Bid Tabulations
Letting of
05/25/2011
LA DOTD Headquarters
| Lead Project: 010-03-0035 | |
| Parish: Red River | |
| Routes: US 71 | |
| Description: ROADWAY DRAINAGE IMPROVEMENTS, US 171 @ US 371, PHASE II | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $1,314,741.37 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 48925 | David V. Temple | $903,692.76 |
| 2 | 30774 | Progressive Construction Co., LLC | $1,034,388.70 |
| 3 | 35849 | T.L. Construction LLC | $1,067,229.50 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $1,239,722.46 |
| 5 | 44289 | Jeff Mercer LLC | $1,338,471.65 |
| 6 | 18546 | C W & W Contractors, Inc. | $1,564,562.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - David V. Temple |
- 2 - Progressive Construction Co., LLC |
- 3 - T.L. Construction LLC |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 1,215.8 | SQYD | 8.00 | 9,726.40 | 5.00 | 6,079.00 | 7.00 | 8,510.60 | 4.20 | 5,106.36 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 75.9 | SQYD | 37.50 | 2,846.25 | 5.00 | 379.50 | 11.00 | 834.90 | 19.00 | 1,442.10 |
| 0003 | 202-02-06040 | Removal of Concrete Box Headwall Remove Concrete Box Headwall | 2 | EACH | 738.00 | 1,476.00 | 900.00 | 1,800.00 | 900.00 | 1,800.00 | 1,800.00 | 3,600.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 670.33 | 2,010.99 | 800.00 | 2,400.00 | 700.00 | 2,100.00 | 995.00 | 2,985.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove 60" CMP @ 40' | 40 | LNFT | 38.50 | 1,540.00 | 10.00 | 400.00 | 30.00 | 1,200.00 | 3.00 | 120.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove 18" RCP @ 36' | 36 | LNFT | 38.25 | 1,377.00 | 16.00 | 576.00 | 20.00 | 720.00 | 3.00 | 108.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12" @ 26', 18" @ 108', 24" @88', 36" @ 26' | 248 | LNFT | 17.49 | 4,337.52 | 16.00 | 3,968.00 | 13.00 | 3,224.00 | 3.00 | 744.00 |
| 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" @ 167', 24" @ 730' | 897 | LNFT | 16.00 | 14,352.00 | 10.00 | 8,970.00 | 8.00 | 7,176.00 | 3.00 | 2,691.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,960.00 | 40,960.00 | 21,000.00 | 21,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 150 | EACH | 120.00 | 18,000.00 | 75.00 | 11,250.00 | 130.00 | 19,500.00 | 125.00 | 18,750.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 3.50 | 5,250.00 | 4.00 | 6,000.00 | 2.00 | 3,000.00 | 1.70 | 2,550.00 |
| 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 278.4 | TON | 175.00 | 48,720.00 | 160.00 | 44,544.00 | 175.00 | 48,720.00 | 200.00 | 55,680.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 362.2 | SQYD | 77.55 | 28,088.61 | 75.00 | 27,165.00 | 110.00 | 39,842.00 | 135.00 | 48,897.00 |
| 0014 | 602-05-02000 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (5" Thick) | 29 | SQYD | 71.60 | 2,076.40 | 125.00 | 3,625.00 | 125.00 | 3,625.00 | 240.00 | 6,960.00 |
| 0015 | 602-05-03040 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (6" Thick) | 83 | SQYD | 71.61 | 5,943.63 | 105.00 | 8,715.00 | 135.00 | 11,205.00 | 205.00 | 17,015.00 |
| 0016 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 58 | LNFT | 82.12 | 4,762.96 | 150.00 | 8,700.00 | 130.00 | 7,540.00 | 290.00 | 16,820.00 |
