Bid Tabulations
Letting of
04/28/2010
LA DOTD Headquarters
| Lead Project: 012-10-0018 | |
| Parish: Evangeline, St. Landry | |
| Routes: US 190 | |
| Description: ACADIA PARISH LINE - 1.0 MI EAST EVANGELINE PARISH LINE | |
| Type Const: PAVEMENT PATCHING, ASPHATLIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $6,186,573.08 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34356 | Prairie Contractors Inc. | $6,429,359.91 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $6,538,379.64 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $7,279,889.69 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Prairie Contractors Inc. |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Diamond B Construction Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 674 | LNFT | 12.00 | 8,088.00 | 7.00 | 4,718.00 | 2.00 | 1,348.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 6,150 | CUYD | 18.00 | 110,700.00 | 16.00 | 98,400.00 | 16.80 | 103,320.00 |
| 0003 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 100.00 | 2,600.00 | 250.00 | 6,500.00 | 183.00 | 4,758.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 170 | CUYD | 100.00 | 17,000.00 | 80.00 | 13,600.00 | 79.70 | 13,549.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 62,718 | TON | 78.00 | 4,892,004.00 | 73.00 | 4,578,414.00 | 84.10 | 5,274,583.80 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 3,275 | TON | 45.00 | 147,375.00 | 130.00 | 425,750.00 | 116.00 | 379,900.00 |
| 0007 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 134,976 | GAL | 3.20 | 431,923.20 | 3.20 | 431,923.20 | 3.30 | 445,420.80 |
| 0008 | 507-02-00200 | Aggregate (S2) | 198,493 | SQYD | 1.00 | 198,493.00 | 1.02 | 202,462.86 | 1.00 | 198,493.00 |
| 0009 | 507-02-00300 | Aggregate (S3) | 198,493 | SQYD | 0.80 | 158,794.40 | 0.83 | 164,749.19 | 0.80 | 158,794.40 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 16,000 | SQYD | 0.63 | 10,080.00 | 3.00 | 48,000.00 | 6.60 | 105,600.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -888 | CUYD | 0.01 | -8.88 | 10.00 | -8,880.00 | 0.10 | -88.80 |
| 0012 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 900 | SQYD | 193.50 | 174,150.00 | 120.00 | 108,000.00 | 123.00 | 110,700.00 |
| 0013 | 701-05-02120 | Side Drain Pipe (Erosion) (42" PP/CMP) | 150 | LNFT | 140.00 | 21,000.00 | 90.00 | 13,500.00 | 194.00 | 29,100.00 |
| 0014 | 704-03-00100 | Blocked Out Guard Rail | 800 | LNFT | 20.00 | 16,000.00 | 17.00 | 13,600.00 | 17.00 | 13,600.00 |
| 0015 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 40.00 | 2,000.00 | 25.00 | 1,250.00 | 26.00 | 1,300.00 |
| 0016 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 54.00 | 5,400.00 | 53.00 | 5,300.00 |
| 0017 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 | 2,130.00 | 8,520.00 |
| 0018 | 712-02-00100 | Sacked Concrete Revetment | 200 | SQYD | 80.00 | 16,000.00 | 100.00 | 20,000.00 | 160.00 | 32,000.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 110,000.00 | 110,000.00 |
| 0020 | 713-02-00200 | Temporary Pavement Markings (6" Width) | 500 | LNFT | 0.01 | 5.00 | 0.20 | 100.00 | 0.15 | 75.00 |
| 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 552 | LNFT | 0.01 | 5.52 | 0.20 | 110.40 | 0.20 | 110.40 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,060 | LNFT | 0.01 | 10.60 | 0.80 | 848.00 | 0.65 | 689.00 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.171 | MILE | 400.00 | 10,468.40 | 300.00 | 7,851.30 | 144.00 | 3,768.62 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.975 | MILE | 0.01 | 0.26 | 1.00 | 25.98 | 266.00 | 6,909.35 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 53.789 | MILE | 0.01 | 0.54 | 1.00 | 53.79 | 532.00 | 28,615.75 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 16 | EACH | 0.01 | 0.16 | 50.00 | 800.00 | 26.00 | 416.00 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 16 | EACH | 0.01 | 0.16 | 50.00 | 800.00 | 26.00 | 416.00 |
| 0028 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 3,455 | EACH | 1.75 | 6,046.25 | 1.00 | 3,455.00 | 1.60 | 5,528.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 235,000.00 | 235,000.00 | 107,800.00 | 107,800.00 |
| 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 54 | EACH | 60.00 | 3,240.00 | 48.00 | 2,592.00 | 48.00 | 2,592.00 |
| 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,055 | EACH | 4.50 | 9,247.50 | 5.60 | 11,508.00 | 4.25 | 8,733.75 |
| 0032 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 250 | LNFT | 1.00 | 250.00 | 0.80 | 200.00 | 0.50 | 125.00 |
| 0033 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 276 | LNFT | 2.00 | 552.00 | 1.45 | 400.20 | 1.00 | 276.00 |
| 0034 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 530 | LNFT | 4.00 | 2,120.00 | 4.85 | 2,570.50 | 3.20 | 1,696.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 26.894 | MILE | 2,300.00 | 61,856.20 | 2,500.00 | 67,235.00 | 2,450.00 | 65,890.30 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.988 | MILE | 700.00 | 9,091.60 | 865.00 | 11,234.62 | 640.00 | 8,312.32 |
| 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 200.00 | 1,600.00 | 230.00 | 1,840.00 | 186.00 | 1,488.00 |
| 0038 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 200.00 | 1,600.00 | 243.00 | 1,944.00 | 186.00 | 1,488.00 |
| 0039 | 732-05-00100 | Removal of Existing Markings | 0.106 | MILE | 5,000.00 | 530.00 | 5,600.00 | 593.60 | 4,300.00 | 455.80 |
| 0040 | 735-01-00100 | Mailboxes | 47 | EACH | 2.00 | 94.00 | 10.00 | 470.00 | 1.00 | 47.00 |
| 0041 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 125.00 | 4,125.00 | 115.00 | 3,795.00 | 106.00 | 3,498.00 |
| 0042 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 150.00 | 1,200.00 | 135.00 | 1,080.00 | 181.00 | 1,448.00 |
| 0043 | 739-01-00100 | Hydro-Seeding | 9.58 | ACRE | 1,100.00 | 10,538.00 | 1,100.00 | 10,538.00 | 1,040.00 | 9,963.20 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 |
| 0045 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 26.7 | MILE | 400.00 | 10,680.00 | 410.00 | 10,947.00 | 500.00 | 13,350.00 |
| CONTRACTOR TOTAL | 6,429,359.91 | 6,538,379.64 | 7,279,889.69 | |||||||