Bid Tabulations
Letting of
04/27/2011
LA DOTD Headquarters
| Lead Project: 013-12-0056 | |
| Parish: St. Tammany | |
| Routes: US 190 | |
| Description: TAMMANY TRACE EXTENSION TO PELICAN PARK | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $340,590.38 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14914 | Kass Bros. Inc. | $356,482.40 |
| 2 | 16378 | Mcdonald Const. Inc. of Slidell | $393,270.30 |
| 3 | 12502 | Leon Lowe & Sons, Inc. | $473,461.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Kass Bros. Inc. |
- 2 - Mcdonald Const. Inc. of Slidell |
- 3 - Leon Lowe & Sons, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 24,600.00 | 24,600.00 | 32,500.00 | 32,500.00 | 30,000.00 | 30,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,300.00 | 2,300.00 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 23,800.00 | 23,800.00 | 32,800.00 | 32,800.00 | 45,000.00 | 45,000.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 133.00 | 1,064.00 | 140.00 | 1,120.00 | 300.00 | 2,400.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 4,500 | LNFT | 1.70 | 7,650.00 | 2.00 | 9,000.00 | 1.50 | 6,750.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 430.9 | TON | 193.00 | 83,163.70 | 137.50 | 59,248.75 | 165.00 | 71,098.50 |
| 0008 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 80 | LNFT | 65.50 | 5,240.00 | 38.00 | 3,040.00 | 45.00 | 3,600.00 |
| 0009 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 210 | LNFT | 76.00 | 15,960.00 | 42.00 | 8,820.00 | 65.00 | 13,650.00 |
| 0010 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 64 | LNFT | 96.00 | 6,144.00 | 60.00 | 3,840.00 | 103.00 | 6,592.00 |
| 0011 | 702-06-01020 | Side Drain End Treatment (1 Barrel, 24" RCP/PP or 30" CMP) | 2 | EACH | 2,800.00 | 5,600.00 | 2,500.00 | 5,000.00 | 1,500.00 | 3,000.00 |
| 0012 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 90 | SQYD | 71.00 | 6,390.00 | 65.00 | 5,850.00 | 70.00 | 6,300.00 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,200.00 | 2,200.00 | 3,500.00 | 3,500.00 | 4,500.00 | 4,500.00 |
| 0014 | 717-01-00100 | Seeding | 57 | LB | 12.00 | 684.00 | 12.00 | 684.00 | 6.00 | 342.00 |
| 0015 | 718-01-00100 | Fertilizer | 960 | LB | 0.90 | 864.00 | 1.20 | 1,152.00 | 0.60 | 576.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 23,000.00 | 23,000.00 | 24,500.00 | 24,500.00 | 69,313.37 | 69,313.37 |
| 0017 | 729-01-00100 | Sign (Type A) | 142.5 | SQFT | 36.00 | 5,130.00 | 32.00 | 4,560.00 | 18.00 | 2,565.00 |
| 0018 | 729-08-00100 | Mounting (2 1/2" Size Post) | 6 | EACH | 1,100.00 | 6,600.00 | 1,000.00 | 6,000.00 | 300.00 | 1,800.00 |
| 0019 | 729-21-00100 | U-Channel Post | 18 | EACH | 121.00 | 2,178.00 | 61.50 | 1,107.00 | 42.00 | 756.00 |
| 0020 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 300 | LNFT | 3.50 | 1,050.00 | 4.00 | 1,200.00 | 4.70 | 1,410.00 |
| 0021 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 6 | EACH | 725.00 | 4,350.00 | 670.00 | 4,020.00 | 725.00 | 4,350.00 |
| 0022 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 4 | EACH | 1,200.00 | 4,800.00 | 1,120.00 | 4,480.00 | 1,200.00 | 4,800.00 |
| 0023 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 5 | EACH | 485.00 | 2,425.00 | 500.00 | 2,500.00 | 520.00 | 2,600.00 |
| 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,350.00 | 7,350.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0025 | NS-ENH-02080 | Bollards Permanent, Furnished and Installed | 14 | EACH | 148.00 | 2,072.00 | 400.00 | 5,600.00 | 400.00 | 5,600.00 |
| 0026 | NS-ENH-02100 | Bollards (Removable) Furnished and Installed | 7 | EACH | 625.00 | 4,375.00 | 950.00 | 6,650.00 | 700.00 | 4,900.00 |
| 0027 | NS-ENH-08000 | Handrails Furnished and Installed | 60 | LNFT | 117.00 | 7,020.00 | 60.00 | 3,600.00 | 100.00 | 6,000.00 |
| 0028 | NS-ENH-19130 | Solar Power LED (Light Emitting Diodes) Beacon Trail Crossing With Detection Complete and Installed | 2 | EACH | 18,400.00 | 36,800.00 | 17,500.00 | 35,000.00 | 18,288.00 | 36,576.00 |
| 0029 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 4,897.9 | SQYD | 13.00 | 63,672.70 | 24.50 | 119,998.55 | 26.13 | 127,982.13 |
| CONTRACTOR TOTAL | 356,482.40 | 393,270.30 | 473,461.00 | |||||||