Bid Tabulations
Letting of
06/30/2010
LA DOTD Headquarters
| Lead Project: 005-08-0052 | |
| Parish: St. Charles | |
| Routes: US 90 | |
| Description: US 90 (E. END OF BAYOU DES ALLEMANDS BRIDGE -- LA 52) | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $6,197,668.72 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $5,200,000.10 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $5,432,344.38 |
| 3 | 06487 | Huey Stockstill, Inc. | $6,343,321.60 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $7,265,363.10 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - Huey Stockstill, Inc. |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,035 | CUYD | 15.00 | 30,525.00 | 15.00 | 30,525.00 | 20.00 | 40,700.00 | 35.00 | 71,225.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 41,040.6 | TON | 75.00 | 3,078,045.00 | 81.00 | 3,324,288.60 | 90.00 | 3,693,654.00 | 90.00 | 3,693,654.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 908.6 | TON | 155.00 | 140,833.00 | 85.00 | 77,231.00 | 210.00 | 190,806.00 | 140.00 | 127,204.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 368,074 | SQYD | 2.00 | 736,148.00 | 1.10 | 404,881.40 | 2.00 | 736,148.00 | 4.00 | 1,472,296.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -15,337.1 | CUYD | 15.00 | -230,056.50 | 0.01 | -153.37 | 20.00 | -306,742.00 | 10.00 | -153,371.00 |
| 0006 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 800 | SQYD | 51.00 | 40,800.00 | 65.00 | 52,000.00 | 83.00 | 66,400.00 | 80.00 | 64,000.00 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 80.00 | 120,000.00 | 75.00 | 112,500.00 | 100.00 | 150,000.00 | 150.00 | 225,000.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 220,000.00 | 220,000.00 | 190,000.00 | 190,000.00 | 390,000.00 | 390,000.00 | 150,000.00 | 150,000.00 |
| 0009 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,745 | LNFT | 0.60 | 1,047.00 | 0.75 | 1,308.75 | 0.60 | 1,047.00 | 0.80 | 1,396.00 |
| 0010 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 32.86 | MILE | 250.00 | 8,215.00 | 400.00 | 13,144.00 | 300.00 | 9,858.00 | 700.00 | 23,002.00 |
| 0011 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 32.86 | MILE | 300.00 | 9,858.00 | 300.00 | 9,858.00 | 300.00 | 9,858.00 | 330.00 | 10,843.80 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 66.01 | MILE | 350.00 | 23,103.50 | 400.00 | 26,404.00 | 400.00 | 26,404.00 | 440.00 | 29,044.40 |
| 0013 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 10 | EACH | 25.00 | 250.00 | 50.00 | 500.00 | 45.00 | 450.00 | 50.00 | 500.00 |
| 0014 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 7 | EACH | 25.00 | 175.00 | 100.00 | 700.00 | 110.00 | 770.00 | 110.00 | 770.00 |
| 0015 | 717-01-00100 | Seeding | 349 | LB | 10.00 | 3,490.00 | 12.50 | 4,362.50 | 12.00 | 4,188.00 | 13.00 | 4,537.00 |
| 0016 | 718-01-00100 | Fertilizer | 11,611 | LB | 0.40 | 4,644.40 | 0.65 | 7,547.15 | 0.60 | 6,966.60 | 0.50 | 5,805.50 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | 535,000.00 | 535,000.00 | 600,000.00 | 600,000.00 | 700,000.00 | 700,000.00 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,667 | EACH | 5.00 | 18,335.00 | 5.00 | 18,335.00 | 5.50 | 20,168.50 | 5.50 | 20,168.50 |
| 0019 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,097 | LNFT | 3.00 | 3,291.00 | 4.50 | 4,936.50 | 5.00 | 5,485.00 | 5.00 | 5,485.00 |
| 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 33.07 | MILE | 2,300.00 | 76,061.00 | 2,500.00 | 82,675.00 | 2,700.00 | 89,289.00 | 2,800.00 | 92,596.00 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 16.43 | MILE | 900.00 | 14,787.00 | 800.00 | 13,144.00 | 900.00 | 14,787.00 | 880.00 | 14,458.40 |
| 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 175.00 | 2,275.00 | 215.00 | 2,795.00 | 250.00 | 3,250.00 | 240.00 | 3,120.00 |
| 0023 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 7 | EACH | 450.00 | 3,150.00 | 400.00 | 2,800.00 | 450.00 | 3,150.00 | 440.00 | 3,080.00 |
| 0024 | 735-01-00100 | Mailboxes | 31 | EACH | 6.00 | 186.00 | 15.00 | 465.00 | 5.00 | 155.00 | 7.00 | 217.00 |
