Bid Tabulations
Letting of
01/26/2011
LA DOTD Headquarters
| Lead Project: 015-01-0056 | |
| Parish: Rapides | |
| Routes: US 165-B | |
| Description: KCS BRIDGE / US HIGHWAY 165-B LANDSCAPE ENHANCEMENT | |
| Type Const: LANDSCAPING, IRRIGATION SYSTEM, LIGHTING, RETAINING WALL, AND RELATED WORK. | |
| Estimated Construction Cost: $304,684.02 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 30774 | Progressive Construction Co., LLC | $273,853.00 |
| 2 | 45004 | Bondco LLC | $279,853.45 |
| 3 | 35849 | T.L. Construction LLC | $297,863.00 |
| 4 | 54258 | Acacia Industries, LLC | $298,948.15 |
| 5 | 32044 | Quality Design & Construction, LLC | $299,057.20 |
| 6 | 29959 | Rotolo Consultants Inc. | $330,184.30 |
| 7 | 51292 | JJH Construction Co. LLC | $337,383.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Progressive Construction Co., LLC |
- 2 - Bondco LLC |
- 3 - T.L. Construction LLC |
- 4 - Acacia Industries, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-02-00100 | Temporary Hay or Straw Bales | 254 | EACH | 10.00 | 2,540.00 | 10.00 | 2,540.00 | 15.00 | 3,810.00 | 9.50 | 2,413.00 |
| 0002 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 3.00 | 300.00 | 3.00 | 300.00 | 9.00 | 900.00 | 9.50 | 950.00 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 6,400.00 | 6,400.00 | 5,000.00 | 5,000.00 | 11,250.00 | 11,250.00 |
| 0004 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 538 | SQYD | 6.00 | 3,228.00 | 5.00 | 2,690.00 | 9.00 | 4,842.00 | 5.25 | 2,824.50 |
| 0005 | 715-01-00100 | Topsoil | 487 | CUYD | 25.00 | 12,175.00 | 15.00 | 7,305.00 | 26.00 | 12,662.00 | 30.00 | 14,610.00 |
| 0006 | 719-01-02040 | Plants (Tree) (Container) (2" cal) (Lagerstroemia Indica 'Dynamite', 'Dynamite Red' Crape Myrtle, 10'-12' Min Ht, 5 Cane Min, Full Spread) | 20 | EACH | 320.00 | 6,400.00 | 160.00 | 3,200.00 | 200.00 | 4,000.00 | 330.00 | 6,600.00 |
| 0007 | 719-01-02040 | Plants (Tree) (Container) (2" cal) (Lagerstroemia Indica 'Muskogee', 'Muskogee' Crape Myrtle, 10'-12' Min Ht, 5 Cane Min, Full Spread) | 12 | EACH | 300.00 | 3,600.00 | 150.00 | 1,800.00 | 200.00 | 2,400.00 | 330.00 | 3,960.00 |
| 0008 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Quercus Shummardi, Shummard Oak, 12'14' Min Ht, Full Spread) | 9 | EACH | 315.00 | 2,835.00 | 170.00 | 1,530.00 | 200.00 | 1,800.00 | 330.00 | 2,970.00 |
| 0009 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Taxodium Distichum, Bald Cypress, 12'-14' Min Ht, Full Spread) | 20 | EACH | 300.00 | 6,000.00 | 165.00 | 3,300.00 | 200.00 | 4,000.00 | 330.00 | 6,600.00 |
| 0010 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Magnolia Grandiflora, Southern Magnolia, 12'-14' Min Ht, Full Spread) | 16 | EACH | 300.00 | 4,800.00 | 195.00 | 3,120.00 | 240.00 | 3,840.00 | 465.00 | 7,440.00 |
| 0011 | 719-01-06000 | Plants (Plant) (Container) (4") (Liriope Muscari 'Big Blue', Space 12" On Center) | 1,587 | EACH | 5.00 | 7,935.00 | 1.75 | 2,777.25 | 2.50 | 3,967.50 | 1.15 | 1,825.05 |
| 0012 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) (Dietes Vegeta, African Iris, Full Plant, Space 2' On Center) | 294 | EACH | 7.00 | 2,058.00 | 5.00 | 1,470.00 | 6.00 | 1,764.00 | 7.15 | 2,102.10 |
