Bid Tabulations
Letting of
06/30/2010
LA DOTD Headquarters
| Lead Project: 022-02-0035 | |
| Parish: Winn | |
| Routes: US 84 | |
| Description: US 84 SLIDE REPAIR | |
| Type Const: GRADING, CLASS II BASE COURSE, UNDERDRAINS, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK | |
| Estimated Construction Cost: $747,901.02 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08815 | W. E. Mcdonald & Son, LLC. | $578,939.68 |
| 2 | 49239 | W L Bass Construction Inc. | $694,708.30 |
| 3 | 33685 | Specialty Contractors | $697,113.90 |
| 4 | 43371 | RMD Holdings Ltd | $774,679.17 |
| 5 | 28218 | F. J. Burnell, Inc. | $909,263.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - W. E. Mcdonald & Son, LLC. |
- 2 - W L Bass Construction Inc. |
- 3 - Specialty Contractors |
- 4 - RMD Holdings Ltd |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 26,000.00 | 26,000.00 | 2,300.00 | 2,300.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 250.00 | 250.00 | 1,000.00 | 1,000.00 | 2,300.00 | 2,300.00 |
| 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,333 | SQYD | 8.00 | 10,664.00 | 2.00 | 2,666.00 | 5.00 | 6,665.00 | 5.50 | 7,331.50 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 888.9 | SQYD | 6.00 | 5,333.40 | 2.00 | 1,777.80 | 3.00 | 2,666.70 | 5.31 | 4,720.06 |
| 0005 | 203-01-00100 | General Excavation | 7,286 | CUYD | 5.00 | 36,430.00 | 3.00 | 21,858.00 | 5.00 | 36,430.00 | 8.60 | 62,659.60 |
| 0006 | 203-03-00100 | Embankment | 4,902 | CUYD | 12.00 | 58,824.00 | 7.25 | 35,539.50 | 9.00 | 44,118.00 | 5.87 | 28,774.74 |
| 0008 | 203-04-00300 | Nonplastic Embankment (Stone) | 1,300 | CUYD | 86.00 | 111,800.00 | 90.00 | 117,000.00 | 100.00 | 130,000.00 | 87.33 | 113,529.00 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 15 | EACH | 200.00 | 3,000.00 | 1.00 | 15.00 | 75.00 | 1,125.00 | 161.00 | 2,415.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 3.00 | 1,800.00 | 0.50 | 300.00 | 3.50 | 2,100.00 | 2.24 | 1,344.00 |
| 0011 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 2,250 | SQYD | 25.00 | 56,250.00 | 37.00 | 83,250.00 | 30.72 | 69,120.00 | 24.97 | 56,182.50 |
| 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 1.00 | 50.00 | 15.00 | 750.00 | 60.00 | 3,000.00 | 81.68 | 4,084.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 733.5 | TON | 112.08 | 82,210.68 | 146.00 | 107,091.00 | 150.00 | 110,025.00 | 161.00 | 118,093.50 |
| 0014 | 703-03-00100 | Perforated Pipe Underdrains | 500 | LNFT | 15.00 | 7,500.00 | 8.00 | 4,000.00 | 30.00 | 15,000.00 | 18.40 | 9,200.00 |
| 0015 | 703-04-00100 | Nonperforated Pipe Underdrains | 205 | LNFT | 15.00 | 3,075.00 | 14.00 | 2,870.00 | 30.00 | 6,150.00 | 18.40 | 3,772.00 |
| 0016 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 200.00 | 2,000.00 | 150.00 | 1,500.00 | 250.00 | 2,500.00 | 17.25 | 172.50 |
| 0017 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 200.00 | 2,000.00 | 125.00 | 1,250.00 | 250.00 | 2,500.00 | 17.25 | 172.50 |
| 0018 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 8 | SQYD | 200.00 | 1,600.00 | 140.00 | 1,120.00 | 200.00 | 1,600.00 | 153.53 | 1,228.24 |
| 0019 | 711-04-00100 | Geotextile Fabric "CLASS D" | 8 | SQYD | 50.00 | 400.00 | 5.00 | 40.00 | 44.00 | 352.00 | 52.90 | 423.20 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.188 | MILE | 400.00 | 75.20 | 1,000.00 | 188.00 | 500.00 | 94.00 | 322.00 | 60.54 |
| 0021 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.41 | MILE | 1,000.00 | 410.00 | 1,000.00 | 410.00 | 1,800.00 | 738.00 | 1,840.00 | 754.40 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.188 | MILE | 1,000.00 | 188.00 | 1,000.00 | 188.00 | 800.00 | 150.40 | 805.00 | 151.34 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.376 | MILE | 1,500.00 | 564.00 | 1,500.00 | 564.00 | 1,000.00 | 376.00 | 1,035.00 | 389.16 |
| 0024 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) (4" W)(Type 1R) | 0.82 | MILE | 2,000.00 | 1,640.00 | 2,000.00 | 1,640.00 | 7,200.00 | 5,904.00 | 7,820.00 | 6,412.40 |
| 0025 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 28 | EACH | 2.00 | 56.00 | 0.35 | 9.80 | 11.00 | 308.00 | 11.50 | 322.00 |
| 0026 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 400.00 | 3,200.00 | 500.00 | 4,000.00 | 1,000.00 | 8,000.00 | 690.00 | 5,520.00 |
| 0027 | 717-01-00100 | Seeding | 360 | LB | 7.00 | 2,520.00 | 4.00 | 1,440.00 | 10.00 | 3,600.00 | 12.08 | 4,348.80 |
| 0028 | 718-01-00100 | Fertilizer | 4,000 | LB | 0.35 | 1,400.00 | 1.00 | 4,000.00 | 1.00 | 4,000.00 | 0.69 | 2,760.00 |
| 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,600 | SQYD | 1.00 | 2,600.00 | 1.00 | 2,600.00 | 3.00 | 7,800.00 | 1.27 | 3,302.00 |
| 0030 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 400 | SQYD | 1.50 | 600.00 | 5.00 | 2,000.00 | 4.00 | 1,600.00 | 2.88 | 1,152.00 |