| 0017 | 701-01-02220 | Cross Drain Pipe (60" RCP or 72" CMP) | 80 | LNFT | 203.96 | 16,316.80 | 490.00 | 39,200.00 | 260.00 | 20,800.00 | 320.00 | 25,600.00 |
| 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 28 | LNFT | 32.72 | 916.16 | 59.00 | 1,652.00 | 60.00 | 1,680.00 | 125.00 | 3,500.00 |
| 0019 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 578 | LNFT | 45.71 | 26,420.38 | 85.00 | 49,130.00 | 70.00 | 40,460.00 | 95.00 | 54,910.00 |
| 0020 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 116 | LNFT | 64.56 | 7,488.96 | 95.00 | 11,020.00 | 80.00 | 9,280.00 | 105.00 | 12,180.00 |
| 0021 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 940 | LNFT | 88.72 | 83,396.80 | 125.00 | 117,500.00 | 122.00 | 114,680.00 | 140.00 | 131,600.00 |
| 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 28 | LNFT | 38.74 | 1,084.72 | 59.00 | 1,652.00 | 60.00 | 1,680.00 | 145.00 | 4,060.00 |
| 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 852 | LNFT | 50.98 | 43,434.96 | 80.00 | 68,160.00 | 75.00 | 63,900.00 | 100.00 | 85,200.00 |
| 0024 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 246 | LNFT | 65.34 | 16,073.64 | 110.00 | 27,060.00 | 96.00 | 23,616.00 | 135.00 | 33,210.00 |
| 0025 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 232 | LNFT | 81.72 | 18,959.04 | 120.00 | 27,840.00 | 100.00 | 23,200.00 | 138.00 | 32,016.00 |
| 0026 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 2,142 | LNFT | 101.07 | 216,491.94 | 125.00 | 267,750.00 | 115.00 | 246,330.00 | 140.00 | 299,880.00 |
| 0027 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 3,065.79 | 9,197.37 | 4,100.00 | 12,300.00 | 3,500.00 | 10,500.00 | 5,800.00 | 17,400.00 |
| 0028 | 702-02-00300 | Manholes (R-CB-11 MOD) | 5 | EACH | 4,236.51 | 21,182.55 | 6,700.00 | 33,500.00 | 6,300.00 | 31,500.00 | 8,500.00 | 42,500.00 |
| 0029 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 2,443.25 | 12,216.25 | 3,200.00 | 16,000.00 | 3,100.00 | 15,500.00 | 2,700.00 | 13,500.00 |
| 0030 | 702-03-00200 | Catch Basins (CB-02) | 12 | EACH | 2,935.09 | 35,221.08 | 4,200.00 | 50,400.00 | 4,500.00 | 54,000.00 | 4,000.00 | 48,000.00 |
| 0031 | 711-03-00400 | Riprap (55 lb) 18" Thick | 736 | TON | 58.30 | 42,908.80 | 55.00 | 40,480.00 | 75.00 | 55,200.00 | 55.00 | 40,480.00 |
| 0032 | 712-02-00200 | Sacked Concrete Revetment (Wet batched) | 60 | SQYD | 90.00 | 5,400.00 | 65.00 | 3,900.00 | 75.00 | 4,500.00 | 185.00 | 11,100.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,500.00 | 8,500.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 |
| 0034 | 715-01-00100 | Topsoil | 220 | CUYD | 30.00 | 6,600.00 | 10.00 | 2,200.00 | 20.00 | 4,400.00 | 30.00 | 6,600.00 |
| 0035 | 716-01-00100 | Mulch (Vegetative) | 6.27 | TON | 810.00 | 5,078.70 | 800.00 | 5,016.00 | 900.00 | 5,643.00 | 500.00 | 3,135.00 |
| 0036 | 717-01-00100 | Seeding | 63 | LB | 20.00 | 1,260.00 | 16.00 | 1,008.00 | 17.00 | 1,071.00 | 9.00 | 567.00 |
| 0037 | 718-01-00100 | Fertilizer | 3,180 | LB | 0.65 | 2,067.00 | 0.45 | 1,431.00 | 1.30 | 4,134.00 | 0.44 | 1,399.20 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 63,000.00 | 63,000.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,205.00 | 7,205.00 | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 |
