LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 001-06-0048
Parish: Bienville
Routes: US 80
Description: BLACK LAKE CREEK BRIDGE ON US 80
Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASHPALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost: $3,325,692.68


RankLicenseBidderConstruction Bid
1 12312 Gilchrist Construction Co. LLC $3,038,793.63
2 48925 David V. Temple $3,235,737.24
3 39462 Jb James Construction Llc $3,448,439.51
4 34567 James Construction Group LLC $3,560,058.61
5 43371 RMD Holdings Ltd $3,788,856.69
6 12135 Blount Bros. Construction, Inc. $3,793,537.50
7 01012 Cecil D. Gassiott, LLC $3,806,119.21
8 09090 Guinn Brothers, LLC. $3,985,286.20


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
David V. Temple
- 3 -
Jb James Construction Llc
- 4 -
James Construction Group LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 35,000.00 35,000.00 20,000.00 20,000.00 300,000.00 300,000.00 295,000.00 295,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 2,000.00 2,000.00 5,000.00 5,000.00 6,000.00 6,000.00 10,000.00 10,000.00
0003 202-02-04000 Removal of Bridge 261' x 28' Concrete Slab Bridge 1      EACH 45,000.00 45,000.00 100,000.00 100,000.00 35,000.00 35,000.00 35,000.00 35,000.00
0004 202-02-14500 Removal of Guard Rail 774      LNFT 9.00 6,966.00 1.00 774.00 2.00 1,548.00 3.00 2,322.00
0005 202-02-38500 Removal of Surfacing and Stablized Base 8,442.8    SQYD 2.60 21,951.28 3.50 29,549.80 4.00 33,771.20 2.00 16,885.60
0006 203-01-00100 General Excavation 26,215      CUYD 5.70 149,425.50 6.00 157,290.00 5.50 144,182.50 5.00 131,075.00
0007 203-03-00100 Embankment 37,947      CUYD 11.00 417,417.00 8.00 303,576.00 8.25 313,062.75 9.70 368,085.90
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 13      EACH 170.00 2,210.00 110.00 1,430.00 19.00 247.00 200.00 2,600.00
0009 204-05-00200 Temporary Sediment Check Dams (Stone) 7      EACH 270.00 1,890.00 225.00 1,575.00 800.00 5,600.00 320.00 2,240.00
0010 204-06-00100 Temporary Silt Fencing 6,840      LNFT 1.40 9,576.00 1.40 9,576.00 2.50 17,100.00 1.80 12,312.00
0011 204-07-00100 Temporary Stone Construction Entrance 1      EACH 4,000.00 4,000.00 1,500.00 1,500.00 2,000.00 2,000.00 2,500.00 2,500.00
0012 302-02-03120 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) 12,967.3    SQYD 19.00 246,378.70 18.00 233,411.40 19.00 246,378.70 19.00 246,378.70
0013 304-05-00100 Lime Treatment (Type E) 183.8    TON 240.00 44,112.00 275.00 50,545.00 25.00 4,595.00 200.00 36,760.00
0014 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 50      CUYD 100.00 5,000.00 50.00 2,500.00 150.00 7,500.00 100.00 5,000.00
0015 502-01-00100 Superpave Asphaltic Concrete 2,816.4    TON 105.00 295,722.00 115.00 323,886.00 115.00 323,886.00 115.00 323,886.00
0016 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 216.4    TON 200.00 43,280.00 115.00 24,886.00 115.00 24,886.00 115.00 24,886.00
0017 509-01-00100 Cold Planing Asphaltic Pavement 8,443      SQYD 1.60 13,508.80 3.50 29,550.50 6.00 50,658.00 2.50 21,107.50
0018 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -704      CUYD 1.00 -704.00 0.01 -7.04 0.01 -7.04 0.01 -7.04
0019 701-01-01001 Cross Drain Pipe (24" RCP) 134      LNFT 52.00 6,968.00 39.00 5,226.00 80.00 10,720.00 90.00 12,060.00
0020 701-01-01140 Cross Drain Pipe (72" RCP) 252      LNFT 235.00 59,220.00 300.00 75,600.00 322.00 81,144.00 305.00 76,860.00
0021 704-03-00100 Blocked Out Guard Rail 312.5    LNFT 20.00 6,250.00 19.00 5,937.50 24.00 7,500.00 19.00 5,937.50
0022 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 56.00 5,600.00 54.00 5,400.00 61.00 6,100.00 54.00 5,400.00
0023 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,300.00 9,200.00 2,100.00 8,400.00 2,300.00 9,200.00 2,100.00 8,400.00
0024 705-01-00100 Barbed Wire Fence 102      LNFT 26.00 2,652.00 15.00 1,530.00 10.00 1,020.00 15.00 1,530.00
