Bid Tabulations
Letting of
06/15/2011
LA DOTD Headquarters
| Lead Project: 001-06-0048 | |
| Parish: Bienville | |
| Routes: US 80 | |
| Description: BLACK LAKE CREEK BRIDGE ON US 80 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASHPALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $3,325,692.68 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $3,038,793.63 |
| 2 | 48925 | David V. Temple | $3,235,737.24 |
| 3 | 39462 | Jb James Construction Llc | $3,448,439.51 |
| 4 | 34567 | James Construction Group LLC | $3,560,058.61 |
| 5 | 43371 | RMD Holdings Ltd | $3,788,856.69 |
| 6 | 12135 | Blount Bros. Construction, Inc. | $3,793,537.50 |
| 7 | 01012 | Cecil D. Gassiott, LLC | $3,806,119.21 |
| 8 | 09090 | Guinn Brothers, LLC. | $3,985,286.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - David V. Temple |
- 3 - Jb James Construction Llc |
- 4 - James Construction Group LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 300,000.00 | 300,000.00 | 295,000.00 | 295,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge 261' x 28' Concrete Slab Bridge | 1 | EACH | 45,000.00 | 45,000.00 | 100,000.00 | 100,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 774 | LNFT | 9.00 | 6,966.00 | 1.00 | 774.00 | 2.00 | 1,548.00 | 3.00 | 2,322.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,442.8 | SQYD | 2.60 | 21,951.28 | 3.50 | 29,549.80 | 4.00 | 33,771.20 | 2.00 | 16,885.60 |
| 0006 | 203-01-00100 | General Excavation | 26,215 | CUYD | 5.70 | 149,425.50 | 6.00 | 157,290.00 | 5.50 | 144,182.50 | 5.00 | 131,075.00 |
| 0007 | 203-03-00100 | Embankment | 37,947 | CUYD | 11.00 | 417,417.00 | 8.00 | 303,576.00 | 8.25 | 313,062.75 | 9.70 | 368,085.90 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 170.00 | 2,210.00 | 110.00 | 1,430.00 | 19.00 | 247.00 | 200.00 | 2,600.00 |
| 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 7 | EACH | 270.00 | 1,890.00 | 225.00 | 1,575.00 | 800.00 | 5,600.00 | 320.00 | 2,240.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 6,840 | LNFT | 1.40 | 9,576.00 | 1.40 | 9,576.00 | 2.50 | 17,100.00 | 1.80 | 12,312.00 |
| 0011 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 4,000.00 | 4,000.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 |
| 0012 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 12,967.3 | SQYD | 19.00 | 246,378.70 | 18.00 | 233,411.40 | 19.00 | 246,378.70 | 19.00 | 246,378.70 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 183.8 | TON | 240.00 | 44,112.00 | 275.00 | 50,545.00 | 25.00 | 4,595.00 | 200.00 | 36,760.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 50.00 | 2,500.00 | 150.00 | 7,500.00 | 100.00 | 5,000.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 2,816.4 | TON | 105.00 | 295,722.00 | 115.00 | 323,886.00 | 115.00 | 323,886.00 | 115.00 | 323,886.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 216.4 | TON | 200.00 | 43,280.00 | 115.00 | 24,886.00 | 115.00 | 24,886.00 | 115.00 | 24,886.00 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 8,443 | SQYD | 1.60 | 13,508.80 | 3.50 | 29,550.50 | 6.00 | 50,658.00 | 2.50 | 21,107.50 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -704 | CUYD | 1.00 | -704.00 | 0.01 | -7.04 | 0.01 | -7.04 | 0.01 | -7.04 |
