Bid Tabulations
Letting of
03/31/2010
LA DOTD Headquarters
| Lead Project: 003-11-0035 | |
| Parish: Lafayette | |
| Routes: LA 182, LA 182, US 90 | |
| Description: N. UNIVERSITY (LA 182) @ CAMERON (US 90) INT IMP.; ETC. | |
| Type Const: GRADING, CLASS II BC, IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE LAYER, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING AND WIDENING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $3,877,501.10 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,293,509.00 |
| 2 | 33663 | Glenn Lege Construction Inc | $3,446,343.48 |
| 3 | 04089 | H & S Construction Co., Inc. | $3,572,921.45 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $3,814,043.46 |
| 5 | 51821 | Elliott Construction, LLC | $3,953,325.01 |
| 6 | 34356 | Prairie Contractors Inc. | $5,168,719.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Diamond B Construction Co., L.L.C. |
- 2 - Glenn Lege Construction Inc |
- 3 - H & S Construction Co., Inc. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 729 | SQYD | 15.00 | 10,935.00 | 5.50 | 4,009.50 | 24.75 | 18,042.75 | 8.00 | 5,832.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 424 | LNFT | 1.00 | 424.00 | 1.00 | 424.00 | 11.00 | 4,664.00 | 8.00 | 3,392.00 |
| 0003 | 203-01-00100 | General Excavation | 830 | CUYD | 11.25 | 9,337.50 | 6.50 | 5,395.00 | 8.00 | 6,640.00 | 10.00 | 8,300.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 880 | CUYD | 20.00 | 17,600.00 | 12.00 | 10,560.00 | 11.25 | 9,900.00 | 22.00 | 19,360.00 |
| 0005 | 302-02-05020 | Class II Base Course (10" Thick) (Soil Cement) | 3,248.8 | SQYD | 20.00 | 64,976.00 | 8.70 | 28,264.56 | 14.45 | 46,945.16 | 25.00 | 81,220.00 |
| 0006 | 303-01-00300 | In-Place Cement Stabilzed Base Course (10" Thick) | 24,316 | SQYD | 6.75 | 164,133.00 | 6.00 | 145,896.00 | 7.80 | 189,664.80 | 10.50 | 255,318.00 |
| 0007 | 305-01-03000 | Subgrade Layer (10" Thick) | 28,498 | SQYD | 7.15 | 203,760.70 | 7.85 | 223,709.30 | 7.40 | 210,885.20 | 5.95 | 169,563.10 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 525 | CUYD | 15.75 | 8,268.75 | 19.00 | 9,975.00 | 24.35 | 12,783.75 | 65.00 | 34,125.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 25,366.6 | TON | 76.00 | 1,927,861.60 | 84.30 | 2,138,404.38 | 84.31 | 2,138,658.05 | 86.50 | 2,194,210.90 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,228.8 | TON | 140.00 | 172,032.00 | 105.00 | 129,024.00 | 120.00 | 147,456.00 | 135.00 | 165,888.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 62,662 | SQYD | 2.00 | 125,324.00 | 1.60 | 100,259.20 | 2.05 | 128,457.10 | 1.70 | 106,525.40 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,825 | CUYD | 0.10 | -482.50 | 0.01 | -48.25 | 0.01 | -48.25 | 0.10 | -482.50 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 75.00 | 112,500.00 | 100.00 | 150,000.00 | 83.00 | 124,500.00 | 101.00 | 151,500.00 |
| 0014 | 510-02-00100 | Pavement Widening | 933.3 | SQYD | 39.00 | 36,398.70 | 84.00 | 78,397.20 | 68.00 | 63,464.40 | 98.00 | 91,463.40 |
| 0015 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 28.00 | 3,500.00 | 30.00 | 3,750.00 | 49.50 | 6,187.50 | 28.00 | 3,500.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 18.00 | 1,350.00 | 20.00 | 1,500.00 | 21.00 | 1,575.00 | 19.00 | 1,425.00 |
| 0017 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,500.00 | 10,000.00 | 2,665.00 | 10,660.00 | 2,475.00 | 9,900.00 | 2,600.00 | 10,400.00 |
| 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 125 | SQYD | 76.00 | 9,500.00 | 43.00 | 5,375.00 | 84.50 | 10,562.50 | 70.00 | 8,750.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,000.00 | 17,000.00 | 38,300.00 | 38,300.00 | 50,750.00 | 50,750.00 | 22,000.00 | 22,000.00 |
| 0020 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 5,020 | LNFT | 0.10 | 502.00 | 0.12 | 602.40 | 0.14 | 702.80 | 0.11 | 552.20 |