0025 708-01-00100 Right-of-Way Monument 24      EACH 220.00 5,280.00 150.00 3,600.00 150.00 3,600.00 140.00 3,360.00
0026 708-02-00100 Right-of-Way Monument Witness Post 24      EACH 220.00 5,280.00 150.00 3,600.00 150.00 3,600.00 50.00 1,200.00
0027 711-01-04000 Riprap (55 lb, 18" Thick) 134      SQYD 65.00 8,710.00 54.00 7,236.00 75.00 10,050.00 54.00 7,236.00
0028 711-04-00100 Geotextile Fabric 134      SQYD 7.50 1,005.00 6.20 830.80 2.00 268.00 7.50 1,005.00
0029 712-04-00100 Flexible Revetment 622      SQYD 54.00 33,588.00 45.00 27,990.00 52.00 32,344.00 55.00 34,210.00
0030 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 15,000.00 15,000.00 25,000.00 25,000.00 20,000.00 20,000.00
0031 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 2.316  MILE 600.00 1,389.60 300.00 694.80 700.00 1,621.20 300.00 694.80
0032 716-01-00100 Mulch (Vegetative) 26.6    TON 550.00 14,630.00 550.00 14,630.00 500.00 13,300.00 550.00 14,630.00
0033 717-01-00100 Seeding 532      LB 8.80 4,681.60 8.00 4,256.00 8.00 4,256.00 8.00 4,256.00
0034 718-01-00100 Fertilizer 13,300      LB 0.50 6,650.00 0.49 6,517.00 0.50 6,650.00 0.49 6,517.00
0035 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,344      SQYD 1.40 3,281.60 1.20 2,812.80 3.00 7,032.00 1.20 2,812.80
0036 722-01-00100 Project Site Laboratory 1      EACH 5,000.00 5,000.00 7,500.00 7,500.00 15,000.00 15,000.00 10,000.00 10,000.00
0037 726-01-00100 Bedding Material 48.1    CUYD 100.00 4,810.00 100.00 4,810.00 80.00 3,848.00 165.00 7,936.50
0038 727-01-00100 Mobilization 1      LUMP 240,000.00 240,000.00 267,000.00 267,000.00 340,000.00 340,000.00 355,000.00 355,000.00
0039 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 75.00 300.00 70.00 280.00 75.00 300.00 70.00 280.00
0040 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 75.00 300.00 70.00 280.00 110.00 440.00 70.00 280.00
0041 731-01-00100 Nonreflectorized Raised Pavement Markers 176      EACH 11.00 1,936.00 9.50 1,672.00 12.00 2,112.00 9.50 1,672.00
0042 731-02-00100 Reflectorized Raised Pavement Markers 164      EACH 5.80 951.20 6.00 984.00 5.00 820.00 6.00 984.00
0043 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.503  MILE 3,100.00 7,759.30 2,900.00 7,258.70 2,600.00 6,507.80 2,900.00 7,258.70
0044 740-01-00100 Construction Layout 1      LUMP 22,000.00 22,000.00 25,000.00 25,000.00 35,000.00 35,000.00 30,000.00 30,000.00
0045 804-01-00600 Precast Concrete Piles (24") 4,960      LNFT 98.00 486,080.00 120.00 595,200.00 95.00 471,200.00 118.00 585,280.00
0046 804-12-00100 Loading Permanent Piles 1      EACH 6,000.00 6,000.00 1,000.00 1,000.00 500.00 500.00 3,800.00 3,800.00
0047 804-13-00100 Precast Concrete Indicator Piles (24") 1      EACH 25,000.00 25,000.00 7,500.00 7,500.00 9,000.00 9,000.00 22,000.00 22,000.00
0048 804-17-00100 Dynamic Monitoring 8      EACH 500.00 4,000.00 500.00 4,000.00 1,000.00 8,000.00 1,400.00 11,200.00
0049 805-01-00700 Class A Concrete (Bents) 275.28   CUYD 580.00 159,662.40 600.00 165,168.00 875.00 240,870.00 600.00 165,168.00
0050 805-03-00100 Class AA Concrete 547.95   CUYD 530.00 290,413.50 700.00 383,565.00 550.00 301,372.50 620.00 339,729.00
0051 806-01-00100 Deformed Reinforcing Steel 153,435      LB 0.73 112,007.55 1.00 153,435.00 1.00 153,435.00 0.95 145,763.25
0052 810-01-00100 Concrete Railing (Standard Barrier) 600      LNFT 70.00 42,000.00 65.00 39,000.00 52.00 31,200.00 65.00 39,000.00
0053 813-01-00100 Concrete Approach Slabs 364.44   SQYD 240.00 87,465.60 225.00 81,999.00 225.00 81,999.00 235.00 85,643.40
0054 NS-724-00002 Rumble Strips (Shoulder Ground-In) 0.989  MILE 1,000.00 989.00 5,846.29 5,781.98 7,100.00 7,021.90 7,000.00 6,923.00
                         
    CONTRACTOR TOTAL       3,038,793.63   3,235,737.24   3,448,439.51   3,560,058.61



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
RMD Holdings Ltd
- 6 -
Blount Bros. Construction, Inc.
