Bid Tabulations
Letting of
05/25/2011
LA DOTD Headquarters
| Lead Project: 010-06-0073 | |
| Parish: Bossier | |
| Routes: US 71 | |
| Description: US 71 TURN LANE ADDITIONS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, PORTLAND CONCRETE CEMENT PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $494,244.15 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 48462 | Fessler And Bowman, Inc. | $357,985.86 |
| 2 | 28218 | F. J. Burnell, Inc. | $399,968.55 |
| 3 | 18546 | C W & W Contractors, Inc. | $644,208.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Fessler And Bowman, Inc. |
- 2 - F. J. Burnell, Inc. |
- 3 - C W & W Contractors, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,649.52 | 1,649.52 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls | 6 | EACH | 335.17 | 2,011.02 | 500.00 | 3,000.00 | 3,000.00 | 18,000.00 |
| 0003 | 202-02-38500 | Removal of Surfacing and Stablized Base | 720.9 | SQYD | 8.07 | 5,817.66 | 10.00 | 7,209.00 | 5.00 | 3,604.50 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 26,555.82 | 26,555.82 | 24,000.00 | 24,000.00 | 25,000.00 | 25,000.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 160 | LNFT | 3.39 | 542.40 | 5.00 | 800.00 | 3.00 | 480.00 |
| 0006 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 2,681.7 | SQYD | 24.53 | 65,782.10 | 17.50 | 46,929.75 | 24.00 | 64,360.80 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 61.00 | 12,200.00 | 125.00 | 25,000.00 | 200.00 | 40,000.00 |
| 0008 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 2,571.9 | SQYD | 53.97 | 138,805.44 | 60.00 | 154,314.00 | 95.00 | 244,330.50 |
| 0009 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 80 | SQYD | 121.40 | 9,712.00 | 150.00 | 12,000.00 | 300.00 | 24,000.00 |
| 0010 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 49 | SQYD | 121.44 | 5,950.56 | 130.00 | 6,370.00 | 200.00 | 9,800.00 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 70 | LNFT | 43.77 | 3,063.90 | 75.00 | 5,250.00 | 50.00 | 3,500.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 8 | LNFT | 64.44 | 515.52 | 150.00 | 1,200.00 | 70.00 | 560.00 |
| 0013 | 701-15-00100 | Concrete Collar | 3 | EACH | 228.60 | 685.80 | 500.00 | 1,500.00 | 500.00 | 1,500.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 2,772.75 | 13,863.75 | 3,500.00 | 17,500.00 | 4,500.00 | 22,500.00 |
| 0015 | 707-01-00300 | Concrete Curb (Mountable) | 1,120 | LNFT | 9.20 | 10,304.00 | 7.00 | 7,840.00 | 15.00 | 16,800.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,555.78 | 13,555.78 | 7,700.00 | 7,700.00 | 16,000.00 | 16,000.00 |
| 0017 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 564.82 | 225.93 | 1,000.00 | 400.00 | 2,000.00 | 800.00 |
| 0018 | 717-01-00100 | Seeding | 6 | LB | 56.48 | 338.88 | 25.00 | 150.00 | 50.00 | 300.00 |
| 0019 | 718-01-00100 | Fertilizer | 200 | LB | 1.13 | 226.00 | 2.00 | 400.00 | 2.00 | 400.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 7,568.64 | 7,568.64 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 |
| 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 200 | EACH | 4.77 | 954.00 | 5.50 | 1,100.00 | 20.00 | 4,000.00 |
| 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 310 | LNFT | 4.77 | 1,478.70 | 4.50 | 1,395.00 | 9.00 | 2,790.00 |
| 0023 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 563 | LNFT | 2.12 | 1,193.56 | 2.20 | 1,238.60 | 3.00 | 1,689.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.644 | MILE | 3,177.14 | 5,223.22 | 3,300.00 | 5,425.20 | 7,000.00 | 11,508.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.822 | MILE | 1,059.05 | 870.54 | 1,500.00 | 1,233.00 | 5,000.00 | 4,110.00 |
| 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 264.76 | 1,588.56 | 165.00 | 990.00 | 500.00 | 3,000.00 |
| 0027 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 264.76 | 1,588.56 | 220.00 | 1,320.00 | 500.00 | 3,000.00 |
| 0028 | 732-05-00100 | Removal of Existing Markings | 0.44 | MILE | 4,236.18 | 1,863.92 | 6,600.00 | 2,904.00 | 20,000.00 | 8,800.00 |
| 0029 | 737-05-00001 | Painted Curbs and Islands | 1,120 | LNFT | 2.12 | 2,374.40 | 2.25 | 2,520.00 | 1.00 | 1,120.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,840.80 | 3,840.80 | 3,500.00 | 3,500.00 | 16,000.00 | 16,000.00 |
| 0031 | 805-12-32000 | Reinforced Concrete Box Culverts (3' x 3') (Extension) | 120 | LNFT | 138.52 | 16,622.40 | 150.00 | 18,000.00 | 300.00 | 36,000.00 |
| 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 128 | INLF | 7.91 | 1,012.48 | 10.00 | 1,280.00 | 2.00 | 256.00 |
| CONTRACTOR TOTAL | 357,985.86 | 399,968.55 | 644,208.80 | |||||||