| 0013 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) ('Aztec Gold' and 'Rosie Meyer' Hemerocallis Fulva, Daylily, Full Plant, Space 18" On Center, (50%/50% Mix)) | 208 | EACH | 7.00 | 1,456.00 | 4.75 | 988.00 | 6.00 | 1,248.00 | 6.05 | 1,258.40 |
| 0014 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) (Miscanthus Sinensis 'Zebrinus', Zebra Grass, Full Plant, Space 3' On Center) | 313 | EACH | 7.00 | 2,191.00 | 4.55 | 1,424.15 | 6.00 | 1,878.00 | 13.20 | 4,131.60 |
| 0015 | 719-01-06100 | Plants (Plant) (Container) (7 gallon) (Jjasminum Mesnyi, Primrose Jasmine, Full Plant, Space 6' On Center) | 102 | EACH | 30.00 | 3,060.00 | 26.00 | 2,652.00 | 32.00 | 3,264.00 | 24.00 | 2,448.00 |
| 0016 | 719-01-06100 | Plants (Plant) (Container) (7 gallon) (Raphiolepis Indica 'Clara', 'Clara' Indian Hawthorn, Full Plant, Space 4' On Center) | 146 | EACH | 30.00 | 4,380.00 | 26.00 | 3,796.00 | 32.00 | 4,672.00 | 33.00 | 4,818.00 |
| 0017 | 719-02-00100 | Top Dressing Mulch (3" Depth) (Shredded Pine Needle) | 1,350 | SQYD | 5.00 | 6,750.00 | 4.50 | 6,075.00 | 6.00 | 8,100.00 | 5.50 | 7,425.00 |
| 0018 | 719-03-00300 | Bed Preparation (10" Depth) | 1,350 | SQYD | 1.00 | 1,350.00 | 4.50 | 6,075.00 | 6.00 | 8,100.00 | 30.00 | 40,500.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 23,100.00 | 23,100.00 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 |
| 0020 | 728-01-00100 | Jacked or Bored Pipe (2") (HDPE PE Pipe) | 130 | LNFT | 11.00 | 1,430.00 | 12.25 | 1,592.50 | 20.00 | 2,600.00 | 13.50 | 1,755.00 |
| 0021 | 730-01-00100 | Trenching and Backfilling | 750 | LNFT | 3.00 | 2,250.00 | 2.50 | 1,875.00 | 3.75 | 2,812.50 | 4.50 | 3,375.00 |
| 0022 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (Sch 40 PVC, 2 #6 Conductors, 1 #6 Bare Solid Ground) | 885 | LNFT | 4.00 | 3,540.00 | 4.33 | 3,832.05 | 5.00 | 4,425.00 | 0.50 | 442.50 |
| 0023 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 250 | LNFT | 16.00 | 4,000.00 | 16.75 | 4,187.50 | 35.00 | 8,750.00 | 22.50 | 5,625.00 |
| 0024 | 730-05-10000 | Light Pole (18 Ft. Ornamental Cast Aluminum, 6" OD, Smooth Straight Shaft, Black Finish) | 8 | EACH | 4,000.00 | 32,000.00 | 2,667.00 | 21,336.00 | 4,700.00 | 37,600.00 | 2,500.00 | 20,000.00 |
| 0025 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) (Decorative Post Top, 4 Sided, Type 3 Distrbution, Intregal Ballast, 6" Finial, Clear Acrylic Lens, Bronze Finish) | 8 | EACH | 2,300.00 | 18,400.00 | 1,783.00 | 14,264.00 | 1,500.00 | 12,000.00 | 4,000.00 | 32,000.00 |
| 0026 | 730-09-00100 | Electrical System | 1 | LUMP | 2,200.00 | 2,200.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 |
| 0027 | 730-13-00100 | Removal and Disposal of Light Pole Foundation (Remove Foundation 12" Below Grade) | 4 | EACH | 300.00 | 1,200.00 | 100.00 | 400.00 | 375.00 | 1,500.00 | 750.00 | 3,000.00 |
| 0028 | 730-14-00100 | Removal and Disposal of Luminaires | 4 | EACH | 100.00 | 400.00 | 55.00 | 220.00 | 32.00 | 128.00 | 450.00 | 1,800.00 |
| 0029 | 730-20-00020 | Disconnect (Service) (30A-2P, NEMA 3R, F@30A) | 2 | EACH | 300.00 | 600.00 | 175.00 | 350.00 | 400.00 | 800.00 | 1,200.00 | 2,400.00 |
| 0030 | 730-21-00020 | Duct Marker (Concrete) | 4 | EACH | 100.00 | 400.00 | 500.00 | 2,000.00 | 125.00 | 500.00 | 125.00 | 500.00 |
| 0031 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 750 | LNFT | 1.30 | 975.00 | 1.00 | 750.00 | 2.00 | 1,500.00 | 0.50 | 375.00 |
