Bid Tabulations
Letting of
08/04/2010
LA DOTD Headquarters
| Lead Project: 005-10-0039-R1 | |
| Parish: Jefferson | |
| Routes: US 90 | |
| Description: ST. CHARLES PARISH LINE - SW END OF THE OVERPASS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $4,200,851.57 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $3,995,253.58 |
| 2 | 06276 | Barriere Construction Co., LLC | $4,006,180.70 |
| 3 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $4,967,825.93 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $5,875,889.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Barriere Construction Co., LLC |
- 3 - F.G. Sullivan, Jr. Contractor LLC |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 971 | LNFT | 5.00 | 4,855.00 | 2.00 | 1,942.00 | 6.00 | 5,826.00 | 8.00 | 7,768.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 729 | CUYD | 20.00 | 14,580.00 | 15.00 | 10,935.00 | 30.00 | 21,870.00 | 40.00 | 29,160.00 |
| 0003 | 203-08-00100 | Geotextile Fabric | 98 | SQYD | 2.00 | 196.00 | 2.00 | 196.00 | 4.00 | 392.00 | 20.00 | 1,960.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 28,453.5 | TON | 78.00 | 2,219,373.00 | 72.00 | 2,048,652.00 | 85.00 | 2,418,547.50 | 95.00 | 2,703,082.50 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 134.6 | TON | 200.00 | 26,920.00 | 190.00 | 25,574.00 | 85.00 | 11,441.00 | 250.00 | 33,650.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 245,444 | SQYD | 1.20 | 294,532.80 | 1.50 | 368,166.00 | 3.00 | 736,332.00 | 4.00 | 981,776.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -10,227 | CUYD | 0.01 | -102.27 | 10.00 | -102,270.00 | 0.01 | -102.27 | 5.00 | -51,135.00 |
| 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 272 | SQYD | 35.00 | 9,520.00 | 50.00 | 13,600.00 | 75.00 | 20,400.00 | 75.00 | 20,400.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 40.00 | 60,000.00 | 90.00 | 135,000.00 | 100.00 | 150,000.00 | 120.00 | 180,000.00 |
| 0010 | 510-02-00100 | Pavement Widening | 5,300 | SQYD | 48.50 | 257,050.00 | 65.00 | 344,500.00 | 60.00 | 318,000.00 | 85.00 | 450,500.00 |
| 0011 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 2 | LNFT | 500.00 | 1,000.00 | 1,350.00 | 2,700.00 | 250.00 | 500.00 | 1,000.00 | 2,000.00 |
| 0012 | 701-14-00100 | Cleaning Existing Pipes | 2,000 | LNFT | 10.00 | 20,000.00 | 6.00 | 12,000.00 | 15.00 | 30,000.00 | 12.50 | 25,000.00 |
| 0013 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 310 | LNFT | 30.00 | 9,300.00 | 20.00 | 6,200.00 | 32.00 | 9,920.00 | 33.00 | 10,230.00 |
| 0014 | 704-03-00100 | Blocked Out Guard Rail | 406.3 | LNFT | 20.00 | 8,126.00 | 20.00 | 8,126.00 | 19.00 | 7,719.70 | 22.00 | 8,938.60 |
| 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 125 | LNFT | 60.00 | 7,500.00 | 65.00 | 8,125.00 | 55.00 | 6,875.00 | 71.50 | 8,937.50 |
| 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 5 | EACH | 2,250.00 | 11,250.00 | 1,900.00 | 9,500.00 | 2,250.00 | 11,250.00 | 2,450.00 | 12,250.00 |
| 0017 | 707-03-00100 | Combination Concrete Curb and Gutter | 100 | LNFT | 50.00 | 5,000.00 | 44.00 | 4,400.00 | 45.00 | 4,500.00 | 100.00 | 10,000.00 |
| 0018 | 707-04-00100 | Asphaltic Curb | 880 | LNFT | 10.00 | 8,800.00 | 26.00 | 22,880.00 | 45.00 | 39,600.00 | 17.00 | 14,960.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 225,000.00 | 225,000.00 | 245,000.00 | 245,000.00 | 300,000.00 | 300,000.00 |
| 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 4,080 | LNFT | 0.25 | 1,020.00 | 0.10 | 408.00 | 0.25 | 1,020.00 | 0.30 | 1,224.00 |
