Bid Tabulations
Letting of
06/15/2011
LA DOTD Headquarters
| Lead Project: 001-09-0083 | |
| Parish: Ouachita | |
| Routes: US 80 | |
| Description: LOUISVILLE AVENUE CORRIDOR ENHANCEMENT, PHASE I | |
| Type Const: GRADING, CONCRETE WALKS AND DRIVES, ELECTRICAL, AND RELATED WORK | |
| Estimated Construction Cost: $542,160.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 18546 | C W & W Contractors, Inc. | $564,030.50 |
| 2 | 30774 | Progressive Construction Co., LLC | $583,665.20 |
| 3 | 01165 | Ernest P. Breaux Electrical, Inc. | $877,617.03 |
| 4 | 43371 | RMD Holdings Ltd | $901,674.45 |
| 5 | 15099 | Amethyst Construction, Inc. | $974,160.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - C W & W Contractors, Inc. |
- 2 - Progressive Construction Co., LLC |
- 3 - Ernest P. Breaux Electrical, Inc. |
- 4 - RMD Holdings Ltd |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 3,554.50 | 3,554.50 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,755 | SQYD | 5.00 | 13,775.00 | 9.75 | 26,861.25 | 14.00 | 38,570.00 | 11.85 | 32,646.75 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 27 | LNFT | 10.00 | 270.00 | 2.25 | 60.75 | 16.50 | 445.50 | 17.77 | 479.79 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 3,350.00 | 3,350.00 | 32,144.83 | 32,144.83 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 10.00 | 100.00 | 22.00 | 220.00 | 22.00 | 220.00 | 23.70 | 237.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 3.00 | 1,500.00 | 4.00 | 2,000.00 | 3.85 | 1,925.00 | 2.37 | 1,185.00 |
| 0007 | 706-01-00100 | Concrete Walk (4" Thick) | 1,109 | SQYD | 50.00 | 55,450.00 | 70.25 | 77,907.25 | 71.50 | 79,293.50 | 94.79 | 105,122.11 |
| 0008 | 706-02-00200 | Concrete Drive (6" Thick) | 1,160 | SQYD | 65.00 | 75,400.00 | 74.00 | 85,840.00 | 104.50 | 121,220.00 | 112.56 | 130,569.60 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 | 45,905.00 | 45,905.00 | 59,106.40 | 59,106.40 |
| 0010 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,205 | SQYD | 6.00 | 7,230.00 | 7.50 | 9,037.50 | 12.80 | 15,424.00 | 8.66 | 10,435.30 |
| 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 45,000.00 | 45,000.00 | 57,500.00 | 57,500.00 | 46,000.00 | 46,000.00 | 136,049.76 | 136,049.76 |
| 0012 | 730-01-00100 | Trenching and Backfilling | 3,715 | LNFT | 2.00 | 7,430.00 | 2.20 | 8,173.00 | 3.85 | 14,302.75 | 1.62 | 6,018.30 |
| 0013 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 2 #8, 1 #8 Gr. | 3,730 | LNFT | 4.00 | 14,920.00 | 4.60 | 17,158.00 | 3.10 | 11,563.00 | 5.52 | 20,589.60 |
| 0014 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 2 #6, 1 #6 Gr. | 555 | LNFT | 6.00 | 3,330.00 | 6.00 | 3,330.00 | 4.00 | 2,220.00 | 10.43 | 5,788.65 |
| 0015 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") Empty Conduit with Pull String | 4,285 | LNFT | 2.00 | 8,570.00 | 2.20 | 9,427.00 | 1.45 | 6,213.25 | 1.35 | 5,784.75 |
| 0016 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 570 | LNFT | 40.00 | 22,800.00 | 31.00 | 17,670.00 | 22.60 | 12,882.00 | 47.39 | 27,012.30 |
| 0017 | 730-05-10000 | Light Pole 16' Cast Aluminum, Ground Mounted | 46 | EACH | 2,200.00 | 101,200.00 | 2,260.00 | 103,960.00 | 1,905.00 | 87,630.00 | 2,015.53 | 92,714.38 |
| 0018 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) | 46 | EACH | 1,000.00 | 46,000.00 | 1,152.00 | 52,992.00 | 708.00 | 32,568.00 | 1,321.84 | 60,804.64 |
| 0019 | 730-08-00200 | Electrical Service Point (Structure) | 4 | EACH | 1,800.00 | 7,200.00 | 1,375.00 | 5,500.00 | 3,820.00 | 15,280.00 | 1,699.36 | 6,797.44 |
| 0020 | 730-09-00100 | Electrical System | 1 | LUMP | 7,500.00 | 7,500.00 | 2,200.00 | 2,200.00 | 2,235.00 | 2,235.00 | 32,808.70 | 32,808.70 |
| 0021 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 750.00 | 750.00 | 2,200.00 | 2,200.00 | 1,035.00 | 1,035.00 | 20,211.55 | 20,211.55 |
| 0022 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) 30' Cast Aluminum | 15 | EACH | 200.00 | 3,000.00 | 220.00 | 3,300.00 | 345.00 | 5,175.00 | 236.22 | 3,543.30 |
| 0023 | 730-13-00100 | Removal and Disposal of Light Pole Foundation Min. 8" Below Grade | 16 | EACH | 270.00 | 4,320.00 | 275.00 | 4,400.00 | 447.00 | 7,152.00 | 229.60 | 3,673.60 |
| 0024 | 730-14-00100 | Removal and Disposal of Luminaires | 29 | EACH | 22.00 | 638.00 | 27.50 | 797.50 | 68.25 | 1,979.25 | 110.67 | 3,209.43 |
| 0025 | 730-18-00100 | Service Pole | 4 | EACH | 375.00 | 1,500.00 | 220.00 | 880.00 | 850.00 | 3,400.00 | 325.83 | 1,303.32 |
| 0026 | 730-21-00020 | Duct Marker (Concrete) | 18 | EACH | 105.00 | 1,890.00 | 27.50 | 495.00 | 490.00 | 8,820.00 | 85.65 | 1,541.70 |
