Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 010-02-0010 | |
| Parish: Red River | |
| Routes: US 71 | |
| Description: NATCHITOCHES PARISH LINE TO US 84 | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANNING ASPHALTIC PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $1,999,280.38 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,810,303.13 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,962,783.54 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) STATION 230+36 | 15 | LNFT | 150.00 | 2,250.00 | 30.00 | 450.00 |
| 0002 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,372 | SQYD | 14.00 | 33,208.00 | 9.00 | 21,348.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 750 | CUYD | 12.00 | 9,000.00 | 25.00 | 18,750.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 20 | CUYD | 40.00 | 800.00 | 50.00 | 1,000.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 15,831 | TON | 70.00 | 1,108,170.00 | 78.00 | 1,234,818.00 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 110 | TON | 62.00 | 6,820.00 | 175.00 | 19,250.00 |
| 0007 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 33,185 | GAL | 2.93 | 97,232.05 | 3.10 | 102,873.50 |
| 0008 | 507-02-00200 | Aggregate (S2) CRUSHED STONE ONLY | 80,939 | SQYD | 0.96 | 77,701.44 | 1.00 | 80,939.00 |
| 0009 | 509-01-00100 | Cold Planing Asphaltic Pavement | 124,965 | SQYD | 1.30 | 162,454.50 | 0.50 | 62,482.50 |
| 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,905 | CUYD | 0.10 | -390.50 | 0.10 | -390.50 |
| 0011 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 250 | SQYD | 75.00 | 18,750.00 | 75.00 | 18,750.00 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 500 | SQYD | 75.00 | 37,500.00 | 115.00 | 57,500.00 |
| 0013 | 510-03-00100 | Pavement Joint Repair | 230 | TON | 60.00 | 13,800.00 | 250.00 | 57,500.00 |
| 0014 | 701-08-00100 | Relaying Pipe | 4 | LNFT | 150.00 | 600.00 | 120.00 | 480.00 |
| 0015 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 200.00 | 3,200.00 | 100.00 | 1,600.00 |
| 0016 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,250.00 | 2,500.00 | 700.00 | 1,400.00 |
| 0017 | 712-04-00100 | Flexible Revetment | 250 | SQYD | 80.00 | 20,000.00 | 40.00 | 10,000.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 39,500.00 | 39,500.00 | 20,000.00 | 20,000.00 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.75 | MILE | 325.00 | 5,768.75 | 250.00 | 4,437.50 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.992 | MILE | 1.00 | 6.99 | 1.00 | 6.99 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 62.854 | MILE | 1.00 | 62.85 | 1.00 | 62.85 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,000.00 | 2,000.00 | 700.00 | 1,400.00 |
| 0023 | 717-01-00100 | Seeding | 80 | LB | 10.00 | 800.00 | 8.50 | 680.00 |
| 0024 | 718-01-00100 | Fertilizer | 2,000 | LB | 1.00 | 2,000.00 | 0.50 | 1,000.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 39,500.00 | 39,500.00 | 100,000.00 | 100,000.00 |
| 0026 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 55.00 | 110.00 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,869 | EACH | 4.25 | 7,943.25 | 5.50 | 10,279.50 |
| 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) BROKEN (MEASURED CONTINUOUSLY) | 148 | LNFT | 4.00 | 592.00 | 1.45 | 214.60 |
| 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 148 | LNFT | 4.00 | 592.00 | 1.45 | 214.60 |
| 0030 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 260 | LNFT | 6.00 | 1,560.00 | 5.00 | 1,300.00 |
| 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 31.844 | MILE | 2,000.00 | 63,688.00 | 2,500.00 | 79,610.00 |
| 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.496 | MILE | 1,200.00 | 4,195.20 | 900.00 | 3,146.40 |
| 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 300.00 | 600.00 | 230.00 | 460.00 |
| 0034 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 500.00 | 1,000.00 | 240.00 | 480.00 |
| 0035 | 735-01-00100 | Mailboxes Standard Size | 140 | EACH | 1.00 | 140.00 | 10.00 | 1,400.00 |
| 0036 | 735-01-00100 | Mailboxes Large Size | 21 | EACH | 10.00 | 210.00 | 11.00 | 231.00 |
| 0037 | 735-02-00100 | Mailbox Supports (Single) | 161 | EACH | 109.00 | 17,549.00 | 150.00 | 24,150.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 |
| 0039 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 22,176 | LNFT | 0.85 | 18,849.60 | 0.85 | 18,849.60 |
| CONTRACTOR TOTAL | 1,810,303.13 | 1,962,783.54 | ||||||