| 0019 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 134 | LNFT | 52.00 | 6,968.00 | 39.00 | 5,226.00 | 80.00 | 10,720.00 | 90.00 | 12,060.00 |
| 0020 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 252 | LNFT | 235.00 | 59,220.00 | 300.00 | 75,600.00 | 322.00 | 81,144.00 | 305.00 | 76,860.00 |
| 0021 | 704-03-00100 | Blocked Out Guard Rail | 312.5 | LNFT | 20.00 | 6,250.00 | 19.00 | 5,937.50 | 24.00 | 7,500.00 | 19.00 | 5,937.50 |
| 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 56.00 | 5,600.00 | 54.00 | 5,400.00 | 61.00 | 6,100.00 | 54.00 | 5,400.00 |
| 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,100.00 | 8,400.00 | 2,300.00 | 9,200.00 | 2,100.00 | 8,400.00 |
| 0024 | 705-01-00100 | Barbed Wire Fence | 102 | LNFT | 26.00 | 2,652.00 | 15.00 | 1,530.00 | 10.00 | 1,020.00 | 15.00 | 1,530.00 |
| 0025 | 708-01-00100 | Right-of-Way Monument | 24 | EACH | 220.00 | 5,280.00 | 150.00 | 3,600.00 | 150.00 | 3,600.00 | 140.00 | 3,360.00 |
| 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 24 | EACH | 220.00 | 5,280.00 | 150.00 | 3,600.00 | 150.00 | 3,600.00 | 50.00 | 1,200.00 |
| 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 134 | SQYD | 65.00 | 8,710.00 | 54.00 | 7,236.00 | 75.00 | 10,050.00 | 54.00 | 7,236.00 |
| 0028 | 711-04-00100 | Geotextile Fabric | 134 | SQYD | 7.50 | 1,005.00 | 6.20 | 830.80 | 2.00 | 268.00 | 7.50 | 1,005.00 |
| 0029 | 712-04-00100 | Flexible Revetment | 622 | SQYD | 54.00 | 33,588.00 | 45.00 | 27,990.00 | 52.00 | 32,344.00 | 55.00 | 34,210.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 |
| 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.316 | MILE | 600.00 | 1,389.60 | 300.00 | 694.80 | 700.00 | 1,621.20 | 300.00 | 694.80 |
| 0032 | 716-01-00100 | Mulch (Vegetative) | 26.6 | TON | 550.00 | 14,630.00 | 550.00 | 14,630.00 | 500.00 | 13,300.00 | 550.00 | 14,630.00 |
| 0033 | 717-01-00100 | Seeding | 532 | LB | 8.80 | 4,681.60 | 8.00 | 4,256.00 | 8.00 | 4,256.00 | 8.00 | 4,256.00 |
| 0034 | 718-01-00100 | Fertilizer | 13,300 | LB | 0.50 | 6,650.00 | 0.49 | 6,517.00 | 0.50 | 6,650.00 | 0.49 | 6,517.00 |
| 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,344 | SQYD | 1.40 | 3,281.60 | 1.20 | 2,812.80 | 3.00 | 7,032.00 | 1.20 | 2,812.80 |
| 0036 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0037 | 726-01-00100 | Bedding Material | 48.1 | CUYD | 100.00 | 4,810.00 | 100.00 | 4,810.00 | 80.00 | 3,848.00 | 165.00 | 7,936.50 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 240,000.00 | 240,000.00 | 267,000.00 | 267,000.00 | 340,000.00 | 340,000.00 | 355,000.00 | 355,000.00 |
| 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 75.00 | 300.00 | 70.00 | 280.00 | 75.00 | 300.00 | 70.00 | 280.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 70.00 | 280.00 | 110.00 | 440.00 | 70.00 | 280.00 |
| 0041 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 176 | EACH | 11.00 | 1,936.00 | 9.50 | 1,672.00 | 12.00 | 2,112.00 | 9.50 | 1,672.00 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 164 | EACH | 5.80 | 951.20 | 6.00 | 984.00 | 5.00 | 820.00 | 6.00 | 984.00 |
| 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.503 | MILE | 3,100.00 | 7,759.30 | 2,900.00 | 7,258.70 | 2,600.00 | 6,507.80 | 2,900.00 | 7,258.70 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 |
