Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 020-06-0038 | |
| Parish: Madison | |
| Routes: US 65 | |
| Description: WALNUT BAYOU - JCT US 80 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $945,259.82 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,035,811.57 |
| 2 | 05789 | D & J Construction Co., Inc. | $1,119,703.67 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - D & J Construction Co., Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 10,000.00 | 10,000.00 | 8,500.00 | 8,500.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,700.00 | 1,700.00 | 500.00 | 500.00 |
| 0003 | 203-01-00100 | General Excavation | 461 | CUYD | 18.00 | 8,298.00 | 25.00 | 11,525.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 30 | CUYD | 100.00 | 3,000.00 | 40.00 | 1,200.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 3,840.6 | TON | 86.00 | 330,291.60 | 105.00 | 403,263.00 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 364.5 | TON | 138.00 | 50,301.00 | 105.00 | 38,272.50 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 33,029 | SQYD | 2.50 | 82,572.50 | 2.00 | 66,058.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,376 | CUYD | 0.10 | -137.60 | 0.10 | -137.60 |
| 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,778 | SQYD | 105.00 | 186,690.00 | 120.00 | 213,360.00 |
| 0010 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,528 | LNFT | 1.40 | 4,939.20 | 3.00 | 10,584.00 |
| 0011 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 2,040 | LNFT | 1.65 | 3,366.00 | 5.00 | 10,200.00 |
| 0012 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 13.3 | SQYD | 210.00 | 2,793.00 | 300.00 | 3,990.00 |
| 0013 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 182.3 | SQYD | 204.00 | 37,189.20 | 200.00 | 36,460.00 |
| 0014 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 112 | SQYD | 199.00 | 22,288.00 | 200.00 | 22,400.00 |
| 0015 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,200.00 | 2,200.00 | 2,500.00 | 2,500.00 |
| 0016 | 706-04-00100 | Handicapped Curb Ramps | 38 | EACH | 1,250.00 | 47,500.00 | 500.00 | 19,000.00 |
| 0017 | 710-01-00100 | Flowable Fill | 151 | CUYD | 150.00 | 22,650.00 | 130.00 | 19,630.00 |
| 0018 | 711-02-00400 | Riprap (55 lb) | 89 | CUYD | 113.00 | 10,057.00 | 125.00 | 11,125.00 |
| 0019 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 2.25 | 150.75 | 5.00 | 335.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 64,250.00 | 64,250.00 |
| 0021 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 996 | LNFT | 0.35 | 348.60 | 1.50 | 1,494.00 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 994 | LNFT | 1.00 | 994.00 | 2.00 | 1,988.00 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.008 | MILE | 158.00 | 791.26 | 250.00 | 1,252.00 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.124 | MILE | 400.00 | 1,649.60 | 250.00 | 1,031.00 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.244 | MILE | 740.00 | 6,100.56 | 1.00 | 8.24 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 56.00 | 112.00 | 100.00 | 200.00 |
| 0027 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 170.00 | 1,360.00 | 200.00 | 1,600.00 |
| 0028 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 910 | EACH | 0.39 | 354.90 | 2.00 | 1,820.00 |
| 0029 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 5,000.00 | 500.00 | 5,000.00 | 500.00 |
| 0030 | 717-01-00100 | Seeding | 6 | LB | 30.00 | 180.00 | 200.00 | 1,200.00 |
| 0031 | 718-01-00100 | Fertilizer | 100 | LB | 6.00 | 600.00 | 6.00 | 600.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 43,000.00 | 43,000.00 | 39,000.00 | 39,000.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,523 | EACH | 5.00 | 7,615.00 | 5.00 | 7,615.00 |
| 0034 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 498 | LNFT | 1.60 | 796.80 | 6.00 | 2,988.00 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 497 | LNFT | 3.25 | 1,615.25 | 7.00 | 3,479.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.122 | MILE | 2,600.00 | 10,717.20 | 2,800.00 | 11,541.60 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.062 | MILE | 725.00 | 1,494.95 | 1,600.00 | 3,299.20 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 265.00 | 265.00 | 400.00 | 400.00 |
| 0039 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 400.00 | 1,600.00 | 600.00 | 2,400.00 |
| 0040 | 732-05-00100 | Removal of Existing Markings | 0.668 | MILE | 5,600.00 | 3,740.80 | 4,000.00 | 2,672.00 |
| 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,100.00 | 7,100.00 | 8,500.00 | 8,500.00 |
| 0042 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 850.00 | 1,700.00 | 350.00 | 700.00 |
| 0043 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 18,591 | LNFT | 1.20 | 22,309.20 | 1.30 | 24,168.30 |
| 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 13,397 | LNFT | 1.40 | 18,755.80 | 1.55 | 20,765.35 |
| 0045 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 31,988 | LNFT | 1.00 | 31,988.00 | 0.85 | 27,189.80 |
| 0046 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 57,096 | INLF | 0.25 | 14,274.00 | 0.18 | 10,277.28 |
| CONTRACTOR TOTAL | 1,035,811.57 | 1,119,703.67 | ||||||