Bid Tabulations
Letting of
05/25/2011
LA DOTD Headquarters
| Lead Project: 007-07-0059 | |
| Parish: Ascension | |
| Routes: U.S. 61 & LA 73 | |
| Description: SB LTL MOD, SB LTL AT LA 429 | |
| Type Const: CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE, PORTLAND CEMENT CONCRETE, DRIVES, TURNOUTS, PIPE, PAVEMENT MARKINGS, STRIPING AND RELATED WORK. | |
| Estimated Construction Cost: $752,378.02 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $708,583.94 |
| 2 | 52550 | Gibbs & Register Inc | $845,000.00 |
| 3 | 55564 | Coastal Industries Llc | $987,284.85 |
| 4 | 39462 | Jb James Construction Llc | $993,700.04 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Byron E. Talbot Contractor, Inc. |
- 2 - Gibbs & Register Inc |
- 3 - Coastal Industries Llc |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of PAVED GUTTER DRAIN | 2 | EACH | 300.00 | 600.00 | 2,000.00 | 4,000.00 | 500.00 | 1,000.00 | 300.00 | 600.00 |
| 0002 | 202-02-00010 | Removal of TRAFFIC SIGNAL BOX | 1 | EACH | 350.00 | 350.00 | 335.00 | 335.00 | 500.00 | 500.00 | 500.00 | 500.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 177 | SQYD | 6.00 | 1,062.00 | 15.00 | 2,655.00 | 25.00 | 4,425.00 | 8.00 | 1,416.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,054 | SQYD | 8.75 | 9,222.50 | 12.00 | 12,648.00 | 15.00 | 15,810.00 | 11.00 | 11,594.00 |
| 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 216 | LNFT | 1.50 | 324.00 | 12.00 | 2,592.00 | 25.00 | 5,400.00 | 5.00 | 1,080.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 327 | LNFT | 6.50 | 2,125.50 | 6.00 | 1,962.00 | 5.00 | 1,635.00 | 12.00 | 3,924.00 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (18") | 357 | LNFT | 5.00 | 1,785.00 | 12.00 | 4,284.00 | 10.00 | 3,570.00 | 14.00 | 4,998.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 828 | SQYD | 9.75 | 8,073.00 | 15.00 | 12,420.00 | 10.00 | 8,280.00 | 6.00 | 4,968.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 26,500.00 | 26,500.00 | 21,000.00 | 21,000.00 | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 |
| 0010 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,230 | CUYD | 16.75 | 37,352.50 | 25.00 | 55,750.00 | 10.00 | 22,300.00 | 25.00 | 55,750.00 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 64 | EACH | 11.50 | 736.00 | 13.00 | 832.00 | 10.00 | 640.00 | 11.00 | 704.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 3,500 | LNFT | 2.25 | 7,875.00 | 1.40 | 4,900.00 | 1.50 | 5,250.00 | 2.00 | 7,000.00 |
| 0013 | 302-02-06100 | Class II Base Course (12" Thick) (Stone) | 2,629.5 | SQYD | 27.30 | 71,785.35 | 40.00 | 105,180.00 | 35.00 | 92,032.50 | 39.00 | 102,550.50 |
| 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 184.4 | CUYD | 80.00 | 14,752.00 | 110.00 | 20,284.00 | 20.00 | 3,688.00 | 100.00 | 18,440.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 320 | CUYD | 80.00 | 25,600.00 | 90.00 | 28,800.00 | 25.00 | 8,000.00 | 100.00 | 32,000.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,533.9 | TON | 115.00 | 176,398.50 | 140.00 | 214,746.00 | 115.00 | 176,398.50 | 120.00 | 184,068.00 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 113 | TON | 146.50 | 16,554.50 | 140.00 | 15,820.00 | 175.00 | 19,775.00 | 150.00 | 16,950.00 |
| 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,270 | SQYD | 4.75 | 20,282.50 | 6.00 | 25,620.00 | 6.50 | 27,755.00 | 4.00 | 17,080.00 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -95 | CUYD | 1.00 | -95.00 | 1.00 | -95.00 | 0.01 | -0.95 | 1.00 | -95.00 |