| 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 1.00 | 1.00 | 17,250.00 | 17,250.00 |
| 0032 | 725-01-00100 | Temporary Detour Roads | 2,899.2 | SQYD | 42.00 | 121,766.40 | 65.00 | 188,448.00 | 63.00 | 182,649.60 | 67.01 | 194,275.39 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 12,000.00 | 12,000.00 | 75,000.00 | 75,000.00 | 6,000.00 | 6,000.00 | 82,974.00 | 82,974.00 |
| 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 250.00 | 1,000.00 | 75.00 | 300.00 | 100.00 | 400.00 | 113.68 | 454.72 |
| 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 50.00 | 650.00 | 100.00 | 1,300.00 | 10.00 | 130.00 | 11.50 | 149.50 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.008 | MILE | 8,500.00 | 8,568.00 | 5,000.00 | 5,040.00 | 3,800.00 | 3,830.40 | 4,025.00 | 4,057.20 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.094 | MILE | 7,500.00 | 705.00 | 800.00 | 75.20 | 1,200.00 | 112.80 | 1,150.00 | 108.10 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,500.00 | 5,500.00 | 17,250.00 | 17,250.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 336 | INLF | 5.00 | 1,680.00 | 0.25 | 84.00 | 2.50 | 840.00 | 1.44 | 483.84 |
| 0041 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 576 | INLF | 5.00 | 2,880.00 | 0.25 | 144.00 | 3.00 | 1,728.00 | 1.44 | 829.44 |
| 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,500.00 | 9,500.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | 12,972.00 | 12,972.00 |
| CONTRACTOR TOTAL | 578,939.68 | 694,708.30 | 697,113.90 | 774,679.17 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - F. J. Burnell, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 36,000.00 | 36,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,333 | SQYD | 10.00 | 13,330.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 888.9 | SQYD | 10.00 | 8,889.00 |
| 0005 | 203-01-00100 | General Excavation | 7,286 | CUYD | 10.00 | 72,860.00 |
| 0006 | 203-03-00100 | Embankment | 4,902 | CUYD | 20.00 | 98,040.00 |
| 0008 | 203-04-00300 | Nonplastic Embankment (Stone) | 1,300 | CUYD | 85.00 | 110,500.00 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 15 | EACH | 100.00 | 1,500.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 5.00 | 3,000.00 |
| 0011 | 302-02-05120 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete) | 2,250 | SQYD | 24.00 | 54,000.00 |
| 0012 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 733.5 | TON | 115.00 | 84,352.50 |
| 0014 | 703-03-00100 | Perforated Pipe Underdrains | 500 | LNFT | 20.00 | 10,000.00 |
| 0015 | 703-04-00100 | Nonperforated Pipe Underdrains | 205 | LNFT | 25.00 | 5,125.00 |
| 0016 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 300.00 | 3,000.00 |
| 0017 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 300.00 | 3,000.00 |
| 0018 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 8 | SQYD | 300.00 | 2,400.00 |
| 0019 | 711-04-00100 | Geotextile Fabric "CLASS D" | 8 | SQYD | 10.00 | 80.00 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.188 | MILE | 2,000.00 | 376.00 |
| 0021 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.41 | MILE | 1,500.00 | 615.00 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.188 | MILE | 1,500.00 | 282.00 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.376 | MILE | 2,000.00 | 752.00 |
| 0024 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) (4" W)(Type 1R) | 0.82 | MILE | 2,500.00 | 2,050.00 |
| 0025 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 28 | EACH | 20.00 | 560.00 |
| 0026 | 716-01-00100 | Mulch (Vegetative) | 8 | TON | 350.00 | 2,800.00 |
| 0027 | 717-01-00100 | Seeding | 360 | LB | 15.00 | 5,400.00 |
| 0028 | 718-01-00100 | Fertilizer | 4,000 | LB | 1.00 | 4,000.00 |
| 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,600 | SQYD | 3.00 | 7,800.00 |
| 0030 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 400 | SQYD | 5.00 | 2,000.00 |
| 0031 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 1,000.00 | 1,000.00 |
| 0032 | 725-01-00100 | Temporary Detour Roads | 2,899.2 | SQYD | 75.00 | 217,440.00 |
| 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 |
| 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 150.00 | 600.00 |
| 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 60.00 | 780.00 |
| 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.008 | MILE | 10,000.00 | 10,080.00 |
| 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.094 | MILE | 10,000.00 | 940.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 336 | INLF | 5.00 | 1,680.00 |
| 0041 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 576 | INLF | 7.00 | 4,032.00 |
| 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 |
| CONTRACTOR TOTAL | 909,263.50 | |||||