 33,900.00 |
| 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 600 | SQYD | 102.00 | 61,200.00 | 66.00 | 39,600.00 | 124.00 | 74,400.00 |
| 0009 | 704-11-00100 | Guard Rail End Treatment (Flared) | 6 | EACH | 2,100.00 | 12,600.00 | 2,000.00 | 12,000.00 | 2,240.00 | 13,440.00 |
| 0010 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 7 | EACH | 2,200.00 | 15,400.00 | 2,290.00 | 16,030.00 | 2,350.00 | 16,450.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 64,000.00 | 64,000.00 | 10,000.00 | 10,000.00 |
| 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.627 | MILE | 240.00 | 2,310.48 | 400.00 | 3,850.80 | 160.00 | 1,540.32 |
| 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.96 | MILE | 1.00 | 5.96 | 300.00 | 1,788.00 | 353.00 | 2,103.88 |
| 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 32.516 | MILE | 1.00 | 32.52 | 600.00 | 19,509.60 | 707.00 | 22,988.81 |
| 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 64,000.00 | 64,000.00 | 39,500.00 | 39,500.00 |
| 0016 | 731-02-00100 | Reflectorized Raised Pavement Markers | 675 | EACH | 5.50 | 3,712.50 | 4.50 | 3,037.50 | 5.30 | 3,577.50 |
| 0017 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 150 | LNFT | 4.40 | 660.00 | 1.00 | 150.00 | 1.00 | 150.00 |
| 0018 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 20 | LNFT | 22.00 | 440.00 | 1.50 | 30.00 | 1.75 | 35.00 |
| 0019 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.258 | MILE | 2,400.00 | 39,019.20 | 2,400.00 | 39,019.20 | 2,800.00 | 45,522.40 |
| 0020 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.98 | MILE | 1,100.00 | 3,278.00 | 600.00 | 1,788.00 | 700.00 | 2,086.00 |
| 0021 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 330.00 | 660.00 | 200.00 | 400.00 | 235.00 | 470.00 |
| 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 330.00 | 660.00 | 200.00 | 400.00 | 235.00 | 470.00 |
| 0023 | 735-01-00100 | Mailboxes | 33 | EACH | 5.00 | 165.00 | 1.00 | 33.00 | 1.00 | 33.00 |
| 0024 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 125.00 | 2,375.00 | 112.00 | 2,128.00 | 130.00 | 2,470.00 |
| 0025 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 185.00 | 1,480.00 | 170.00 | 1,360.00 | 200.00 | 1,600.00 |
| 0026 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 350.00 | 700.00 | 315.00 | 630.00 | 370.00 | 740.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 3,500.00 | 3,500.00 |
| 0028 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 15,250 | LNFT | 1.50 | 22,875.00 | 1.15 | 17,537.50 | 1.30 | 19,825.00 |
| 0029 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 15,350 | LNFT | 1.00 | 15,350.00 | 0.75 | 11,512.50 | 1.25 | 19,187.50 |
| 0032 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 42,880 | INLF | 0.20 | 8,576.00 | 0.01 | 428.80 | 1.00 | 42,880.00 |
| CONTRACTOR TOTAL | 977,656.66 | 1,060,792.54 | 1,283,605.96 | |||||||