| 0020 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 384 | LNFT | 42.00 | 16,128.00 | 45.00 | 17,280.00 | 47.50 | 18,240.00 | 42.00 | 16,128.00 |
| 0021 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 112 | LNFT | 60.00 | 6,720.00 | 55.00 | 6,160.00 | 56.00 | 6,272.00 | 54.00 | 6,048.00 |
| 0022 | 701-14-00100 | Cleaning Existing Pipes | 300 | LNFT | 10.00 | 3,000.00 | 10.00 | 3,000.00 | 15.00 | 4,500.00 | 13.00 | 3,900.00 |
| 0023 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 3 | EACH | 1,200.00 | 3,600.00 | 3,000.00 | 9,000.00 | 1,500.00 | 4,500.00 | 1,700.00 | 5,100.00 |
| 0024 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,100.00 | 4,200.00 | 3,500.00 | 7,000.00 | 2,500.00 | 5,000.00 | 2,800.00 | 5,600.00 |
| 0025 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 500.00 | 1,500.00 | 1,200.00 | 3,600.00 | 1,100.00 | 3,300.00 | 2,400.00 | 7,200.00 |
| 0026 | 704-03-00100 | Blocked Out Guard Rail | 178.2 | LNFT | 23.50 | 4,187.70 | 23.00 | 4,098.60 | 22.00 | 3,920.40 | 22.00 | 3,920.40 |
| 0027 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 70.00 | 3,500.00 | 67.00 | 3,350.00 | 85.00 | 4,250.00 | 85.00 | 4,250.00 |
| 0028 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,400.00 | 2,400.00 | 2,300.00 | 2,300.00 | 3,000.00 | 3,000.00 | 2,250.00 | 2,250.00 |
| 0029 | 706-01-00100 | Concrete Walk (4" Thick) | 21.3 | SQYD | 70.00 | 1,491.00 | 45.00 | 958.50 | 65.00 | 1,384.50 | 64.00 | 1,363.20 |
| 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 740.4 | SQYD | 50.00 | 37,020.00 | 50.00 | 37,020.00 | 75.00 | 55,530.00 | 64.00 | 47,385.60 |
| 0031 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 320.7 | SQYD | 37.00 | 11,865.90 | 35.00 | 11,224.50 | 65.00 | 20,845.50 | 45.00 | 14,431.50 |
| 0032 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 42.8 | SQYD | 70.00 | 2,996.00 | 60.00 | 2,568.00 | 75.00 | 3,210.00 | 90.00 | 3,852.00 |
| 0033 | 707-03-00100 | Combination Concrete Curb and Gutter | 640 | LNFT | 40.00 | 25,600.00 | 18.00 | 11,520.00 | 35.00 | 22,400.00 | 33.00 | 21,120.00 |
| 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 29,936.37 | 29,936.37 | 25,000.00 | 25,000.00 | 120,000.00 | 120,000.00 |
| 0035 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 916 | LNFT | 0.25 | 229.00 | 0.35 | 320.60 | 0.25 | 229.00 | 0.22 | 201.52 |
| 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 949 | LNFT | 0.80 | 759.20 | 1.00 | 949.00 | 0.75 | 711.75 | 0.75 | 711.75 |
| 0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.457 | MILE | 500.00 | 728.50 | 325.00 | 473.53 | 400.00 | 582.80 | 1,010.00 | 1,471.57 |
| 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.098 | MILE | 500.00 | 549.00 | 325.00 | 356.85 | 475.00 | 521.55 | 500.00 | 549.00 |
| 0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.147 | MILE | 580.00 | 2,985.26 | 735.00 | 3,783.05 | 550.00 | 2,830.85 | 600.00 | 3,088.20 |
| 0040 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 16 | EACH | 50.00 | 800.00 | 55.00 | 880.00 | 45.00 | 720.00 | 50.00 | 800.00 |
| 0041 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 50.00 | 400.00 | 55.00 | 440.00 | 45.00 | 360.00 | 50.00 | 400.00 |
| 0042 | 726-01-00100 | Bedding Material | 346 | CUYD | 65.00 | 22,490.00 | 69.00 | 23,874.00 | 1.00 | 346.00 | 55.00 | 19,030.00 |
| 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 32,000.00 | 32,000.00 | 58,000.00 | 58,000.00 | 275,000.00 | 275,000.00 | 98,000.00 | 98,000.00 |