| 0045 | 804-01-00600 | Precast Concrete Piles (24") | 4,960 | LNFT | 98.00 | 486,080.00 | 120.00 | 595,200.00 | 95.00 | 471,200.00 | 118.00 | 585,280.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 6,000.00 | 6,000.00 | 1,000.00 | 1,000.00 | 500.00 | 500.00 | 3,800.00 | 3,800.00 |
| 0047 | 804-13-00100 | Precast Concrete Indicator Piles (24") | 1 | EACH | 25,000.00 | 25,000.00 | 7,500.00 | 7,500.00 | 9,000.00 | 9,000.00 | 22,000.00 | 22,000.00 |
| 0048 | 804-17-00100 | Dynamic Monitoring | 8 | EACH | 500.00 | 4,000.00 | 500.00 | 4,000.00 | 1,000.00 | 8,000.00 | 1,400.00 | 11,200.00 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 275.28 | CUYD | 580.00 | 159,662.40 | 600.00 | 165,168.00 | 875.00 | 240,870.00 | 600.00 | 165,168.00 |
| 0050 | 805-03-00100 | Class AA Concrete | 547.95 | CUYD | 530.00 | 290,413.50 | 700.00 | 383,565.00 | 550.00 | 301,372.50 | 620.00 | 339,729.00 |
| 0051 | 806-01-00100 | Deformed Reinforcing Steel | 153,435 | LB | 0.73 | 112,007.55 | 1.00 | 153,435.00 | 1.00 | 153,435.00 | 0.95 | 145,763.25 |
| 0052 | 810-01-00100 | Concrete Railing (Standard Barrier) | 600 | LNFT | 70.00 | 42,000.00 | 65.00 | 39,000.00 | 52.00 | 31,200.00 | 65.00 | 39,000.00 |
| 0053 | 813-01-00100 | Concrete Approach Slabs | 364.44 | SQYD | 240.00 | 87,465.60 | 225.00 | 81,999.00 | 225.00 | 81,999.00 | 235.00 | 85,643.40 |
| 0054 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.989 | MILE | 1,000.00 | 989.00 | 5,846.29 | 5,781.98 | 7,100.00 | 7,021.90 | 7,000.00 | 6,923.00 |
| CONTRACTOR TOTAL | 3,038,793.63 | 3,235,737.24 | 3,448,439.51 | 3,560,058.61 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - RMD Holdings Ltd |
- 6 - Blount Bros. Construction, Inc. |
- 7 - Cecil D. Gassiott, LLC |
- 8 - Guinn Brothers, LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 21,109.85 | 21,109.85 | 50,000.00 | 50,000.00 | 65,000.00 | 65,000.00 | 150,000.00 | 150,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,824.47 | 3,824.47 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge 261' x 28' Concrete Slab Bridge | 1 | EACH | 15,768.46 | 15,768.46 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 774 | LNFT | 4.34 | 3,359.16 | 10.00 | 7,740.00 | 10.00 | 7,740.00 | 4.00 | 3,096.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 8,442.8 | SQYD | 4.10 | 34,615.48 | 4.00 | 33,771.20 | 7.00 | 59,099.60 | 5.00 | 42,214.00 |
| 0006 | 203-01-00100 | General Excavation | 26,215 | CUYD | 6.05 | 158,600.75 | 4.00 | 104,860.00 | 5.00 | 131,075.00 | 4.00 | 104,860.00 |
| 0007 | 203-03-00100 | Embankment | 37,947 | CUYD | 18.62 | 706,573.14 | 12.00 | 455,364.00 | 16.00 | 607,152.00 | 9.00 | 341,523.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 124.12 | 1,613.56 | 150.00 | 1,950.00 | 325.00 | 4,225.00 | 100.00 | 1,300.00 |
| 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 7 | EACH | 291.12 | 2,037.84 | 500.00 | 3,500.00 | 900.00 | 6,300.00 | 1,000.00 | 7,000.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 6,840 | LNFT | 1.65 | 11,286.00 | 4.00 | 27,360.00 | 4.00 | 27,360.00 | 2.00 | 13,680.00 |
