Bid Tabulations
Letting of
04/27/2011
LA DOTD Headquarters
| Lead Project: 003-10-0020 | |
| Parish: Acadia | |
| Routes: | |
| Description: INTERSECTION IMPROVEMENT - US 90 AT LA 1111 SPUR | |
| Type Const: DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $328,172.75 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 33663 | Glenn Lege Construction Inc | $299,151.60 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $393,987.34 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $483,524.30 |
| 4 | 51821 | Elliott Construction, LLC | $496,307.24 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Glenn Lege Construction Inc |
- 2 - Gilchrist Construction Co. LLC |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Elliott Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 103 | SQYD | 10.00 | 1,030.00 | 10.00 | 1,030.00 | 30.00 | 3,090.00 | 20.00 | 2,060.00 |
| 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,900.00 | 6,900.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 |
| 0003 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 185.00 | 1,110.00 | 270.00 | 1,620.00 | 500.00 | 3,000.00 | 125.00 | 750.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 992.4 | TON | 93.00 | 92,293.20 | 110.00 | 109,164.00 | 165.00 | 163,746.00 | 195.00 | 193,518.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 15 | TON | 124.00 | 1,860.00 | 250.00 | 3,750.00 | 250.00 | 3,750.00 | 250.00 | 3,750.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 4,057.7 | SQYD | 2.25 | 9,129.83 | 3.00 | 12,173.10 | 10.00 | 40,577.00 | 3.75 | 15,216.38 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -195 | CUYD | 0.10 | -19.50 | 5.00 | -975.00 | 0.10 | -19.50 | 0.01 | -1.95 |
| 0008 | 510-02-00100 | Pavement Widening | 1,900.4 | SQYD | 52.50 | 99,771.00 | 63.00 | 119,725.20 | 65.00 | 123,526.00 | 85.00 | 161,534.00 |
| 0009 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 16 | LNFT | 60.00 | 960.00 | 100.00 | 1,600.00 | 125.00 | 2,000.00 | 90.00 | 1,440.00 |
| 0010 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 60.00 | 960.00 | 100.00 | 1,600.00 | 175.00 | 2,800.00 | 100.00 | 1,600.00 |
| 0011 | 701-15-00100 | Concrete Collar | 1 | EACH | 520.00 | 520.00 | 800.00 | 800.00 | 835.00 | 835.00 | 1,250.00 | 1,250.00 |
| 0012 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,900.00 | 2,900.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 |
| 0013 | 702-06-01000 | Side Drain End Treatment (1 Barrel, 18" RCP/PP or 24" CMP) | 2 | EACH | 1,850.00 | 3,700.00 | 2,100.00 | 4,200.00 | 2,000.00 | 4,000.00 | 1,425.00 | 2,850.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 110 | SQYD | 67.00 | 7,370.00 | 70.00 | 7,700.00 | 75.00 | 8,250.00 | 67.00 | 7,370.00 |
| 0015 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 63.2 | SQYD | 67.00 | 4,234.40 | 65.00 | 4,108.00 | 75.00 | 4,740.00 | 75.00 | 4,740.00 |
| 0016 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,110 | LNFT | 20.50 | 22,755.00 | 28.00 | 31,080.00 | 25.00 | 27,750.00 | 25.00 | 27,750.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,550.00 | 5,550.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 174 | LNFT | 0.70 | 121.80 | 0.60 | 104.40 | 0.25 | 43.50 | 0.25 | 43.50 |
| 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 356 | LNFT | 1.35 | 480.60 | 1.10 | 391.60 | 0.80 | 284.80 | 0.75 | 267.00 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.562 | MILE | 890.00 | 3,170.18 | 770.00 | 2,742.74 | 900.00 | 3,205.80 | 750.00 | 2,671.50 |
| 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 66.00 | 396.00 | 55.00 | 330.00 | 70.00 | 420.00 | 58.00 | 348.00 |
| 0022 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 66.00 | 396.00 | 55.00 | 330.00 | 70.00 | 420.00 | 58.00 | 348.00 |
| 0023 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 840 | EACH | 2.65 | 2,226.00 | 2.25 | 1,890.00 | 1.80 | 1,512.00 | 0.33 | 277.20 |
| 0024 | 726-01-00100 | Bedding Material | 16 | CUYD | 90.00 | 1,440.00 | 120.00 | 1,920.00 | 115.00 | 1,840.00 | 85.00 | 1,360.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 8,900.00 | 8,900.00 | 35,000.00 | 35,000.00 | 39,000.00 | 39,000.00 | 25,000.00 | 25,000.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 420 | EACH | 6.60 | 2,772.00 | 5.70 | 2,394.00 | 5.00 | 2,100.00 | 6.00 | 2,520.00 |
| 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 87 | LNFT | 1.35 | 117.45 | 1.10 | 95.70 | 1.10 | 95.70 | 1.11 | 96.57 |
| 0028 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 151 | LNFT | 5.30 | 800.30 | 4.50 | 679.50 | 5.50 | 830.50 | 4.45 | 671.95 |
| 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 27 | LNFT | 6.60 | 178.20 | 5.50 | 148.50 | 7.00 | 189.00 | 5.56 | 150.12 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.781 | MILE | 3,960.00 | 7,052.76 | 3,400.00 | 6,055.40 | 3,600.00 | 6,411.60 | 3,111.66 | 5,541.87 |
| 0031 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.046 | MILE | 1,980.00 | 91.08 | 1,700.00 | 78.20 | 6,900.00 | 317.40 | 5,556.52 | 255.60 |
| 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 230.00 | 460.00 | 200.00 | 400.00 | 340.00 | 680.00 | 288.00 | 576.00 |
| 0033 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 230.00 | 230.00 | 200.00 | 200.00 | 340.00 | 340.00 | 288.00 | 288.00 |
| 0034 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 265.00 | 795.00 | 225.00 | 675.00 | 340.00 | 1,020.00 | 288.00 | 864.00 |
| 0035 | 739-01-00100 | Hydro-Seeding | 0.19 | ACRE | 7,920.00 | 1,504.80 | 6,900.00 | 1,311.00 | 8,000.00 | 1,520.00 | 10,000.00 | 1,900.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,400.00 | 4,400.00 | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | 4,000.00 | 4,000.00 |
| 0037 | 806-01-00100 | Deformed Reinforcing Steel | 82 | LB | 3.50 | 287.00 | 3.00 | 246.00 | 2.25 | 184.50 | 2.00 | 164.00 |
| 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,710 | INLF | 1.35 | 2,308.50 | 2.00 | 3,420.00 | 1.50 | 2,565.00 | 1.25 | 2,137.50 |
| CONTRACTOR TOTAL | 299,151.60 | 393,987.34 | 483,524.30 | 496,307.24 | ||||||||