| 0040 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 3,642.85 | 3,642.85 | 3,600.00 | 3,600.00 | 5,000.00 | 5,000.00 | 1,100.00 | 1,100.00 |
| 0041 | 741-08-00100 | Relocating Water Meter | 2 | EACH | 280.00 | 560.00 | 250.00 | 500.00 | 500.00 | 1,000.00 | 800.00 | 1,600.00 |
| 0042 | 741-11-00200 | Adjusting Water Valve and Meter Box | 2 | EACH | 240.00 | 480.00 | 250.00 | 500.00 | 250.00 | 500.00 | 800.00 | 1,600.00 |
| 0043 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 50.64 | CUYD | 1,050.00 | 53,172.00 | 850.00 | 43,044.00 | 1,100.00 | 55,704.00 | 1,100.00 | 55,704.00 |
| 0044 | 805-12-32000 | Reinforced Concrete Box Culverts (3' x 3') (Extension) | 3 | LNFT | 309.00 | 927.00 | 400.00 | 1,200.00 | 500.00 | 1,500.00 | 940.00 | 2,820.00 |
| 0045 | 805-12-32060 | Reinforced Concrete Box Culverts (6' x 3') (Extension) | 6 | LNFT | 618.00 | 3,708.00 | 700.00 | 4,200.00 | 625.00 | 3,750.00 | 1,000.00 | 6,000.00 |
| 0046 | 806-01-00100 | Deformed Reinforcing Steel | 1,852 | LB | 1.25 | 2,315.00 | 0.85 | 1,574.20 | 2.00 | 3,704.00 | 1.40 | 2,592.80 |
| CONTRACTOR TOTAL | 903,692.76 | 1,034,388.70 | 1,067,229.50 | 1,239,722.46 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Jeff Mercer LLC |
- 6 - C W & W Contractors, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 1,215.8 | SQYD | 10.00 | 12,158.00 | 5.00 | 6,079.00 |
| 0002 | 202-02-02020 | Removal of Asphalt Pavement | 75.9 | SQYD | 8.50 | 645.15 | 5.00 | 379.50 |
| 0003 | 202-02-06040 | Removal of Concrete Box Headwall Remove Concrete Box Headwall | 2 | EACH | 5,000.00 | 10,000.00 | 1,500.00 | 3,000.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 3 | EACH | 3,500.00 | 10,500.00 | 1,000.00 | 3,000.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove 60" CMP @ 40' | 40 | LNFT | 60.00 | 2,400.00 | 50.00 | 2,000.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove 18" RCP @ 36' | 36 | LNFT | 30.00 | 1,080.00 | 10.00 | 360.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) 12" @ 26', 18" @ 108', 24" @88', 36" @ 26' | 248 | LNFT | 25.00 | 6,200.00 | 10.00 | 2,480.00 |
| 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" @ 167', 24" @ 730' | 897 | LNFT | 20.00 | 17,940.00 | 10.00 | 8,970.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 150 | EACH | 25.00 | 3,750.00 | 10.00 | 1,500.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 1.50 | 2,250.00 | 3.00 | 4,500.00 |
| 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 278.4 | TON | 210.00 | 58,464.00 | 300.00 | 83,520.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 362.2 | SQYD | 110.00 | 39,842.00 | 225.00 | 81,495.00 |
| 0014 | 602-05-02000 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (5" Thick) | 29 | SQYD | 125.00 | 3,625.00 | 300.00 | 8,700.00 |
| 0015 | 602-05-03040 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (6" Thick) | 83 | SQYD | 150.00 | 12,450.00 | 200.00 | 16,600.00 |
| 0016 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 58 | LNFT | 100.00 | 5,800.00 | 105.00 | 6,090.00 |