| 0027 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 3,715 | LNFT | 1.30 | 4,829.50 | 0.33 | 1,225.95 | 0.50 | 1,857.50 | 0.19 | 705.85 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 33,000.00 | 33,000.00 | 21,840.92 | 21,840.92 |
| 0029 | 741-11-00200 | Adjusting Water Valve and Meter Box | 9 | EACH | 500.00 | 4,500.00 | 100.00 | 900.00 | 2,420.00 | 21,780.00 | 715.82 | 6,442.38 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,652 | INLF | 2.00 | 5,304.00 | 1.50 | 3,978.00 | 6.27 | 16,628.04 | 1.13 | 2,996.76 |
| 0031 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,344 | INLF | 2.00 | 2,688.00 | 1.50 | 2,016.00 | 6.27 | 8,426.88 | 1.78 | 2,392.32 |
| 0032 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 9,068 | INLF | 2.00 | 18,136.00 | 2.00 | 18,136.00 | 6.27 | 56,856.36 | 1.26 | 11,425.68 |
| 0033 | NS-ENH-01020 | Adjusting In-Ground Utility Access Boxes Cast Iron Sewer Cleanout Box | 4 | EACH | 1,200.00 | 4,800.00 | 250.00 | 1,000.00 | 8,250.00 | 33,000.00 | 2,946.01 | 11,784.04 |
| 0034 | NS-ENH-08000 | Handrails Galvanized Steel | 20 | LNFT | 100.00 | 2,000.00 | 50.00 | 1,000.00 | 88.00 | 1,760.00 | 204.19 | 4,083.80 |
| 0035 | NS-ENH-19000 | Safety Rail Galvanized Steel Pipe Barrier, Both Vertical and Horizontal Pipe | 1,000 | LNFT | 50.00 | 50,000.00 | 35.00 | 35,000.00 | 126.50 | 126,500.00 | 36.67 | 36,670.00 |
| CONTRACTOR TOTAL | 564,030.50 | 583,665.20 | 877,617.03 | 901,674.45 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Amethyst Construction, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,755 | SQYD | 15.00 | 41,325.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 27 | LNFT | 8.00 | 216.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 30.00 | 300.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 3.00 | 1,500.00 |
| 0007 | 706-01-00100 | Concrete Walk (4" Thick) | 1,109 | SQYD | 125.00 | 138,625.00 |
| 0008 | 706-02-00200 | Concrete Drive (6" Thick) | 1,160 | SQYD | 160.00 | 185,600.00 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0010 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,205 | SQYD | 12.00 | 14,460.00 |
| 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 92,000.00 | 92,000.00 |
| 0012 | 730-01-00100 | Trenching and Backfilling | 3,715 | LNFT | 2.20 | 8,173.00 |
| 0013 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 2 #8, 1 #8 Gr. | 3,730 | LNFT | 5.00 | 18,650.00 |
| 0014 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 2 #6, 1 #6 Gr. | 555 | LNFT | 6.00 | 3,330.00 |
| 0015 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") Empty Conduit with Pull String | 4,285 | LNFT | 2.00 | 8,570.00 |
| 0016 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 570 | LNFT | 30.00 | 17,100.00 |
| 0017 | 730-05-10000 | Light Pole 16' Cast Aluminum, Ground Mounted | 46 | EACH | 1,800.00 | 82,800.00 |
| 0018 | 730-07-04000 | Luminaire (150 Watt) (High PressureSodium) | 46 | EACH | 1,200.00 | 55,200.00 |
| 0019 | 730-08-00200 | Electrical Service Point (Structure) | 4 | EACH | 1,400.00 | 5,600.00 |
| 0020 | 730-09-00100 | Electrical System | 1 | LUMP | 3,000.00 | 3,000.00 |
| 0021 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 3,000.00 | 3,000.00 |
| 0022 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) 30' Cast Aluminum | 15 | EACH | 250.00 | 3,750.00 |
| 0023 | 730-13-00100 | Removal and Disposal of Light Pole Foundation Min. 8" Below Grade | 16 | EACH | 300.00 | 4,800.00 |
| 0024 | 730-14-00100 | Removal and Disposal of Luminaires | 29 | EACH | 30.00 | 870.00 |
| 0025 | 730-18-00100 | Service Pole | 4 | EACH | 250.00 | 1,000.00 |
| 0026 | 730-21-00020 | Duct Marker (Concrete) | 18 | EACH | 30.00 | 540.00 |
| 0027 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 3,715 | LNFT | 0.50 | 1,857.50 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 |
| 0029 | 741-11-00200 | Adjusting Water Valve and Meter Box | 9 | EACH | 950.00 | 8,550.00 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,652 | INLF | 2.50 | 6,630.00 |
| 0031 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 1,344 | INLF | 4.00 | 5,376.00 |
| 0032 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 9,068 | INLF | 3.50 | 31,738.00 |
| 0033 | NS-ENH-01020 | Adjusting In-Ground Utility Access Boxes Cast Iron Sewer Cleanout Box | 4 | EACH | 2,000.00 | 8,000.00 |
| 0034 | NS-ENH-08000 | Handrails Galvanized Steel | 20 | LNFT | 180.00 | 3,600.00 |
| 0035 | NS-ENH-19000 | Safety Rail Galvanized Steel Pipe Barrier, Both Vertical and Horizontal Pipe | 1,000 | LNFT | 65.00 | 65,000.00 |
| CONTRACTOR TOTAL | 974,160.50 | |||||