| 0011 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 4,300.00 | 4,300.00 | 4,000.00 | 4,000.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 |
| 0012 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 12,967.3 | SQYD | 19.93 | 258,438.29 | 21.00 | 272,313.30 | 26.00 | 337,149.80 | 19.00 | 246,378.70 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 183.8 | TON | 263.22 | 48,379.84 | 275.00 | 50,545.00 | 250.00 | 45,950.00 | 250.00 | 45,950.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 68.38 | 3,419.00 | 40.00 | 2,000.00 | 100.00 | 5,000.00 | 50.00 | 2,500.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 2,816.4 | TON | 135.29 | 381,030.76 | 140.00 | 394,296.00 | 120.00 | 337,968.00 | 175.00 | 492,870.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 216.4 | TON | 135.29 | 29,276.76 | 150.00 | 32,460.00 | 125.00 | 27,050.00 | 200.00 | 43,280.00 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 8,443 | SQYD | 2.44 | 20,600.92 | 3.50 | 29,550.50 | 6.00 | 50,658.00 | 2.50 | 21,107.50 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -704 | CUYD | 0.01 | -7.04 | 7.75 | -5,456.00 | 0.01 | -7.04 | 0.00 | 0.00 |
| 0019 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 134 | LNFT | 108.66 | 14,560.44 | 60.00 | 8,040.00 | 160.00 | 21,440.00 | 108.00 | 14,472.00 |
| 0020 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 252 | LNFT | 259.80 | 65,469.60 | 400.00 | 100,800.00 | 350.00 | 88,200.00 | 545.00 | 137,340.00 |
| 0021 | 704-03-00100 | Blocked Out Guard Rail | 312.5 | LNFT | 24.71 | 7,721.88 | 30.00 | 9,375.00 | 20.00 | 6,250.00 | 22.00 | 6,875.00 |
| 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 88.24 | 8,824.00 | 100.00 | 10,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 |
| 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,647.06 | 10,588.24 | 3,000.00 | 12,000.00 | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 |
| 0024 | 705-01-00100 | Barbed Wire Fence | 102 | LNFT | 17.65 | 1,800.30 | 9.00 | 918.00 | 15.00 | 1,530.00 | 10.00 | 1,020.00 |
| 0025 | 708-01-00100 | Right-of-Way Monument | 24 | EACH | 164.71 | 3,953.04 | 250.00 | 6,000.00 | 500.00 | 12,000.00 | 200.00 | 4,800.00 |
| 0026 | 708-02-00100 | Right-of-Way Monument Witness Post | 24 | EACH | 58.82 | 1,411.68 | 200.00 | 4,800.00 | 150.00 | 3,600.00 | 100.00 | 2,400.00 |
| 0027 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 134 | SQYD | 63.53 | 8,513.02 | 65.00 | 8,710.00 | 70.00 | 9,380.00 | 80.00 | 10,720.00 |
| 0028 | 711-04-00100 | Geotextile Fabric | 134 | SQYD | 7.29 | 976.86 | 3.50 | 469.00 | 3.25 | 435.50 | 5.00 | 670.00 |
| 0029 | 712-04-00100 | Flexible Revetment | 622 | SQYD | 52.94 | 32,928.68 | 55.00 | 34,210.00 | 75.00 | 46,650.00 | 75.00 | 46,650.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,323.53 | 16,323.53 | 35,000.00 | 35,000.00 | 8,500.00 | 8,500.00 | 20,000.00 | 20,000.00 |
| 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.316 | MILE | 823.53 | 1,907.30 | 1,000.00 | 2,316.00 | 325.00 | 752.70 | 1,500.00 | 3,474.00 |
| 0032 | 716-01-00100 | Mulch (Vegetative) | 26.6 | TON | 647.06 | 17,211.80 | 600.00 | 15,960.00 | 600.00 | 15,960.00 | 850.00 | 22,610.00 |
| 0033 | 717-01-00100 | Seeding | 532 | LB | 9.41 | 5,006.12 | 10.00 | 5,320.00 | 8.00 | 4,256.00 | 12.00 | 6,384.00 |
