LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 003-11-0035
Parish: Lafayette
Routes: LA 182, LA 182, US 90
Description: N. UNIVERSITY (LA 182) @ CAMERON (US 90) INT IMP.; ETC.
Type Const: GRADING, CLASS II BC, IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE LAYER, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING AND WIDENING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost: $3,877,501.10


RankLicenseBidderConstruction Bid
1 12487 Diamond B Construction Co., L.L.C. $3,293,509.00
2 33663 Glenn Lege Construction Inc $3,446,343.48
3 04089 H & S Construction Co., Inc. $3,572,921.45
4 12312 Gilchrist Construction Co. LLC $3,814,043.46
5 51821 Elliott Construction, LLC $3,953,325.01
6 34356 Prairie Contractors Inc. $5,168,719.50


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Glenn Lege Construction Inc
- 3 -
H & S Construction Co., Inc.
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 729      SQYD 15.00 10,935.00 5.50 4,009.50 24.75 18,042.75 8.00 5,832.00
0002 202-02-14500 Removal of Guard Rail 424      LNFT 1.00 424.00 1.00 424.00 11.00 4,664.00 8.00 3,392.00
0003 203-01-00100 General Excavation 830      CUYD 11.25 9,337.50 6.50 5,395.00 8.00 6,640.00 10.00 8,300.00
0004 203-07-00100 Borrow (Vehicular Measurement) 880      CUYD 20.00 17,600.00 12.00 10,560.00 11.25 9,900.00 22.00 19,360.00
0005 302-02-05020 Class II Base Course (10" Thick) (Soil Cement) 3,248.8    SQYD 20.00 64,976.00 8.70 28,264.56 14.45 46,945.16 25.00 81,220.00
0006 303-01-00300 In-Place Cement Stabilzed Base Course (10" Thick) 24,316      SQYD 6.75 164,133.00 6.00 145,896.00 7.80 189,664.80 10.50 255,318.00
0007 305-01-03000 Subgrade Layer (10" Thick) 28,498      SQYD 7.15 203,760.70 7.85 223,709.30 7.40 210,885.20 5.95 169,563.10
0008 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 525      CUYD 15.75 8,268.75 19.00 9,975.00 24.35 12,783.75 65.00 34,125.00
0009 502-01-00100 Superpave Asphaltic Concrete 25,366.6    TON 76.00 1,927,861.60 84.30 2,138,404.38 84.31 2,138,658.05 86.50 2,194,210.90
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,228.8    TON 140.00 172,032.00 105.00 129,024.00 120.00 147,456.00 135.00 165,888.00
0011 509-01-00100 Cold Planing Asphaltic Pavement 62,662      SQYD 2.00 125,324.00 1.60 100,259.20 2.05 128,457.10 1.70 106,525.40
0012 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,825      CUYD 0.10 -482.50 0.01 -48.25 0.01 -48.25 0.10 -482.50
0013 510-01-00200 Pavement Patching (12" Minimum Thickness) 1,500      SQYD 75.00 112,500.00 100.00 150,000.00 83.00 124,500.00 101.00 151,500.00
0014 510-02-00100 Pavement Widening 933.3    SQYD 39.00 36,398.70 84.00 78,397.20 68.00 63,464.40 98.00 91,463.40
0015 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 125      LNFT 28.00 3,500.00 30.00 3,750.00 49.50 6,187.50 28.00 3,500.00
0016 704-03-00100 Blocked Out Guard Rail 75      LNFT 18.00 1,350.00 20.00 1,500.00 21.00 1,575.00 19.00 1,425.00
0017 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,500.00 10,000.00 2,665.00 10,660.00 2,475.00 9,900.00 2,600.00 10,400.00
0018 706-02-00200 Concrete Drive (6" Thick) 125      SQYD 76.00 9,500.00 43.00 5,375.00 84.50 10,562.50 70.00 8,750.00
0019 713-01-00100 Temporary Signs and Barricades 1      LUMP 17,000.00 17,000.00 38,300.00 38,300.00 50,750.00 50,750.00 22,000.00 22,000.00
0020 713-02-00100 Temporary Pavement Markings (4" Width) 5,020      LNFT 0.10 502.00 0.12 602.40 0.14 702.80 0.11 552.20
