Bid Tabulations
Letting of
02/23/2011
LA DOTD Headquarters
| Lead Project: 001-04-0036 | |
| Parish: Webster | |
| Routes: US 80 | |
| Description: 0.79 MI. W. OF W. JCT. US 371-1.644 MI. E. OF W. JCT. US 371 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,611,098.22 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,496,921.83 |
| 2 | 17464 | Benton & Brown, LLC. | $1,649,616.61 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Benton & Brown, LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 1,019 | LNFT | 5.50 | 5,604.50 | 4.25 | 4,330.75 |
| 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 3,500.00 | 3,500.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,800 | CUYD | 1.50 | 5,700.00 | 19.00 | 72,200.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 420 | CUYD | 10.00 | 4,200.00 | 35.00 | 14,700.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 12,842.8 | TON | 80.00 | 1,027,424.00 | 90.00 | 1,155,852.00 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 835 | TON | 60.00 | 50,100.00 | 90.00 | 75,150.00 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 27,743 | SQYD | 2.00 | 55,486.00 | 2.00 | 55,486.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -714 | CUYD | 0.10 | -71.40 | 0.01 | -7.14 |
| 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 150 | SQYD | 45.00 | 6,750.00 | 67.50 | 10,125.00 |
| 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 85.00 | 21,250.00 | 90.00 | 22,500.00 |
| 0011 | 510-03-00100 | Pavement Joint Repair | 100 | TON | 65.00 | 6,500.00 | 275.00 | 27,500.00 |
| 0012 | 704-03-00100 | Blocked Out Guard Rail | 287.5 | LNFT | 17.50 | 5,031.25 | 26.00 | 7,475.00 |
| 0013 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 150 | LNFT | 34.00 | 5,100.00 | 55.00 | 8,250.00 |
| 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 54.00 | 10,800.00 | 75.00 | 15,000.00 |
| 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,000.00 | 16,000.00 | 2,500.00 | 20,000.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 82,000.00 | 82,000.00 | 30,000.00 | 30,000.00 |
| 0017 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 7,548 | LNFT | 0.01 | 75.48 | 0.25 | 1,887.00 |
| 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 920 | LNFT | 0.01 | 9.20 | 1.00 | 920.00 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5 | MILE | 325.00 | 1,625.00 | 350.00 | 1,750.00 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.5 | MILE | 1.00 | 1.50 | 530.00 | 795.00 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21 | MILE | 1.00 | 21.00 | 625.00 | 13,125.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 15.5 | TON | 600.00 | 9,300.00 | 1,100.00 | 17,050.00 |
| 0023 | 717-01-00100 | Seeding | 320 | LB | 10.00 | 3,200.00 | 7.30 | 2,336.00 |
| 0024 | 718-01-00100 | Fertilizer | 8,000 | LB | 0.50 | 4,000.00 | 0.45 | 3,600.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 82,000.00 | 82,000.00 | 30,000.00 | 30,000.00 |
| 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 115.00 | 920.00 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 995 | EACH | 4.50 | 4,477.50 | 5.00 | 4,975.00 |
| 0028 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,774 | LNFT | 1.00 | 3,774.00 | 1.05 | 3,962.70 |
| 0029 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 460 | LNFT | 3.00 | 1,380.00 | 5.50 | 2,530.00 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.014 | MILE | 2,500.00 | 25,035.00 | 2,400.00 | 24,033.60 |
| 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.651 | MILE | 800.00 | 520.80 | 1,100.00 | 716.10 |
| 0032 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.03 | MILE | 2,500.00 | 75.00 | 1,300.00 | 39.00 |
| 0033 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.174 | MILE | 5,000.00 | 870.00 | 2,400.00 | 417.60 |
| 0034 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 10 | EACH | 250.00 | 2,500.00 | 180.00 | 1,800.00 |
| 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 10 | EACH | 250.00 | 2,500.00 | 200.00 | 2,000.00 |
| 0036 | 735-01-00100 | Mailboxes | 53 | EACH | 1.00 | 53.00 | 1.00 | 53.00 |
| 0037 | 735-02-00100 | Mailbox Supports (Single) | 25 | EACH | 118.00 | 2,950.00 | 125.00 | 3,125.00 |
| 0038 | 735-03-00100 | Mailbox Supports (Double) | 14 | EACH | 170.00 | 2,380.00 | 180.00 | 2,520.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 |
| 0040 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 300.00 | 300.00 | 1,000.00 | 1,000.00 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,200 | INLF | 2.00 | 2,400.00 | 2.50 | 3,000.00 |
| CONTRACTOR TOTAL | 1,496,921.83 | 1,649,616.61 | ||||||