- 7 -
Cecil D. Gassiott, LLC
- 8 -
Guinn Brothers, LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 21,109.85 21,109.85 50,000.00 50,000.00 65,000.00 65,000.00 150,000.00 150,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 3,824.47 3,824.47 15,000.00 15,000.00 25,000.00 25,000.00 10,000.00 10,000.00
0003 202-02-04000 Removal of Bridge 261' x 28' Concrete Slab Bridge 1      EACH 15,768.46 15,768.46 100,000.00 100,000.00 75,000.00 75,000.00 75,000.00 75,000.00
0004 202-02-14500 Removal of Guard Rail 774      LNFT 4.34 3,359.16 10.00 7,740.00 10.00 7,740.00 4.00 3,096.00
0005 202-02-38500 Removal of Surfacing and Stablized Base 8,442.8    SQYD 4.10 34,615.48 4.00 33,771.20 7.00 59,099.60 5.00 42,214.00
0006 203-01-00100 General Excavation 26,215      CUYD 6.05 158,600.75 4.00 104,860.00 5.00 131,075.00 4.00 104,860.00
0007 203-03-00100 Embankment 37,947      CUYD 18.62 706,573.14 12.00 455,364.00 16.00 607,152.00 9.00 341,523.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 13      EACH 124.12 1,613.56 150.00 1,950.00 325.00 4,225.00 100.00 1,300.00
0009 204-05-00200 Temporary Sediment Check Dams (Stone) 7      EACH 291.12 2,037.84 500.00 3,500.00 900.00 6,300.00 1,000.00 7,000.00
0010 204-06-00100 Temporary Silt Fencing 6,840      LNFT 1.65 11,286.00 4.00 27,360.00 4.00 27,360.00 2.00 13,680.00
0011 204-07-00100 Temporary Stone Construction Entrance 1      EACH 4,300.00 4,300.00 4,000.00 4,000.00 2,000.00 2,000.00 2,500.00 2,500.00
0012 302-02-03120 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) 12,967.3    SQYD 19.93 258,438.29 21.00 272,313.30 26.00 337,149.80 19.00 246,378.70
0013 304-05-00100 Lime Treatment (Type E) 183.8    TON 263.22 48,379.84 275.00 50,545.00 250.00 45,950.00 250.00 45,950.00
0014 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 50      CUYD 68.38 3,419.00 40.00 2,000.00 100.00 5,000.00 50.00 2,500.00
0015 502-01-00100 Superpave Asphaltic Concrete 2,816.4    TON 135.29 381,030.76 140.00 394,296.00 120.00 337,968.00 175.00 492,870.00
0016 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 216.4    TON 135.29 29,276.76 150.00 32,460.00 125.00 27,050.00 200.00 43,280.00
0017 509-01-00100 Cold Planing Asphaltic Pavement 8,443      SQYD 2.44 20,600.92 3.50 29,550.50 6.00 50,658.00 2.50 21,107.50
0018 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -704      CUYD 0.01 -7.04 7.75 -5,456.00 0.01 -7.04 0.00 0.00
0019 701-01-01001 Cross Drain Pipe (24" RCP) 134      LNFT 108.66 14,560.44 60.00 8,040.00 160.00 21,440.00 108.00 14,472.00
0020 701-01-01140 Cross Drain Pipe (72" RCP) 252      LNFT 259.80 65,469.60 400.00 100,800.00 350.00 88,200.00 545.00 137,340.00
0021 704-03-00100 Blocked Out Guard Rail 312.5    LNFT 24.71 7,721.88 30.00 9,375.00 20.00 6,250.00 22.00 6,875.00
0022 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 100      LNFT 88.24 8,824.00 100.00 10,000.00 60.00 6,000.00 60.00 6,000.00
0023 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,647.06 10,588.24 3,000.00 12,000.00 2,200.00 8,800.00 2,500.00 10,000.00
0024 705-01-00100 Barbed Wire Fence 102      LNFT 17.65 1,800.30 9.00 918.00 15.00 1,530.00 10.00 1,020.00
0025 708-01-00100 Right-of-Way Monument 24      EACH 164.71 3,953.04 250.00 6,000.00 500.00 12,000.00 200.00 4,800.00
0026 708-02-00100 Right-of-Way Monument Witness Post 24      EACH 58.82 1,411.68 200.00 4,800.00 150.00 3,600.00 100.00 2,400.00
0027 711-01-04000 Riprap (55 lb, 18" Thick) 134      SQYD 63.53 8,513.02 65.00 8,710.00 70.00 9,380.00 80.00 10,720.00