0021 713-02-00300 Temporary Pavement Markings (8" Width) 10,268      LNFT 0.20 2,053.60 0.22 2,258.96 0.25 2,567.00 0.22 2,258.96
0022 713-02-00500 Temporary Pavement Markings (24" Width) 1,608      LNFT 0.90 1,447.20 1.00 1,608.00 0.85 1,366.80 1.00 1,608.00
0023 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 25.416  MILE 145.00 3,685.32 600.00 15,249.60 326.00 8,285.62 250.00 6,354.00
0024 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 21.982  MILE 250.00 5,495.50 280.00 6,154.96 523.00 11,496.59 250.00 5,495.50
0025 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 63.508  MILE 560.00 35,564.48 610.00 38,739.88 605.00 38,422.34 250.00 15,877.00
0026 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 144      EACH 51.00 7,344.00 55.50 7,992.00 49.50 7,128.00 60.00 8,640.00
0027 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 44      EACH 51.00 2,244.00 55.50 2,442.00 49.50 2,178.00 60.00 2,640.00
0028 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 15,000.00 15,000.00 5,000.00 5,000.00 9,755.00 9,755.00 6,000.00 6,000.00
0029 727-01-00100 Mobilization 1      LUMP 83,400.00 83,400.00 56,000.00 56,000.00 44,550.00 44,550.00 150,000.00 150,000.00
0030 731-02-00100 Reflectorized Raised Pavement Markers 2,720      EACH 5.00 13,600.00 5.30 14,416.00 5.80 15,776.00 5.20 14,144.00
0031 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 2,510      LNFT 0.50 1,255.00 0.55 1,380.50 0.55 1,380.50 0.50 1,255.00
0032 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 5,134      LNFT 1.00 5,134.00 1.00 5,134.00 1.50 7,701.00 1.00 5,134.00
0033 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 704      LNFT 3.00 2,112.00 3.35 2,358.40 5.00 3,520.00 3.25 2,288.00
0034 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 350      LNFT 3.00 1,050.00 3.40 1,190.00 5.00 1,750.00 3.25 1,137.50
0035 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.754  MILE 2,500.00 79,385.00 2,665.00 84,624.41 2,750.00 87,323.50 2,600.00 82,560.40
0036 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 10.991  MILE 650.00 7,144.15 725.00 7,968.48 935.00 10,276.59 700.00 7,693.70
0037 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 101      EACH 180.00 18,180.00 200.00 20,200.00 236.50 23,886.50 195.00 19,695.00
0038 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 14      EACH 180.00 2,520.00 200.00 2,800.00 236.50 3,311.00 195.00 2,730.00
0039 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 38      EACH 190.00 7,220.00 210.00 7,980.00 247.50 9,405.00 200.00 7,600.00
0040 735-01-00100 Mailboxes 194      EACH 1.00 194.00 1.00 194.00 6.60 1,280.40 1.15 223.10
0041 735-02-00100 Mailbox Supports (Single) 155      EACH 115.00 17,825.00 125.00 19,375.00 158.00 24,490.00 125.00 19,375.00
0042 735-03-00100 Mailbox Supports (Double) 11      EACH 175.00 1,925.00 190.00 2,090.00 273.25 3,005.75 185.00 2,035.00
0043 735-04-00100 Mailbox Supports (Multiple) 6      EACH 325.00 1,950.00 355.00 2,130.00 475.25 2,851.50 350.00 2,100.00
0044 740-01-00100 Construction Layout 1      LUMP 5,500.00 5,500.00 6,672.00 6,672.00 13,755.00 13,755.00 15,000.00 15,000.00
0045 NS-500-00280 Surface Preparation 1      LUMP 47,000.00 47,000.00 15,260.00 15,260.00 40,385.00 40,385.00 65,000.00 65,000.00
0046 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 3,112      INLF 5.00 15,560.00 1.50 4,668.00 1.55 4,823.60 1.40 4,356.80
0047 NS-713-00001 Dynamic Message Sign Unit 2      EACH 7,400.00 14,800.00 14,000.00 28,000.00 5,280.00 10,560.00 15,000.00 30,000.00
                         