| 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 10,268 | LNFT | 0.20 | 2,053.60 | 0.22 | 2,258.96 | 0.25 | 2,567.00 | 0.22 | 2,258.96 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,608 | LNFT | 0.90 | 1,447.20 | 1.00 | 1,608.00 | 0.85 | 1,366.80 | 1.00 | 1,608.00 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.416 | MILE | 145.00 | 3,685.32 | 600.00 | 15,249.60 | 326.00 | 8,285.62 | 250.00 | 6,354.00 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.982 | MILE | 250.00 | 5,495.50 | 280.00 | 6,154.96 | 523.00 | 11,496.59 | 250.00 | 5,495.50 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.508 | MILE | 560.00 | 35,564.48 | 610.00 | 38,739.88 | 605.00 | 38,422.34 | 250.00 | 15,877.00 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 144 | EACH | 51.00 | 7,344.00 | 55.50 | 7,992.00 | 49.50 | 7,128.00 | 60.00 | 8,640.00 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 44 | EACH | 51.00 | 2,244.00 | 55.50 | 2,442.00 | 49.50 | 2,178.00 | 60.00 | 2,640.00 |
| 0028 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 9,755.00 | 9,755.00 | 6,000.00 | 6,000.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 83,400.00 | 83,400.00 | 56,000.00 | 56,000.00 | 44,550.00 | 44,550.00 | 150,000.00 | 150,000.00 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,720 | EACH | 5.00 | 13,600.00 | 5.30 | 14,416.00 | 5.80 | 15,776.00 | 5.20 | 14,144.00 |
| 0031 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,510 | LNFT | 0.50 | 1,255.00 | 0.55 | 1,380.50 | 0.55 | 1,380.50 | 0.50 | 1,255.00 |
| 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 5,134 | LNFT | 1.00 | 5,134.00 | 1.00 | 5,134.00 | 1.50 | 7,701.00 | 1.00 | 5,134.00 |
| 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 704 | LNFT | 3.00 | 2,112.00 | 3.35 | 2,358.40 | 5.00 | 3,520.00 | 3.25 | 2,288.00 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 350 | LNFT | 3.00 | 1,050.00 | 3.40 | 1,190.00 | 5.00 | 1,750.00 | 3.25 | 1,137.50 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 31.754 | MILE | 2,500.00 | 79,385.00 | 2,665.00 | 84,624.41 | 2,750.00 | 87,323.50 | 2,600.00 | 82,560.40 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.991 | MILE | 650.00 | 7,144.15 | 725.00 | 7,968.48 | 935.00 | 10,276.59 | 700.00 | 7,693.70 |
| 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 101 | EACH | 180.00 | 18,180.00 | 200.00 | 20,200.00 | 236.50 | 23,886.50 | 195.00 | 19,695.00 |
| 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 14 | EACH | 180.00 | 2,520.00 | 200.00 | 2,800.00 | 236.50 | 3,311.00 | 195.00 | 2,730.00 |
| 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 38 | EACH | 190.00 | 7,220.00 | 210.00 | 7,980.00 | 247.50 | 9,405.00 | 200.00 | 7,600.00 |
| 0040 | 735-01-00100 | Mailboxes | 194 | EACH | 1.00 | 194.00 | 1.00 | 194.00 | 6.60 | 1,280.40 | 1.15 | 223.10 |
| 0041 | 735-02-00100 | Mailbox Supports (Single) | 155 | EACH | 115.00 | 17,825.00 | 125.00 | 19,375.00 | 158.00 | 24,490.00 | 125.00 | 19,375.00 |
| 0042 | 735-03-00100 | Mailbox Supports (Double) | 11 | EACH | 175.00 | 1,925.00 | 190.00 | 2,090.00 | 273.25 | 3,005.75 | 185.00 | 2,035.00 |
| 0043 | 735-04-00100 | Mailbox Supports (Multiple) | 6 | EACH | 325.00 | 1,950.00 | 355.00 | 2,130.00 | 475.25 | 2,851.50 | 350.00 | 2,100.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,500.00 | 5,500.00 | 6,672.00 | 6,672.00 | 13,755.00 | 13,755.00 | 15,000.00 | 15,000.00 |
| 0045 | NS-500-00280 | Surface Preparation | 1 | LUMP | 47,000.00 | 47,000.00 | 15,260.00 | 15,260.00 | 40,385.00 | 40,385.00 | 65,000.00 | 65,000.00 |
| 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,112 | INLF | 5.00 | 15,560.00 | 1.50 | 4,668.00 | 1.55 | 4,823.60 | 1.40 | 4,356.80 |
| 0047 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 7,400.00 | 14,800.00 | 14,000.00 | 28,000.00 | 5,280.00 | 10,560.00 | 15,000.00 | 30,000.00 |
| CONTRACTOR TOTAL | 3,293,509.00 | 3,446,343.48 | 3,572,921.45 | 3,814,043.46 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Elliott Construction, LLC |
- 6 - Prairie Contractors Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 729 | SQYD | 11.00 | 8,019.00 | 15.00 | 10,935.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 424 | LNFT | 2.15 | 911.60 | 20.00 | 8,480.00 |
| 0003 | 203-01-00100 | General Excavation | 830 | CUYD | 17.50 | 14,525.00 | 15.00 | 12,450.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 880 | CUYD | 22.50 | 19,800.00 | 30.00 | 26,400.00 |
| 0005 | 302-02-05020 | Class II Base Course (10" Thick) (Soil Cement) | 3,248.8 | SQYD | 13.00 | 42,234.40 | 25.00 | 81,220.00 |
| 0006 | 303-01-00300 | In-Place Cement Stabilzed Base Course (10" Thick) | 24,316 | SQYD | 6.75 | 164,133.00 | 19.00 | 462,004.00 |