| 0017 | 701-01-02220 | Cross Drain Pipe (60" RCP or 72" CMP) | 80 | LNFT | 300.00 | 24,000.00 | 340.00 | 27,200.00 |
| 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 28 | LNFT | 75.00 | 2,100.00 | 50.00 | 1,400.00 |
| 0019 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 578 | LNFT | 65.00 | 37,570.00 | 70.00 | 40,460.00 |
| 0020 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 116 | LNFT | 90.00 | 10,440.00 | 100.00 | 11,600.00 |
| 0021 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 940 | LNFT | 170.00 | 159,800.00 | 175.00 | 164,500.00 |
| 0022 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 28 | LNFT | 65.00 | 1,820.00 | 70.00 | 1,960.00 |
| 0023 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 852 | LNFT | 80.00 | 68,160.00 | 80.00 | 68,160.00 |
| 0024 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 246 | LNFT | 115.00 | 28,290.00 | 105.00 | 25,830.00 |
| 0025 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 232 | LNFT | 150.00 | 34,800.00 | 130.00 | 30,160.00 |
| 0026 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 2,142 | LNFT | 160.00 | 342,720.00 | 180.00 | 385,560.00 |
| 0027 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 3,500.00 | 10,500.00 | 5,000.00 | 15,000.00 |
| 0028 | 702-02-00300 | Manholes (R-CB-11 MOD) | 5 | EACH | 7,500.00 | 37,500.00 | 10,000.00 | 50,000.00 |
| 0029 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 2,000.00 | 10,000.00 | 5,000.00 | 25,000.00 |
| 0030 | 702-03-00200 | Catch Basins (CB-02) | 12 | EACH | 3,500.00 | 42,000.00 | 8,000.00 | 96,000.00 |
| 0031 | 711-03-00400 | Riprap (55 lb) 18" Thick | 736 | TON | 90.00 | 66,240.00 | 95.00 | 69,920.00 |
| 0032 | 712-02-00200 | Sacked Concrete Revetment (Wet batched) | 60 | SQYD | 250.00 | 15,000.00 | 100.00 | 6,000.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 |
| 0034 | 715-01-00100 | Topsoil | 220 | CUYD | 30.00 | 6,600.00 | 25.00 | 5,500.00 |
| 0035 | 716-01-00100 | Mulch (Vegetative) | 6.27 | TON | 1,050.00 | 6,583.50 | 1,500.00 | 9,405.00 |
| 0036 | 717-01-00100 | Seeding | 63 | LB | 6.00 | 378.00 | 50.00 | 3,150.00 |
| 0037 | 718-01-00100 | Fertilizer | 3,180 | LB | 0.50 | 1,590.00 | 2.00 | 6,360.00 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 125,000.00 | 125,000.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0040 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 2,800.00 | 2,800.00 | 5,000.00 | 5,000.00 |
| 0041 | 741-08-00100 | Relocating Water Meter | 2 | EACH | 300.00 | 600.00 | 500.00 | 1,000.00 |
| 0042 | 741-11-00200 | Adjusting Water Valve and Meter Box | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 |
| 0043 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 50.64 | CUYD | 1,050.00 | 53,172.00 | 1,200.00 | 60,768.00 |
| 0044 | 805-12-32000 | Reinforced Concrete Box Culverts (3' x 3') (Extension) | 3 | LNFT | 800.00 | 2,400.00 | 500.00 | 1,500.00 |
| 0045 | 805-12-32060 | Reinforced Concrete Box Culverts (6' x 3') (Extension) | 6 | LNFT | 1,500.00 | 9,000.00 | 550.00 | 3,300.00 |
| 0046 | 806-01-00100 | Deformed Reinforcing Steel | 1,852 | LB | 2.00 | 3,704.00 | 3.00 | 5,556.00 |
| CONTRACTOR TOTAL | 1,338,471.65 | 1,564,562.50 | ||||||