Bid Tabulations
Letting of
03/17/2010
LA DOTD Headquarters
| Lead Project: 013-10-0043 | |
| Parish: St. Tammany | |
| Routes: US 190 BUSINESS | |
| Description: W. JCT. LA 21 - S. JCT. U.S. 190 | |
| Type Const: GRADING, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK | |
| Estimated Construction Cost: $858,608.49 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC. | $842,513.02 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,010,950.65 |
| 3 | 14807 | Richard Price Contracting Co, Llc | $1,106,423.59 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $1,174,228.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Richard Price Contracting Co, Llc |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 100 | SQYD | 40.00 | 4,000.00 | 55.00 | 5,500.00 | 25.00 | 2,500.00 | 5.00 | 500.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,500 | LNFT | 5.00 | 7,500.00 | 5.00 | 7,500.00 | 13.00 | 19,500.00 | 18.00 | 27,000.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 63 | CUYD | 40.00 | 2,520.00 | 100.00 | 6,300.00 | 87.00 | 5,481.00 | 30.00 | 1,890.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 3,360.5 | TON | 76.00 | 255,398.00 | 84.50 | 283,962.25 | 100.00 | 336,050.00 | 95.00 | 319,247.50 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 663.9 | TON | 100.00 | 66,390.00 | 130.00 | 86,307.00 | 157.00 | 104,232.30 | 95.00 | 63,070.50 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 21,099 | SQYD | 2.50 | 52,747.50 | 4.00 | 84,396.00 | 2.90 | 61,187.10 | 4.00 | 84,396.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,320 | CUYD | 20.00 | -26,400.00 | 0.10 | -132.00 | 24.00 | -31,680.00 | 10.00 | -13,200.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 75.00 | 112,500.00 | 75.00 | 112,500.00 | 95.50 | 143,250.00 | 60.00 | 90,000.00 |
| 0009 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 11,900 | LNFT | 1.75 | 20,825.00 | 1.80 | 21,420.00 | 2.25 | 26,775.00 | 1.80 | 21,420.00 |
| 0010 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 9,550 | LNFT | 1.75 | 16,712.50 | 2.00 | 19,100.00 | 2.25 | 21,487.50 | 2.00 | 19,100.00 |
| 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 350 | LNFT | 4.00 | 1,400.00 | 3.75 | 1,312.50 | 2.00 | 700.00 | 3.50 | 1,225.00 |
| 0012 | 602-04-00001 | Full Depth Corner Patching of Jointed Concrete Pavement (150 square yards @ 8" thick) | 1,200 | SYIN | 25.00 | 30,000.00 | 44.00 | 52,800.00 | 49.00 | 58,800.00 | 40.00 | 48,000.00 |
| 0013 | 602-04-00100 | Full Depth Corner Patching of Jointed Concrete Pavement (16.0 square yards and under) (5" Thick) | 50 | SQYD | 100.00 | 5,000.00 | 310.00 | 15,500.00 | 294.00 | 14,700.00 | 280.00 | 14,000.00 |
| 0014 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 400 | SQYD | 175.00 | 70,000.00 | 190.00 | 76,000.00 | 201.00 | 80,400.00 | 175.00 | 70,000.00 |
| 0015 | 702-04-00100 | Adjusting Manholes | 21 | EACH | 125.00 | 2,625.00 | 300.00 | 6,300.00 | 181.00 | 3,801.00 | 100.00 | 2,100.00 |
| 0016 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 2,000.00 | 4,000.00 | 2,750.00 | 5,500.00 | 3,125.00 | 6,250.00 | 800.00 | 1,600.00 |
| 0017 | 707-01-00300 | Concrete Curb (Mountable) | 1,500 | LNFT | 23.00 | 34,500.00 | 28.00 | 42,000.00 | 21.75 | 32,625.00 | 53.00 | 79,500.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 8,500.00 | 8,500.00 | 15,700.00 | 15,700.00 | 140,000.00 | 140,000.00 |
| 0019 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 10,254 | LNFT | 0.01 | 102.54 | 0.25 | 2,563.50 | 0.30 | 3,076.20 | 0.10 | 1,025.40 |
| 0020 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,982 | LNFT | 0.01 | 59.82 | 0.90 | 5,383.80 | 1.00 | 5,982.00 | 0.30 | 1,794.60 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.62 | MILE | 1.00 | 4.62 | 165.00 | 762.30 | 181.00 | 836.22 | 10.00 | 46.20 |
| 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.466 | MILE | 1.00 | 3.47 | 300.00 | 1,039.80 | 350.00 | 1,213.10 | 15.00 | 51.99 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.568 | MILE | 1.00 | 18.57 | 600.00 | 11,140.80 | 720.00 | 13,368.96 | 20.00 | 371.36 |