0028 711-04-00100 Geotextile Fabric 134      SQYD 7.29 976.86 3.50 469.00 3.25 435.50 5.00 670.00
0029 712-04-00100 Flexible Revetment 622      SQYD 52.94 32,928.68 55.00 34,210.00 75.00 46,650.00 75.00 46,650.00
0030 713-01-00100 Temporary Signs and Barricades 1      LUMP 16,323.53 16,323.53 35,000.00 35,000.00 8,500.00 8,500.00 20,000.00 20,000.00
0031 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 2.316  MILE 823.53 1,907.30 1,000.00 2,316.00 325.00 752.70 1,500.00 3,474.00
0032 716-01-00100 Mulch (Vegetative) 26.6    TON 647.06 17,211.80 600.00 15,960.00 600.00 15,960.00 850.00 22,610.00
0033 717-01-00100 Seeding 532      LB 9.41 5,006.12 10.00 5,320.00 8.00 4,256.00 12.00 6,384.00
0034 718-01-00100 Fertilizer 13,300      LB 0.58 7,714.00 1.00 13,300.00 0.50 6,650.00 0.75 9,975.00
0035 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,344      SQYD 1.41 3,305.04 1.00 2,344.00 1.25 2,930.00 4.50 10,548.00
0036 722-01-00100 Project Site Laboratory 1      EACH 11,058.82 11,058.82 12,000.00 12,000.00 9,000.00 9,000.00 10,000.00 10,000.00
0037 726-01-00100 Bedding Material 48.1    CUYD 78.96 3,797.98 75.00 3,607.50 125.00 6,012.50 100.00 4,810.00
0038 727-01-00100 Mobilization 1      LUMP 203,588.24 203,588.24 100,000.00 100,000.00 250,000.00 250,000.00 325,000.00 325,000.00
0039 729-16-00200 Object Marker Assembly (Type 2) 4      EACH 88.24 352.96 100.00 400.00 75.00 300.00 100.00 400.00
0040 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 129.41 517.64 125.00 500.00 75.00 300.00 100.00 400.00
0041 731-01-00100 Nonreflectorized Raised Pavement Markers 176      EACH 14.12 2,485.12 15.00 2,640.00 10.00 1,760.00 20.00 3,520.00
0042 731-02-00100 Reflectorized Raised Pavement Markers 164      EACH 5.88 964.32 6.00 984.00 6.50 1,066.00 10.00 1,640.00
0043 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.503  MILE 3,058.82 7,656.23 3,000.00 7,509.00 3,000.00 7,509.00 3,500.00 8,760.50
0044 740-01-00100 Construction Layout 1      LUMP 22,823.53 22,823.53 30,000.00 30,000.00 8,500.00 8,500.00 28,000.00 28,000.00
0045 804-01-00600 Precast Concrete Piles (24") 4,960      LNFT 176.50 875,440.00 150.00 744,000.00 77.00 381,920.00 135.00 669,600.00
0046 804-12-00100 Loading Permanent Piles 1      EACH 11,176.47 11,176.47 2,500.00 2,500.00 2,000.00 2,000.00 1.00 1.00
0047 804-13-00100 Precast Concrete Indicator Piles (24") 1      EACH 8,823.53 8,823.53 10,000.00 10,000.00 11,500.00 11,500.00 10,000.00 10,000.00
0048 804-17-00100 Dynamic Monitoring 8      EACH 588.24 4,705.92 1,500.00 12,000.00 3,500.00 28,000.00 500.00 4,000.00
0049 805-01-00700 Class A Concrete (Bents) 275.28   CUYD 632.07 173,996.23 600.00 165,168.00 1,070.00 294,549.60 1,000.00 275,280.00
0050 805-03-00100 Class AA Concrete 547.95   CUYD 532.02 291,520.36 700.00 383,565.00 875.00 479,456.25 800.00 438,360.00
0051 806-01-00100 Deformed Reinforcing Steel 153,435      LB 0.87 133,488.45 2.00 306,870.00 0.90 138,091.50 0.88 135,022.80
0052 810-01-00100 Concrete Railing (Standard Barrier) 600      LNFT 102.02 61,212.00 100.00 60,000.00 70.00 42,000.00 80.00 48,000.00
0053 813-01-00100 Concrete Approach Slabs 364.44   SQYD 148.87 54,254.18 250.00 91,110.00 220.00 80,176.80 255.00 92,932.20
0054 NS-724-00002 Rumble Strips (Shoulder Ground-In) 0.989  MILE 8,647.06 8,551.94 12,000.00 11,868.00 7,000.00 6,923.00 12,500.00 12,362.50
                         
    CONTRACTOR TOTAL       3,788,856.69   3,793,537.50   3,806,119.21   3,985,286.20
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.