| 0032 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 | 4,400.00 | 4,400.00 | 4,750.00 | 4,750.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 9,500.00 | 9,500.00 | 3,500.00 | 3,500.00 | 13,500.00 | 13,500.00 |
| 0034 | NS-ENH-09000 | Irrigation System (SPN 015-01-0056, Complete and Installed) | 1 | LUMP | 26,000.00 | 26,000.00 | 16,500.00 | 16,500.00 | 25,000.00 | 25,000.00 | 22,500.00 | 22,500.00 |
| 0035 | NS-ENH-18040 | Retaining Walls (Seatwall with Utility Vault, Concrete Base, Metal Cover, Complete and Installed) | 720 | LNFT | 120.00 | 86,400.00 | 163.20 | 117,504.00 | 130.00 | 93,600.00 | 65.00 | 46,800.00 |
| CONTRACTOR TOTAL | 273,853.00 | 279,853.45 | 297,863.00 | 298,948.15 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Quality Design & Construction, LLC |
- 6 - Rotolo Consultants Inc. |
- 7 - JJH Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 204-02-00100 | Temporary Hay or Straw Bales | 254 | EACH | 13.70 | 3,479.80 | 14.60 | 3,708.40 | 15.00 | 3,810.00 |
| 0002 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 2.00 | 200.00 | 2.50 | 250.00 | 1.50 | 150.00 |
| 0003 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,100.00 | 15,100.00 | 21,730.00 | 21,730.00 | 35,000.00 | 35,000.00 |
| 0004 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 538 | SQYD | 4.70 | 2,528.60 | 6.10 | 3,281.80 | 3.00 | 1,614.00 |
| 0005 | 715-01-00100 | Topsoil | 487 | CUYD | 62.00 | 30,194.00 | 67.00 | 32,629.00 | 30.00 | 14,610.00 |
| 0006 | 719-01-02040 | Plants (Tree) (Container) (2" cal) (Lagerstroemia Indica 'Dynamite', 'Dynamite Red' Crape Myrtle, 10'-12' Min Ht, 5 Cane Min, Full Spread) | 20 | EACH | 215.00 | 4,300.00 | 414.20 | 8,284.00 | 150.00 | 3,000.00 |
| 0007 | 719-01-02040 | Plants (Tree) (Container) (2" cal) (Lagerstroemia Indica 'Muskogee', 'Muskogee' Crape Myrtle, 10'-12' Min Ht, 5 Cane Min, Full Spread) | 12 | EACH | 168.00 | 2,016.00 | 380.80 | 4,569.60 | 150.00 | 1,800.00 |
| 0008 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Quercus Shummardi, Shummard Oak, 12'14' Min Ht, Full Spread) | 9 | EACH | 233.00 | 2,097.00 | 432.90 | 3,896.10 | 125.00 | 1,125.00 |
| 0009 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Taxodium Distichum, Bald Cypress, 12'-14' Min Ht, Full Spread) | 20 | EACH | 231.00 | 4,620.00 | 410.60 | 8,212.00 | 125.00 | 2,500.00 |
| 0010 | 719-01-02060 | Plants (Tree) (Container) (2 1/2" cal) (Magnolia Grandiflora, Southern Magnolia, 12'-14' Min Ht, Full Spread) | 16 | EACH | 231.00 | 3,696.00 | 466.00 | 7,456.00 | 125.00 | 2,000.00 |
| 0011 | 719-01-06000 | Plants (Plant) (Container) (4") (Liriope Muscari 'Big Blue', Space 12" On Center) | 1,587 | EACH | 1.80 | 2,856.60 | 2.80 | 4,443.60 | 1.00 | 1,587.00 |
| 0012 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) (Dietes Vegeta, African Iris, Full Plant, Space 2' On Center) | 294 | EACH | 4.80 | 1,411.20 | 6.60 | 1,940.40 | 3.50 | 1,029.00 |
| 0013 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) ('Aztec Gold' and 'Rosie Meyer' Hemerocallis Fulva, Daylily, Full Plant, Space 18" On Center, (50%/50% Mix)) | 208 | EACH | 4.80 | 998.40 | 6.00 | 1,248.00 | 3.50 | 728.00 |
| 0014 | 719-01-06020 | Plants (Plant) (Container) (1 gallon) (Miscanthus Sinensis 'Zebrinus', Zebra Grass, Full Plant, Space 3' On Center) | 313 | EACH | 4.80 | 1,502.40 | 6.00 | 1,878.00 | 3.50 | 1,095.50 |
