Bid Tabulations
Letting of
06/15/2011
LA DOTD Headquarters
| Lead Project: 014-02-0043 | |
| Parish: Jefferson Davis | |
| Routes: US 165 | |
| Description: C.S.L.M. 5.43 - ALLEN PARISH LINE | |
| Type Const: PATCH, COLD PLANE AND OVERLAY | |
| Estimated Construction Cost: $4,353,665.06 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $3,568,532.67 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $4,360,614.77 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $4,420,551.67 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Diamond B Construction Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 4,000.00 | 4,000.00 | 3,061.66 | 3,061.66 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 2,204 | LNFT | 4.00 | 8,816.00 | 8.00 | 17,632.00 | 3.58 | 7,890.32 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 252 | CUYD | 55.00 | 13,860.00 | 70.00 | 17,640.00 | 41.27 | 10,400.04 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 36,019 | TON | 72.75 | 2,620,382.25 | 88.00 | 3,169,672.00 | 92.23 | 3,322,032.37 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,060 | TON | 72.75 | 149,865.00 | 165.00 | 339,900.00 | 120.38 | 247,982.80 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 146,887 | SQYD | 0.45 | 66,099.15 | 0.75 | 110,165.25 | 1.57 | 230,612.59 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,908 | CUYD | 100.00 | -390,800.00 | 1.00 | -3,908.00 | 0.10 | -390.80 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 2,187 | SQYD | 50.00 | 109,350.00 | 95.00 | 207,765.00 | 85.81 | 187,666.47 |
| 0009 | 510-03-00100 | Pavement Joint Repair | 438 | TON | 110.00 | 48,180.00 | 215.00 | 94,170.00 | 167.97 | 73,570.86 |
| 0010 | 704-03-00100 | Blocked Out Guard Rail | 2,800 | LNFT | 17.75 | 49,700.00 | 19.00 | 53,200.00 | 20.91 | 58,548.00 |
| 0011 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 75 | LNFT | 40.00 | 3,000.00 | 40.00 | 3,000.00 | 38.53 | 2,889.75 |
| 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 56.00 | 11,200.00 | 55.00 | 11,000.00 | 60.54 | 12,108.00 |
| 0013 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 8 | EACH | 2,450.00 | 19,600.00 | 2,500.00 | 20,000.00 | 2,421.68 | 19,373.44 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 371,000.00 | 371,000.00 | 20,000.00 | 20,000.00 | 99,363.52 | 99,363.52 |
| 0015 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 574 | LNFT | 0.01 | 5.74 | 1.00 | 574.00 | 0.28 | 160.72 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.34 | MILE | 400.00 | 10,536.00 | 400.00 | 10,536.00 | 169.52 | 4,465.16 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.56 | MILE | 0.01 | 0.18 | 100.00 | 1,756.00 | 522.86 | 9,181.42 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.12 | MILE | 0.01 | 0.35 | 100.00 | 3,512.00 | 605.42 | 21,262.35 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 355,000.00 | 355,000.00 | 200,000.00 | 200,000.00 | 35,561.70 | 35,561.70 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 80.00 | 640.00 | 71.55 | 572.40 |
| 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,235 | EACH | 4.60 | 5,681.00 | 5.70 | 7,039.50 | 5.78 | 7,138.30 |
| 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 24 | LNFT | 6.00 | 144.00 | 4.90 | 117.60 | 4.95 | 118.80 |
| 0023 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 17.56 | MILE | 1,450.00 | 25,462.00 | 2,100.00 | 36,876.00 | 2,146.49 | 37,692.36 |
| 0024 | 732-02-01040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 40 mil) | 0.108 | MILE | 11,500.00 | 1,242.00 | 4,365.00 | 471.42 | 4,403.06 | 475.53 |
| 0025 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 8.78 | MILE | 450.00 | 3,951.00 | 700.00 | 6,146.00 | 715.50 | 6,282.09 |
| 0026 | 732-04-01000 | Plastic Pavement Legends and Symbols (AHEAD) | 7 | EACH | 450.00 | 3,150.00 | 250.00 | 1,750.00 | 258.68 | 1,810.76 |
| 0027 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 600.00 | 1,200.00 | 430.00 | 860.00 | 440.31 | 880.62 |
| 0028 | 735-01-00100 | Mailboxes | 4 | EACH | 2.00 | 8.00 | 15.00 | 60.00 | 1.10 | 4.40 |
| 0029 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 300.00 | 1,200.00 | 140.00 | 560.00 | 220.15 | 880.60 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 59,000.00 | 59,000.00 | 10,000.00 | 10,000.00 | 6,384.44 | 6,384.44 |
| 0031 | NS-713-00007 | Protected Prairie Grass Area Signs | 180 | EACH | 55.00 | 9,900.00 | 30.00 | 5,400.00 | 12.11 | 2,179.80 |
| 0032 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 16 | MILE | 625.00 | 10,000.00 | 630.00 | 10,080.00 | 649.45 | 10,391.20 |
| CONTRACTOR TOTAL | 3,568,532.67 | 4,360,614.77 | 4,420,551.67 | |||||||