| 0007 | 305-01-03000 | Subgrade Layer (10" Thick) | 28,498 | SQYD | 6.80 | 193,786.40 | 19.00 | 541,462.00 |
| 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 525 | CUYD | 40.00 | 21,000.00 | 40.00 | 21,000.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 25,366.6 | TON | 89.00 | 2,257,627.40 | 92.00 | 2,333,727.20 |
| 0010 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,228.8 | TON | 125.00 | 153,600.00 | 50.00 | 61,440.00 |
| 0011 | 509-01-00100 | Cold Planing Asphaltic Pavement | 62,662 | SQYD | 1.70 | 106,525.40 | 3.50 | 219,317.00 |
| 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -4,825 | CUYD | 0.01 | -48.25 | 48.00 | -231,600.00 |
| 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 202.00 | 303,000.00 | 100.00 | 150,000.00 |
| 0014 | 510-02-00100 | Pavement Widening | 933.3 | SQYD | 90.00 | 83,997.00 | 65.00 | 60,664.50 |
| 0015 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 30.00 | 3,750.00 | 50.00 | 6,250.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 19.50 | 1,462.50 | 50.00 | 3,750.00 |
| 0017 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,592.00 | 10,368.00 | 4,000.00 | 16,000.00 |
| 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 125 | SQYD | 63.00 | 7,875.00 | 100.00 | 12,500.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 200,000.00 | 200,000.00 |
| 0020 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 5,020 | LNFT | 0.14 | 702.80 | 0.50 | 2,510.00 |
| 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 10,268 | LNFT | 0.24 | 2,464.32 | 0.50 | 5,134.00 |
| 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,608 | LNFT | 0.81 | 1,302.48 | 1.25 | 2,010.00 |
| 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 25.416 | MILE | 420.00 | 10,674.72 | 500.00 | 12,708.00 |
| 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.982 | MILE | 513.00 | 11,276.77 | 600.00 | 13,189.20 |
| 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 63.508 | MILE | 594.00 | 37,723.75 | 700.00 | 44,455.60 |
| 0026 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 144 | EACH | 48.60 | 6,998.40 | 50.00 | 7,200.00 |
| 0027 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 44 | EACH | 48.60 | 2,138.40 | 50.00 | 2,200.00 |
| 0028 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,280.00 | 5,280.00 | 10,000.00 | 10,000.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 600,000.00 | 600,000.00 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,720 | EACH | 5.67 | 15,422.40 | 6.25 | 17,000.00 |
| 0031 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,510 | LNFT | 0.54 | 1,355.40 | 1.00 | 2,510.00 |
| 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 5,134 | LNFT | 1.46 | 7,495.64 | 2.00 | 10,268.00 |
| 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 704 | LNFT | 4.86 | 3,421.44 | 5.00 | 3,520.00 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 350 | LNFT | 4.86 | 1,701.00 | 5.00 | 1,750.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 31.754 | MILE | 2,700.00 | 85,735.80 | 3,000.00 | 95,262.00 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 10.991 | MILE | 918.00 | 10,089.74 | 1,000.00 | 10,991.00 |
| 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 101 | EACH | 232.20 | 23,452.20 | 300.00 | 30,300.00 |
| 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 14 | EACH | 232.20 | 3,250.80 | 300.00 | 4,200.00 |
| 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 38 | EACH | 243.00 | 9,234.00 | 325.00 | 12,350.00 |
| 0040 | 735-01-00100 | Mailboxes | 194 | EACH | 1.08 | 209.52 | 2.00 | 388.00 |
| 0041 | 735-02-00100 | Mailbox Supports (Single) | 155 | EACH | 121.50 | 18,832.50 | 150.00 | 23,250.00 |
| 0042 | 735-03-00100 | Mailbox Supports (Double) | 11 | EACH | 183.60 | 2,019.60 | 300.00 | 3,300.00 |
| 0043 | 735-04-00100 | Mailbox Supports (Multiple) | 6 | EACH | 345.60 | 2,073.60 | 500.00 | 3,000.00 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,000.00 | 13,000.00 | 9,000.00 | 9,000.00 |
| 0045 | NS-500-00280 | Surface Preparation | 1 | LUMP | 69,000.00 | 69,000.00 | 200,000.00 | 200,000.00 |
| 0046 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,112 | INLF | 1.19 | 3,703.28 | 2.00 | 6,224.00 |
| 0047 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 6,100.00 | 12,200.00 | 20,000.00 | 40,000.00 |
| CONTRACTOR TOTAL | 3,953,325.01 | 5,168,719.50 | ||||||