| 0015 | 719-01-06100 | Plants (Plant) (Container) (7 gallon) (Jjasminum Mesnyi, Primrose Jasmine, Full Plant, Space 6' On Center) | 102 | EACH | 23.90 | 2,437.80 | 28.50 | 2,907.00 | 20.00 | 2,040.00 |
| 0016 | 719-01-06100 | Plants (Plant) (Container) (7 gallon) (Raphiolepis Indica 'Clara', 'Clara' Indian Hawthorn, Full Plant, Space 4' On Center) | 146 | EACH | 23.90 | 3,489.40 | 24.60 | 3,591.60 | 15.00 | 2,190.00 |
| 0017 | 719-02-00100 | Top Dressing Mulch (3" Depth) (Shredded Pine Needle) | 1,350 | SQYD | 4.70 | 6,345.00 | 9.70 | 13,095.00 | 3.00 | 4,050.00 |
| 0018 | 719-03-00300 | Bed Preparation (10" Depth) | 1,350 | SQYD | 4.80 | 6,480.00 | 8.00 | 10,800.00 | 2.00 | 2,700.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 26,200.00 | 26,200.00 | 27,651.60 | 27,651.60 | 35,000.00 | 35,000.00 |
| 0020 | 728-01-00100 | Jacked or Bored Pipe (2") (HDPE PE Pipe) | 130 | LNFT | 12.00 | 1,560.00 | 11.10 | 1,443.00 | 15.00 | 1,950.00 |
| 0021 | 730-01-00100 | Trenching and Backfilling | 750 | LNFT | 3.10 | 2,325.00 | 3.30 | 2,475.00 | 5.00 | 3,750.00 |
| 0022 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (Sch 40 PVC, 2 #6 Conductors, 1 #6 Bare Solid Ground) | 885 | LNFT | 4.20 | 3,717.00 | 4.40 | 3,894.00 | 6.00 | 5,310.00 |
| 0023 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 250 | LNFT | 18.00 | 4,500.00 | 16.70 | 4,175.00 | 20.00 | 5,000.00 |
| 0024 | 730-05-10000 | Light Pole (18 Ft. Ornamental Cast Aluminum, 6" OD, Smooth Straight Shaft, Black Finish) | 8 | EACH | 3,914.00 | 31,312.00 | 4,222.20 | 33,777.60 | 4,200.00 | 33,600.00 |
| 0025 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) (Decorative Post Top, 4 Sided, Type 3 Distrbution, Intregal Ballast, 6" Finial, Clear Acrylic Lens, Bronze Finish) | 8 | EACH | 1,236.00 | 9,888.00 | 1,333.30 | 10,666.40 | 1,400.00 | 11,200.00 |
| 0026 | 730-09-00100 | Electrical System | 1 | LUMP | 2,200.00 | 2,200.00 | 2,222.20 | 2,222.20 | 2,500.00 | 2,500.00 |
| 0027 | 730-13-00100 | Removal and Disposal of Light Pole Foundation (Remove Foundation 12" Below Grade) | 4 | EACH | 960.00 | 3,840.00 | 333.30 | 1,333.20 | 500.00 | 2,000.00 |
| 0028 | 730-14-00100 | Removal and Disposal of Luminaires | 4 | EACH | 12.00 | 48.00 | 27.80 | 111.20 | 50.00 | 200.00 |
| 0029 | 730-20-00020 | Disconnect (Service) (30A-2P, NEMA 3R, F@30A) | 2 | EACH | 309.00 | 618.00 | 333.30 | 666.60 | 500.00 | 1,000.00 |
| 0030 | 730-21-00020 | Duct Marker (Concrete) | 4 | EACH | 103.00 | 412.00 | 111.10 | 444.40 | 125.00 | 500.00 |
| 0031 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 750 | LNFT | 1.30 | 975.00 | 1.40 | 1,050.00 | 1.50 | 1,125.00 |
| 0032 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 3,090.00 | 3,090.00 | 4,244.40 | 4,244.40 | 3,500.00 | 3,500.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 543.20 | 543.20 | 20,000.00 | 20,000.00 |
| 0034 | NS-ENH-09000 | Irrigation System (SPN 015-01-0056, Complete and Installed) | 1 | LUMP | 15,500.00 | 15,500.00 | 22,366.00 | 22,366.00 | 30,000.00 | 30,000.00 |
| 0035 | NS-ENH-18040 | Retaining Walls (Seatwall with Utility Vault, Concrete Base, Metal Cover, Complete and Installed) | 720 | LNFT | 121.00 | 87,120.00 | 110.00 | 79,200.00 | 138.50 | 99,720.00 |
| CONTRACTOR TOTAL | 299,057.20 | 330,184.30 | 337,383.50 | |||||||