| 0034 | 718-01-00100 | Fertilizer | 13,300 | LB | 0.58 | 7,714.00 | 1.00 | 13,300.00 | 0.50 | 6,650.00 | 0.75 | 9,975.00 |
| 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,344 | SQYD | 1.41 | 3,305.04 | 1.00 | 2,344.00 | 1.25 | 2,930.00 | 4.50 | 10,548.00 |
| 0036 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 11,058.82 | 11,058.82 | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 10,000.00 | 10,000.00 |
| 0037 | 726-01-00100 | Bedding Material | 48.1 | CUYD | 78.96 | 3,797.98 | 75.00 | 3,607.50 | 125.00 | 6,012.50 | 100.00 | 4,810.00 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 203,588.24 | 203,588.24 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | 325,000.00 | 325,000.00 |
| 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 88.24 | 352.96 | 100.00 | 400.00 | 75.00 | 300.00 | 100.00 | 400.00 |
| 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 129.41 | 517.64 | 125.00 | 500.00 | 75.00 | 300.00 | 100.00 | 400.00 |
| 0041 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 176 | EACH | 14.12 | 2,485.12 | 15.00 | 2,640.00 | 10.00 | 1,760.00 | 20.00 | 3,520.00 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 164 | EACH | 5.88 | 964.32 | 6.00 | 984.00 | 6.50 | 1,066.00 | 10.00 | 1,640.00 |
| 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.503 | MILE | 3,058.82 | 7,656.23 | 3,000.00 | 7,509.00 | 3,000.00 | 7,509.00 | 3,500.00 | 8,760.50 |
| 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,823.53 | 22,823.53 | 30,000.00 | 30,000.00 | 8,500.00 | 8,500.00 | 28,000.00 | 28,000.00 |
| 0045 | 804-01-00600 | Precast Concrete Piles (24") | 4,960 | LNFT | 176.50 | 875,440.00 | 150.00 | 744,000.00 | 77.00 | 381,920.00 | 135.00 | 669,600.00 |
| 0046 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 11,176.47 | 11,176.47 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 1.00 | 1.00 |
| 0047 | 804-13-00100 | Precast Concrete Indicator Piles (24") | 1 | EACH | 8,823.53 | 8,823.53 | 10,000.00 | 10,000.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 |
| 0048 | 804-17-00100 | Dynamic Monitoring | 8 | EACH | 588.24 | 4,705.92 | 1,500.00 | 12,000.00 | 3,500.00 | 28,000.00 | 500.00 | 4,000.00 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 275.28 | CUYD | 632.07 | 173,996.23 | 600.00 | 165,168.00 | 1,070.00 | 294,549.60 | 1,000.00 | 275,280.00 |
| 0050 | 805-03-00100 | Class AA Concrete | 547.95 | CUYD | 532.02 | 291,520.36 | 700.00 | 383,565.00 | 875.00 | 479,456.25 | 800.00 | 438,360.00 |
| 0051 | 806-01-00100 | Deformed Reinforcing Steel | 153,435 | LB | 0.87 | 133,488.45 | 2.00 | 306,870.00 | 0.90 | 138,091.50 | 0.88 | 135,022.80 |
| 0052 | 810-01-00100 | Concrete Railing (Standard Barrier) | 600 | LNFT | 102.02 | 61,212.00 | 100.00 | 60,000.00 | 70.00 | 42,000.00 | 80.00 | 48,000.00 |
| 0053 | 813-01-00100 | Concrete Approach Slabs | 364.44 | SQYD | 148.87 | 54,254.18 | 250.00 | 91,110.00 | 220.00 | 80,176.80 | 255.00 | 92,932.20 |
| 0054 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.989 | MILE | 8,647.06 | 8,551.94 | 12,000.00 | 11,868.00 | 7,000.00 | 6,923.00 | 12,500.00 | 12,362.50 |
| CONTRACTOR TOTAL | 3,788,856.69 | 3,793,537.50 | 3,806,119.21 | 3,985,286.20 | ||||||||