| 0021 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 800 | LNFT | 0.50 | 400.00 | 0.20 | 160.00 | 0.45 | 360.00 | 0.40 | 320.00 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 5,793 | LNFT | 0.75 | 4,344.75 | 0.40 | 2,317.20 | 0.70 | 4,055.10 | 0.90 | 5,213.70 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 23.6 | MILE | 400.00 | 9,440.00 | 150.00 | 3,540.00 | 500.00 | 11,800.00 | 600.00 | 14,160.00 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.6 | MILE | 1.00 | 25.60 | 150.00 | 3,840.00 | 425.00 | 10,880.00 | 360.00 | 9,216.00 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 51.2 | MILE | 1.00 | 51.20 | 175.00 | 8,960.00 | 600.00 | 30,720.00 | 400.00 | 20,480.00 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 100 | EACH | 50.00 | 5,000.00 | 5.00 | 500.00 | 65.00 | 6,500.00 | 50.00 | 5,000.00 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 50.00 | 1,200.00 | 5.00 | 120.00 | 65.00 | 1,560.00 | 50.00 | 1,200.00 |
| 0028 | 726-01-00100 | Bedding Material | 8.1 | CUYD | 150.00 | 1,215.00 | 300.00 | 2,430.00 | 100.00 | 810.00 | 100.00 | 810.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 415,000.00 | 415,000.00 | 400,000.00 | 400,000.00 | 225,000.00 | 225,000.00 | 550,000.00 | 550,000.00 |
| 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 44 | EACH | 75.00 | 3,300.00 | 80.00 | 3,520.00 | 65.00 | 2,860.00 | 72.00 | 3,168.00 |
| 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 5 | EACH | 110.00 | 550.00 | 115.00 | 575.00 | 75.00 | 375.00 | 94.00 | 470.00 |
| 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,392 | EACH | 5.25 | 17,808.00 | 5.00 | 16,960.00 | 4.90 | 16,620.80 | 6.00 | 20,352.00 |
| 0033 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,480 | LNFT | 1.50 | 5,220.00 | 0.85 | 2,958.00 | 0.80 | 2,784.00 | 1.50 | 5,220.00 |
| 0034 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 400 | LNFT | 2.50 | 1,000.00 | 1.50 | 600.00 | 1.45 | 580.00 | 4.00 | 1,600.00 |
| 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 3,213 | LNFT | 4.50 | 14,458.50 | 3.00 | 9,639.00 | 2.70 | 8,675.10 | 6.00 | 19,278.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.6 | MILE | 2,400.00 | 61,440.00 | 2,300.00 | 58,880.00 | 2,200.00 | 56,320.00 | 2,600.00 | 66,560.00 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.8 | MILE | 850.00 | 10,880.00 | 800.00 | 10,240.00 | 800.00 | 10,240.00 | 900.00 | 11,520.00 |
| 0038 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 200.00 | 400.00 | 175.00 | 350.00 | 150.00 | 300.00 | 230.00 | 460.00 |
| 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 36 | EACH | 220.00 | 7,920.00 | 175.00 | 6,300.00 | 150.00 | 5,400.00 | 240.00 | 8,640.00 |
| 0040 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 12 | EACH | 220.00 | 2,640.00 | 175.00 | 2,100.00 | 150.00 | 1,800.00 | 240.00 | 2,880.00 |
| 0041 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 12 | EACH | 225.00 | 2,700.00 | 180.00 | 2,160.00 | 170.00 | 2,040.00 | 250.00 | 3,000.00 |
| 0042 | 736-09-00100 | Loop Detector | 500 | LNFT | 15.00 | 7,500.00 | 15.00 | 7,500.00 | 16.00 | 8,000.00 | 20.00 | 10,000.00 |
| 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 27,500.00 | 27,500.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 10,000.00 | 10,000.00 |
| 0044 | 805-12-32020 | Reinforced Concrete Box Culverts (4' x 3') (Extension) | 14 | LNFT | 800.00 | 11,200.00 | 3,800.00 | 53,200.00 | 850.00 | 11,900.00 | 1,500.00 | 21,000.00 |
| 0045 | 805-12-33020 | Reinforced Concrete Box Culverts (5' x 4') (Extension) | 28.5 | LNFT | 800.00 | 22,800.00 | 2,075.00 | 59,137.50 | 750.00 | 21,375.00 | 1,600.00 | 45,600.00 |
| 0046 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 12 | LNFT | 1,000.00 | 12,000.00 | 3,875.00 | 46,500.00 | 775.00 | 9,300.00 | 1,620.00 | 19,440.00 |
| 0047 | NS-400-00005 | Ultra-Thin Whitetopping Patching [(4 in) Thick] | 602 | CUYD | 450.00 | 270,900.00 | 220.00 | 132,440.00 | 700.00 | 421,400.00 | 440.00 | 264,880.00 |
| 0048 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 11.8 | MILE | 800.00 | 9,440.00 | 900.00 | 10,620.00 | 600.00 | 7,080.00 | 400.00 | 4,720.00 |
| CONTRACTOR TOTAL | 3,995,253.58 | 4,006,180.70 | 4,967,825.93 | 5,875,889.30 | ||||||||