| 0024 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 144 | EACH | 1.00 | 144.00 | 55.00 | 7,920.00 | 60.50 | 8,712.00 | 10.00 | 1,440.00 |
| 0025 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 51 | EACH | 1.00 | 51.00 | 55.00 | 2,805.00 | 60.50 | 3,085.50 | 10.00 | 510.00 |
| 0026 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 3,000.00 | 600.00 | 6,100.00 | 1,220.00 | 1,200.00 | 240.00 | 3,500.00 | 700.00 |
| 0027 | 717-01-00100 | Seeding | 3 | LB | 30.00 | 90.00 | 27.00 | 81.00 | 250.00 | 750.00 | 30.00 | 90.00 |
| 0028 | 718-01-00100 | Fertilizer | 102 | LB | 5.00 | 510.00 | 10.00 | 1,020.00 | 10.00 | 1,020.00 | 3.00 | 306.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 83,000.00 | 83,000.00 | 59,000.00 | 59,000.00 | 75,000.00 | 75,000.00 | 115,000.00 | 115,000.00 |
| 0030 | 730-16-00100 | Underground Junction Box (12" x 12") | 6 | EACH | 275.00 | 1,650.00 | 260.00 | 1,560.00 | 325.00 | 1,950.00 | 300.00 | 1,800.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,124 | EACH | 5.00 | 5,620.00 | 5.00 | 5,620.00 | 6.00 | 6,744.00 | 5.00 | 5,620.00 |
| 0032 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,418 | LNFT | 1.00 | 3,418.00 | 1.00 | 3,418.00 | 1.15 | 3,930.70 | 1.00 | 3,418.00 |
| 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,994 | LNFT | 3.50 | 6,979.00 | 3.50 | 6,979.00 | 4.00 | 7,976.00 | 3.50 | 6,979.00 |
| 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.189 | MILE | 2,500.00 | 15,472.50 | 2,500.00 | 15,472.50 | 2,900.00 | 17,948.10 | 2,500.00 | 15,472.50 |
| 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.155 | MILE | 700.00 | 808.50 | 700.00 | 808.50 | 782.00 | 903.21 | 650.00 | 750.75 |
| 0036 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 200.00 | 400.00 | 200.00 | 400.00 | 230.00 | 460.00 | 200.00 | 400.00 |
| 0037 | 732-04-01060 | Plastic Pavement Legends and Symbols (Arrow - Triple) | 1 | EACH | 200.00 | 200.00 | 200.00 | 200.00 | 236.00 | 236.00 | 200.00 | 200.00 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 36 | EACH | 180.00 | 6,480.00 | 180.00 | 6,480.00 | 211.50 | 7,614.00 | 185.00 | 6,660.00 |
| 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 9 | EACH | 180.00 | 1,620.00 | 180.00 | 1,620.00 | 211.50 | 1,903.50 | 185.00 | 1,665.00 |
| 0040 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 17 | EACH | 200.00 | 3,400.00 | 200.00 | 3,400.00 | 223.50 | 3,799.50 | 200.00 | 3,400.00 |
| 0041 | 732-05-00100 | Removal of Existing Markings | 0.5 | MILE | 5,000.00 | 2,500.00 | 5,000.00 | 2,500.00 | 5,450.00 | 2,725.00 | 4,500.00 | 2,250.00 |
| 0042 | 736-01-00100 | Trenching and Backfilling | 390 | LNFT | 3.50 | 1,365.00 | 3.25 | 1,267.50 | 4.00 | 1,560.00 | 3.25 | 1,267.50 |
| 0043 | 736-09-00100 | Loop Detector | 450 | LNFT | 12.00 | 5,400.00 | 12.50 | 5,625.00 | 14.25 | 6,412.50 | 12.00 | 5,400.00 |
| 0044 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 85 | LNFT | 2.00 | 170.00 | 1.80 | 153.00 | 2.20 | 187.00 | 2.00 | 170.00 |
| 0045 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 410 | LNFT | 3.25 | 1,332.50 | 3.00 | 1,230.00 | 3.60 | 1,476.00 | 3.00 | 1,230.00 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,400.00 | 3,400.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 |
| 0047 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 200.00 | 400.00 | 500.00 | 1,000.00 | 325.00 | 650.00 | 700.00 | 1,400.00 |
| 0048 | 806-01-00100 | Deformed Reinforcing Steel | 1,002 | LB | 2.75 | 2,755.50 | 1.60 | 1,603.20 | 2.60 | 2,605.20 | 0.50 | 501.00 |
| 0049 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 600 | INLF | 1.00 | 600.00 | 12.50 | 7,500.00 | 1.25 | 750.00 | 1.00 | 600.00 |
| 0050 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 6,240 | INLF | 1.00 | 6,240.00 | 1.30 | 8,112.00 | 1.25 | 7,800.00 | 1.50 | 9,360.00 |
| 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,000 | INLF | 1.00 | 3,000.00 | 1.10 | 3,300.00 | 1.25 | 3,750.00 | 1.50 | 4,500.00 |
| CONTRACTOR TOTAL | 842,513.02 | 1,010,950.65 | 1,106,423.59 | 1,174,228.30 | ||||||||