| 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 85.00 | 170.00 | 85.00 | 170.00 | 85.00 | 170.00 | 85.00 | 170.00 |
| 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 876 | EACH | 5.60 | 4,905.60 | 5.00 | 4,380.00 | 5.25 | 4,599.00 | 6.00 | 5,256.00 |
| 0046 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 627 | LNFT | 1.45 | 909.15 | 2.00 | 1,254.00 | 1.35 | 846.45 | 2.00 | 1,254.00 |
| 0047 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 201 | LNFT | 2.65 | 532.65 | 4.00 | 804.00 | 2.50 | 502.50 | 3.00 | 603.00 |
| 0048 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 408 | LNFT | 4.75 | 1,938.00 | 6.00 | 2,448.00 | 4.50 | 1,836.00 | 5.00 | 2,040.00 |
| 0049 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 126 | LNFT | 5.30 | 667.80 | 6.00 | 756.00 | 5.00 | 630.00 | 5.00 | 630.00 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.161 | MILE | 2,925.00 | 3,395.93 | 3,000.00 | 3,483.00 | 2,750.00 | 3,192.75 | 2,800.00 | 3,250.80 |
| 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.135 | MILE | 900.00 | 121.50 | 1,000.00 | 135.00 | 850.00 | 114.75 | 1,000.00 | 135.00 |
| 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 230.00 | 1,840.00 | 250.00 | 2,000.00 | 215.00 | 1,720.00 | 225.00 | 1,800.00 |
| 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 230.00 | 920.00 | 250.00 | 1,000.00 | 215.00 | 860.00 | 225.00 | 900.00 |
| 0054 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 240.00 | 1,680.00 | 250.00 | 1,750.00 | 225.00 | 1,575.00 | 225.00 | 1,575.00 |
| 0055 | 735-01-00100 | Mailboxes | 13 | EACH | 10.00 | 130.00 | 6.00 | 78.00 | 10.00 | 130.00 | 20.00 | 260.00 |
| 0056 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 205.00 | 2,665.00 | 200.00 | 2,600.00 | 100.00 | 1,300.00 | 125.00 | 1,625.00 |
| 0057 | 736-01-00100 | Trenching and Backfilling | 300 | LNFT | 5.35 | 1,605.00 | 13.50 | 4,050.00 | 5.00 | 1,500.00 | 13.00 | 3,900.00 |
| 0058 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) W/2-#14 AWG CONDUCTORS | 300 | LNFT | 6.35 | 1,905.00 | 9.50 | 2,850.00 | 6.00 | 1,800.00 | 9.00 | 2,700.00 |
| 0059 | 736-09-00100 | Loop Detector | 45 | LNFT | 12.75 | 573.75 | 13.50 | 607.50 | 12.00 | 540.00 | 15.00 | 675.00 |
| 0060 | 736-10-00100 | Underground Junction Box (Type D) | 1 | EACH | 425.00 | 425.00 | 475.00 | 475.00 | 400.00 | 400.00 | 500.00 | 500.00 |
| 0061 | 739-01-00100 | Hydro-Seeding | 1.95 | ACRE | 1,175.00 | 2,291.25 | 1,550.00 | 3,022.50 | 1,100.00 | 2,145.00 | 1,100.00 | 2,145.00 |
| 0062 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 5,000.00 | 5,000.00 |
| 0063 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 50 | TON | 400.00 | 20,000.00 | 140.00 | 7,000.00 | 65.00 | 3,250.00 | 255.00 | 12,750.00 |
| 0064 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 8,377 | INLF | 1.00 | 8,377.00 | 1.00 | 8,377.00 | 1.00 | 8,377.00 | 1.00 | 8,377.00 |
| 0065 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,684 | INLF | 1.35 | 6,323.40 | 1.00 | 4,684.00 | 1.00 | 4,684.00 | 1.50 | 7,026.00 |
| 0066 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,275.00 | 1,275.00 | 1,250.00 | 1,250.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 |
| 0067 | NS-MSC-00120 | Drainage Structure (SPECIAL DETAIL PG-DRAIN01) | 2 | EACH | 3,000.00 | 6,000.00 | 5,000.00 | 10,000.00 | 6,000.00 | 12,000.00 | 2,400.00 | 4,800.00 |
| CONTRACTOR TOTAL | 708,583.94 | 845,000.00 | 987,284.85 | 993,700.04 | ||||||||