    CONTRACTOR TOTAL       3,293,509.00   3,446,343.48   3,572,921.45   3,814,043.46



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Elliott Construction, LLC
- 6 -
Prairie Contractors Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 729      SQYD 11.00 8,019.00 15.00 10,935.00
0002 202-02-14500 Removal of Guard Rail 424      LNFT 2.15 911.60 20.00 8,480.00
0003 203-01-00100 General Excavation 830      CUYD 17.50 14,525.00 15.00 12,450.00
0004 203-07-00100 Borrow (Vehicular Measurement) 880      CUYD 22.50 19,800.00 30.00 26,400.00
0005 302-02-05020 Class II Base Course (10" Thick) (Soil Cement) 3,248.8    SQYD 13.00 42,234.40 25.00 81,220.00
0006 303-01-00300 In-Place Cement Stabilzed Base Course (10" Thick) 24,316      SQYD 6.75 164,133.00 19.00 462,004.00
0007 305-01-03000 Subgrade Layer (10" Thick) 28,498      SQYD 6.80 193,786.40 19.00 541,462.00
0008 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 525      CUYD 40.00 21,000.00 40.00 21,000.00
0009 502-01-00100 Superpave Asphaltic Concrete 25,366.6    TON 89.00 2,257,627.40 92.00 2,333,727.20
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,228.8    TON 125.00 153,600.00 50.00 61,440.00
0011 509-01-00100 Cold Planing Asphaltic Pavement 62,662      SQYD 1.70 106,525.40 3.50 219,317.00
0012 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,825      CUYD 0.01 -48.25 48.00 -231,600.00
0013 510-01-00200 Pavement Patching (12" Minimum Thickness) 1,500      SQYD 202.00 303,000.00 100.00 150,000.00
0014 510-02-00100 Pavement Widening 933.3    SQYD 90.00 83,997.00 65.00 60,664.50
0015 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 125      LNFT 30.00 3,750.00 50.00 6,250.00
0016 704-03-00100 Blocked Out Guard Rail 75      LNFT 19.50 1,462.50 50.00 3,750.00
0017 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,592.00 10,368.00 4,000.00 16,000.00
0018 706-02-00200 Concrete Drive (6" Thick) 125      SQYD 63.00 7,875.00 100.00 12,500.00
0019 713-01-00100 Temporary Signs and Barricades 1      LUMP 90,000.00 90,000.00 200,000.00 200,000.00
0020 713-02-00100 Temporary Pavement Markings (4" Width) 5,020      LNFT 0.14 702.80 0.50 2,510.00
0021 713-02-00300 Temporary Pavement Markings (8" Width) 10,268      LNFT 0.24 2,464.32 0.50 5,134.00
0022 713-02-00500 Temporary Pavement Markings (24" Width) 1,608      LNFT 0.81 1,302.48 1.25 2,010.00
0023 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 25.416  MILE 420.00 10,674.72 500.00 12,708.00
0024 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 21.982  MILE 513.00 11,276.77 600.00 13,189.20
0025 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 63.508  MILE 594.00 37,723.75 700.00 44,455.60
0026 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 144      EACH 48.60 6,998.40 50.00 7,200.00
0027 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 44      EACH 48.60 2,138.40 50.00 2,200.00
0028 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 5,280.00 5,280.00 10,000.00 10,000.00
0029 727-01-00100 Mobilization 1      LUMP 110,000.00 110,000.00 600,000.00 600,000.00
0030 731-02-00100 Reflectorized Raised Pavement Markers 2,720      EACH 5.67 15,422.40 6.25 17,000.00
0031 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 2,510      LNFT 0.54 1,355.40 1.00 2,510.00
0032 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 5,134      LNFT 1.46 7,495.64 2.00 10,268.00
0033 732-01-01080 Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 704      LNFT 4.86 3,421.44 5.00 3,520.00
0034 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 350      LNFT 4.86 1,701.00 5.00 1,750.00
0035 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.754  MILE 2,700.00 85,735.80 3,000.00 95,262.00
0036 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 10.991  MILE 918.00 10,089.74 1,000.00 10,991.00
0037 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 101      EACH 232.20 23,452.20 300.00 30,300.00
0038 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 14      EACH 232.20 3,250.80 300.00 4,200.00
0039 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 38      EACH 243.00 9,234.00 325.00 12,350.00
0040 735-01-00100 Mailboxes 194      EACH 1.08 209.52 2.00 388.00
0041 735-02-00100 Mailbox Supports (Single) 155      EACH 121.50 18,832.50 150.00 23,250.00
0042 735-03-00100 Mailbox Supports (Double) 11      EACH 183.60 2,019.60 300.00 3,300.00
0043 735-04-00100 Mailbox Supports (Multiple) 6      EACH 345.60 2,073.60 500.00 3,000.00
0044 740-01-00100 Construction Layout 1      LUMP 13,000.00 13,000.00 9,000.00 9,000.00
0045 NS-500-00280 Surface Preparation 1      LUMP 69,000.00 69,000.00 200,000.00 200,000.00
0046 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 3,112      INLF 1.19 3,703.28 2.00 6,224.00
0047 NS-713-00001 Dynamic Message Sign Unit 2      EACH 6,100.00 12,200.00 20,000.00 40,000.00
                 
    CONTRACTOR TOTAL       3,953,325.01   5,168,719.50