Bid Tabulations
Letting of
05/19/2010
LA DOTD Headquarters
| Lead Project: 004-03-0009 | |
| Parish: Iberia, St. Martin | |
| Routes: LA 182, LA 347, LA 96, LA 677 | |
| Description: DISTRICT 03 EMERGENCY REPAIR PROJECT - FUNCTIONAL OVERLAYS | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $2,108,943.41 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,876,932.08 |
| 2 | 04089 | H & S Construction Co., Inc. | $2,063,778.01 |
| 3 | 13086 | M. Matt Durand, LLC | $2,261,105.23 |
| 4 | 51821 | Elliott Construction, LLC | $2,274,396.73 |
| 5 | 33663 | Glenn Lege Construction Inc | $2,342,226.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - H & S Construction Co., Inc. |
- 3 - M. Matt Durand, LLC |
- 4 - Elliott Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,135 | CUYD | 81.00 | 91,935.00 | 20.82 | 23,630.70 | 91.00 | 103,285.00 | 13.00 | 14,755.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 17,027.2 | TON | 69.50 | 1,183,390.40 | 81.93 | 1,395,038.50 | 88.00 | 1,498,393.60 | 80.00 | 1,362,176.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 460.6 | TON | 115.75 | 53,314.45 | 154.65 | 71,231.79 | 120.00 | 55,272.00 | 132.00 | 60,799.20 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 121,304 | SQYD | 1.30 | 157,695.20 | 1.10 | 133,434.40 | 1.20 | 145,564.80 | 0.80 | 97,043.20 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,054 | CUYD | 0.10 | -505.40 | 0.01 | -50.54 | 0.01 | -50.54 | 0.01 | -50.54 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,750 | SQYD | 62.00 | 108,500.00 | 106.14 | 185,745.00 | 85.00 | 148,750.00 | 90.00 | 157,500.00 |
| 0007 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 706.00 | 3,530.00 | 294.33 | 1,471.65 | 164.00 | 820.00 | 150.00 | 750.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 10,246.23 | 10,246.23 | 32,000.00 | 32,000.00 | 197,000.00 | 197,000.00 |
| 0009 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,120 | LNFT | 0.20 | 224.00 | 0.24 | 268.80 | 0.45 | 504.00 | 0.21 | 235.20 |
| 0010 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,862 | LNFT | 0.60 | 1,717.20 | 0.81 | 2,318.22 | 1.10 | 3,148.20 | 0.63 | 1,803.06 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.466 | MILE | 139.00 | 2,566.77 | 378.76 | 6,994.18 | 572.00 | 10,562.55 | 420.00 | 7,755.72 |
| 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.77 | MILE | 303.00 | 4,172.31 | 513.73 | 7,074.06 | 572.00 | 7,876.44 | 315.00 | 4,337.55 |
| 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 53.839 | MILE | 607.00 | 32,680.27 | 595.83 | 32,078.89 | 1,005.00 | 54,108.20 | 630.00 | 33,918.57 |
| 0014 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 28 | EACH | 60.00 | 1,680.00 | 54.16 | 1,516.48 | 57.00 | 1,596.00 | 52.50 | 1,470.00 |
| 0015 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 202.00 | 808.00 | 86.65 | 346.60 | 114.00 | 456.00 | 210.00 | 840.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 43,499.69 | 43,499.69 | 21,900.00 | 21,900.00 | 210,000.00 | 210,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,480 | EACH | 4.55 | 11,284.00 | 5.69 | 14,111.20 | 5.70 | 14,136.00 | 4.73 | 11,730.40 |
| 0018 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 560 | LNFT | 1.00 | 560.00 | 1.46 | 817.60 | 1.15 | 644.00 | 1.05 | 588.00 |
| 0019 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,431 | LNFT | 3.00 | 4,293.00 | 4.87 | 6,968.97 | 3.50 | 5,008.50 | 3.15 | 4,507.65 |
| 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 30.542 | MILE | 2,200.00 | 67,192.40 | 2,704.94 | 82,614.28 | 2,833.00 | 86,525.49 | 2,310.00 | 70,552.02 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.668 | MILE | 607.00 | 4,654.48 | 917.28 | 7,033.70 | 994.00 | 7,621.99 | 525.00 | 4,025.70 |
| 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 200.00 | 2,800.00 | 232.87 | 3,260.18 | 200.00 | 2,800.00 | 210.00 | 2,940.00 |
| 0023 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 200.00 | 1,000.00 | 243.70 | 1,218.50 | 223.00 | 1,115.00 | 210.00 | 1,050.00 |
| 0024 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 400.00 | 800.00 | 324.94 | 649.88 | 480.00 | 960.00 | 420.00 | 840.00 |
| 0025 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 400.00 | 1,600.00 | 433.25 | 1,733.01 | 457.00 | 1,828.00 | 420.00 | 1,680.00 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,700.00 | 10,700.00 | 4,455.16 | 4,455.16 | 18,000.00 | 18,000.00 | 5,000.00 | 5,000.00 |
| 0027 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 670.00 | 1,340.00 | 294.34 | 588.68 | 140.00 | 280.00 | 75.00 | 150.00 |
| 0028 | NS-500-00280 | Surface Preparation | 1 | LUMP | 33,000.00 | 33,000.00 | 25,482.20 | 25,482.20 | 38,000.00 | 38,000.00 | 21,000.00 | 21,000.00 |
| CONTRACTOR TOTAL | 1,876,932.08 | 2,063,778.01 | 2,261,105.23 | 2,274,396.73 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Glenn Lege Construction Inc |
|
| Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,135 | CUYD | 20.00 | 22,700.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 17,027.2 | TON | 93.00 | 1,583,529.60 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 460.6 | TON | 115.00 | 52,969.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 121,304 | SQYD | 1.50 | 181,956.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -5,054 | CUYD | 1.00 | -5,054.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,750 | SQYD | 87.00 | 152,250.00 |
| 0007 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 300.00 | 1,500.00 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 |
| 0009 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,120 | LNFT | 0.25 | 280.00 |
| 0010 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,862 | LNFT | 1.00 | 2,862.00 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.466 | MILE | 680.00 | 12,556.88 |
| 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 13.77 | MILE | 350.00 | 4,819.50 |
| 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 53.839 | MILE | 700.00 | 37,687.30 |
| 0014 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 28 | EACH | 60.00 | 1,680.00 |
| 0015 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 235.00 | 940.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,480 | EACH | 5.25 | 13,020.00 |
| 0018 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 560 | LNFT | 1.20 | 672.00 |
| 0019 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,431 | LNFT | 3.50 | 5,008.50 |
| 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 30.542 | MILE | 2,560.00 | 78,187.52 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.668 | MILE | 700.00 | 5,367.60 |
| 0022 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 235.00 | 3,290.00 |
| 0023 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 235.00 | 1,175.00 |
| 0024 | 732-04-16000 | Plastic Pavement Legends and Symbols (Pedestrian Crossing) | 2 | EACH | 465.00 | 930.00 |
| 0025 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 465.00 | 1,860.00 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,590.00 | 7,590.00 |
| 0027 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 225.00 | 450.00 |
| 0028 | NS-500-00280 | Surface Preparation | 1 | LUMP | 12,000.00 | 12,000.00 |
| CONTRACTOR TOTAL | 2,342,226.90 | |||||