Bid Tabulations
Letting of
09/22/2010
LA DOTD Headquarters
| Lead Project: 014-03-0044 | |
| Parish: Allen | |
| Routes: US 165 | |
| Description: 0.58 MI. N. OF LAUDERDALE WOODYARD RD.-1.12 MI. S. OF LA 26 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, MILLING CONCRETE PAVEMENT, RUMBLE STRIPS AND RELATED WORK. | |
| Estimated Construction Cost: $1,301,679.81 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $1,091,517.09 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,163,815.55 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $1,234,190.28 |
| 4 | 05789 | D & J Construction Co., Inc. | $1,481,863.88 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - D & J Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 524 | LNFT | 7.00 | 3,668.00 | 5.00 | 2,620.00 | 6.00 | 3,144.00 | 15.00 | 7,860.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,065 | CUYD | 35.00 | 37,275.00 | 18.00 | 19,170.00 | 20.00 | 21,300.00 | 24.00 | 25,560.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 35 | CUYD | 140.00 | 4,900.00 | 100.00 | 3,500.00 | 43.00 | 1,505.00 | 60.00 | 2,100.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 10,987.8 | TON | 69.00 | 758,158.20 | 74.00 | 813,097.20 | 78.00 | 857,048.40 | 94.00 | 1,032,853.20 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 665.5 | TON | 69.00 | 45,919.50 | 120.00 | 79,860.00 | 125.00 | 83,187.50 | 126.00 | 83,853.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 40,238 | SQYD | 1.75 | 70,416.50 | 0.40 | 16,095.20 | 1.50 | 60,357.00 | 1.30 | 52,309.40 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,676 | CUYD | 34.68 | -58,123.68 | 1.00 | -1,676.00 | 0.10 | -167.60 | 0.10 | -167.60 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 102 | SQYD | 116.00 | 11,832.00 | 115.00 | 11,730.00 | 114.00 | 11,628.00 | 100.00 | 10,200.00 |
| 0009 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 305 | SQYD | 125.00 | 38,125.00 | 118.00 | 35,990.00 | 115.00 | 35,075.00 | 150.00 | 45,750.00 |
| 0010 | 510-03-00100 | Pavement Joint Repair | 60 | TON | 200.00 | 12,000.00 | 210.00 | 12,600.00 | 300.00 | 18,000.00 | 250.00 | 15,000.00 |
| 0011 | 704-03-00100 | Blocked Out Guard Rail | 512.5 | LNFT | 20.00 | 10,250.00 | 19.00 | 9,737.50 | 20.00 | 10,250.00 | 20.00 | 10,250.00 |
| 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 60.00 | 3,000.00 | 60.00 | 3,000.00 | 60.00 | 3,000.00 | 56.00 | 2,800.00 |
| 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,300.00 | 4,600.00 | 2,100.00 | 4,200.00 | 2,200.00 | 4,400.00 | 2,400.00 | 4,800.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 8,800.00 | 8,800.00 | 42,000.00 | 42,000.00 | 50,000.00 | 50,000.00 |
| 0015 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 400 | LNFT | 0.01 | 4.00 | 0.24 | 96.00 | 0.30 | 120.00 | 1.50 | 600.00 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.145 | MILE | 400.00 | 3,258.00 | 300.00 | 2,443.50 | 150.00 | 1,221.75 | 225.00 | 1,832.63 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.715 | MILE | 0.01 | 0.03 | 1.00 | 2.72 | 340.00 | 923.10 | 250.00 | 678.75 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.43 | MILE | 0.01 | 0.05 | 1.00 | 5.43 | 450.00 | 2,443.50 | 450.00 | 2,443.50 |
| 0019 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 0.01 | 0.06 | 50.00 | 300.00 | 55.00 | 330.00 | 50.00 | 300.00 |
| 0020 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 0.01 | 0.03 | 50.00 | 150.00 | 55.00 | 165.00 | 150.00 | 450.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 78,000.00 | 78,000.00 | 26,650.00 | 26,650.00 | 55,000.00 | 55,000.00 |
| 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 100.00 | 200.00 | 80.00 | 160.00 | 80.00 | 160.00 | 100.00 | 200.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 430 | EACH | 5.00 | 2,150.00 | 5.70 | 2,451.00 | 5.00 | 2,150.00 | 5.50 | 2,365.00 |
| 0024 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 400 | LNFT | 1.10 | 440.00 | 1.40 | 560.00 | 1.00 | 400.00 | 3.50 | 1,400.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.43 | MILE | 2,300.00 | 12,489.00 | 2,700.00 | 14,661.00 | 2,500.00 | 13,575.00 | 2,500.00 | 13,575.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.715 | MILE | 700.00 | 1,900.50 | 920.00 | 2,497.80 | 900.00 | 2,443.50 | 1,400.00 | 3,801.00 |
| 0027 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 300.00 | 1,800.00 | 235.00 | 1,410.00 | 265.00 | 1,590.00 | 500.00 | 3,000.00 |
| 0028 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 300.00 | 900.00 | 245.00 | 735.00 | 265.00 | 795.00 | 500.00 | 1,500.00 |
| 0029 | 735-01-00100 | Mailboxes | 3 | EACH | 10.00 | 30.00 | 1.10 | 3.30 | 1.00 | 3.00 | 5.00 | 15.00 |
| 0030 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 400.00 | 1,200.00 | 190.00 | 570.00 | 200.00 | 600.00 | 300.00 | 900.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 4,500.00 | 4,500.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 |
| 0032 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 1,540 | LNFT | 1.10 | 1,694.00 | 1.00 | 1,540.00 | 1.10 | 1,694.00 | 3.00 | 4,620.00 |
| 0033 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,842 | INLF | 13.50 | 65,367.00 | 0.45 | 2,178.90 | 0.50 | 2,421.00 | 1.00 | 4,842.00 |
| 0034 | NS-602-00001 | Milling Concrete Pavement | 3,061.3 | SQYD | 3.00 | 9,183.90 | 10.00 | 30,613.00 | 6.25 | 19,133.13 | 10.00 | 30,613.00 |
| 0035 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 5.4 | MILE | 700.00 | 3,780.00 | 410.00 | 2,214.00 | 675.00 | 3,645.00 | 1,400.00 | 7,560.00 |
| CONTRACTOR TOTAL | 1,091,517.09 | 1,163,815.55 | 1,234,190.28 | 1,481,863.88 | ||||||||