| 0025 | 735-02-00100 | Mailbox Supports (Single) | 29 | EACH | 150.00 | 4,350.00 | 150.00 | 4,350.00 | 140.00 | 4,060.00 | 150.00 | 4,350.00 |
| 0026 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 225.00 | 225.00 | 260.00 | 260.00 | 250.00 | 250.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 52,500.00 | 52,500.00 | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 |
| 0028 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 13,000.00 | 26,000.00 | 20,000.00 | 40,000.00 | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 |
| 0029 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 31.6 | MILE | 950.00 | 30,020.00 | 600.00 | 18,960.00 | 500.00 | 15,800.00 | 450.00 | 14,220.00 |
| 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 6,600 | LNFT | 0.10 | 660.00 | 0.25 | 1,650.00 | 0.20 | 1,320.00 | 0.25 | 1,650.00 |
| 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,865 | LNFT | 1.00 | 3,865.00 | 1.50 | 5,797.50 | 1.40 | 5,411.00 | 1.50 | 5,797.50 |
| 0032 | 202-02-14500 | Removal of Guard Rail | 451 | LNFT | 9.00 | 4,059.00 | 10.00 | 4,510.00 | 8.00 | 3,608.00 | 9.00 | 4,059.00 |
| 0033 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,078 | SQYD | 30.00 | 62,340.00 | 5.00 | 10,390.00 | 20.00 | 41,560.00 | 15.00 | 31,170.00 |
| 0034 | 203-08-00100 | Geotextile Fabric | 4 | SQYD | 20.00 | 80.00 | 100.00 | 400.00 | 50.00 | 200.00 | 20.00 | 80.00 |
| 0035 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 167.5 | LNFT | 58.00 | 9,715.00 | 60.00 | 10,050.00 | 60.00 | 10,050.00 | 64.00 | 10,720.00 |
| 0036 | 704-03-00100 | Blocked Out Guard Rail | 356.25 | LNFT | 22.00 | 7,837.50 | 25.00 | 8,906.25 | 22.00 | 7,837.50 | 22.00 | 7,837.50 |
| 0037 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 85.00 | 1,062.50 | 125.00 | 1,562.50 | 120.00 | 1,500.00 | 93.00 | 1,162.50 |
| 0038 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 50.00 | 2,500.00 | 50.00 | 2,500.00 | 40.00 | 2,000.00 | 50.00 | 2,500.00 |
| 0039 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 65.00 | 3,250.00 | 70.00 | 3,500.00 | 60.00 | 3,000.00 | 66.00 | 3,300.00 |
| 0040 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,500.00 | 10,000.00 | 2,400.00 | 9,600.00 | 2,600.00 | 10,400.00 |
| 0041 | 706-04-00100 | Handicapped Curb Ramps | 8 | EACH | 2,150.00 | 17,200.00 | 2,500.00 | 20,000.00 | 1,000.00 | 8,000.00 | 2,600.00 | 20,800.00 |
| 0042 | 726-01-00100 | Bedding Material | 3.5 | CUYD | 254.00 | 889.00 | 150.00 | 525.00 | 160.00 | 560.00 | 150.00 | 525.00 |
| 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 85.00 | 510.00 | 80.00 | 480.00 | 80.00 | 480.00 | 95.00 | 570.00 |
| 0044 | 805-12-33000 | Reinforced Concrete Box Culverts (4' x 4') (Extension) | 5 | LNFT | 6,400.00 | 32,000.00 | 1,000.00 | 5,000.00 | 1,000.00 | 5,000.00 | 2,000.00 | 10,000.00 |
| 0045 | 202-03-38000 | Relocation of Sign Sts. 424+22 and Sta. 426+15 | 2 | EACH | 427.00 | 854.00 | 1,500.00 | 3,000.00 | 4,000.00 | 8,000.00 | 5,000.00 | 10,000.00 |
| 0046 | 203-04-00100 | Nonplastic Embankment | 130 | CUYD | 75.00 | 9,750.00 | 40.00 | 5,200.00 | 40.00 | 5,200.00 | 50.00 | 6,500.00 |
| 0047 | 510-02-00100 | Pavement Widening | 4,885.1 | SQYD | 57.00 | 278,450.70 | 56.00 | 273,565.60 | 80.00 | 390,808.00 | 100.00 | 488,510.00 |
| 0048 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 11 | LNFT | 300.00 | 3,300.00 | 500.00 | 5,500.00 | 125.00 | 1,375.00 | 250.00 | 2,750.00 |
| 0049 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 5,000.00 | 10,000.00 | 4,500.00 | 9,000.00 | 3,500.00 | 7,000.00 | 5,000.00 | 10,000.00 |
| 0050 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 2,400.00 | 4,800.00 | 2,500.00 | 5,000.00 | 2,000.00 | 4,000.00 | 5,000.00 | 10,000.00 |
| 0051 | 202-02-06140 | Removal of Curbs (Concrete) | 165 | LNFT | 13.00 | 2,145.00 | 25.00 | 4,125.00 | 12.00 | 1,980.00 | 12.00 | 1,980.00 |
| 0052 | 707-01-00200 | Concrete Curb (Barrier) | 160 | LNFT | 30.00 | 4,800.00 | 65.00 | 10,400.00 | 12.00 | 1,920.00 | 70.00 | 11,200.00 |
| CONTRACTOR TOTAL | 5,200,000.10 | 5,432,344.38 | 6,343,321.60 | 7,265,363.10 | ||||||||