| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
4,667   |
SQYD |
7.00 |
32,669.00 |
12.00 |
56,004.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks and drives
|
1,806   |
SQYD |
6.00 |
10,836.00 |
12.00 |
21,672.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
22,136.0 |
LNFT |
2.00 |
44,272.00 |
12.00 |
265,632.00 |
|
|
|
|
| 203-01 |
general excavation
|
7,504   |
CUYD |
15.00 |
112,560.00 |
15.00 |
112,560.00 |
|
|
|
|
| 203-05 |
nonplastic embankment
|
50   |
CUYD |
60.00 |
3,000.00 |
15.00 |
750.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular measurement) (selected soils)
|
1,230   |
CUYD |
7.00 |
8,610.00 |
50.00 |
61,500.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
595   |
EACH |
8.00 |
4,760.00 |
9.00 |
5,355.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
8,400   |
LNFT |
1.00 |
8,400.00 |
2.00 |
16,800.00 |
|
|
|
|
| 302-02-A-01 |
class ii base course (6" thick) (stone)
|
12,395.6 |
SQYD |
20.00 |
247,912.00 |
17.00 |
210,725.20 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
270.0 |
CUYD |
76.00 |
20,520.00 |
50.00 |
13,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,851.8 |
TON |
84.00 |
1,079,551.20 |
93.00 |
1,195,217.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,632.1 |
TON |
84.00 |
305,096.40 |
93.00 |
337,785.30 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
61,086   |
SQYD |
3.00 |
183,258.00 |
3.00 |
183,258.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
6,863   |
LNFT |
1.70 |
11,667.10 |
1.80 |
12,353.40 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
6,863   |
LNFT |
2.20 |
15,098.60 |
2.30 |
15,784.90 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
7,632   |
LNFT |
3.70 |
28,238.40 |
4.00 |
30,528.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rpvccp)
|
164   |
LNFT |
100.00 |
16,400.00 |
100.00 |
16,400.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
900   |
LNFT |
20.00 |
18,000.00 |
10.00 |
9,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
27   |
EACH |
1,200.00 |
32,400.00 |
500.00 |
13,500.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
283.2 |
SQYD |
65.00 |
18,408.00 |
70.00 |
19,824.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
856.7 |
SQYD |
70.00 |
59,969.00 |
80.00 |
68,536.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
69.9 |
SQYD |
75.00 |
5,242.50 |
80.00 |
5,592.00 |
|
|
|
|
| 706-02-E |
concrete drive (8" thick)
|
234.2 |
SQYD |
80.00 |
18,736.00 |
90.00 |
21,078.00 |
|
|
|
|
| 707-03 |
combination concrete curb and gutter
|
22,136.0 |
LNFT |
25.00 |
553,400.00 |
24.00 |
531,264.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
698   |
LNFT |
1.00 |
698.00 |
1.20 |
837.60 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
3.614 |
MILE |
400.00 |
1,445.60 |
400.00 |
1,445.60 |
|
|
|
|
| 717-01 |
seeding
|
403   |
LB |
8.00 |
3,224.00 |
9.00 |
3,627.00 |
|
|
|
|
| 718-01 |
fertilizer
|
6,695   |
LB |
0.25 |
1,673.75 |
0.30 |
2,008.50 |
|
|
|
|
| 723-01 |
granular material (net section)
|
1,010   |
CUYD |
45.00 |
45,450.00 |
20.00 |
20,200.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
431,000.00 |
431,000.00 |
360,000.00 |
360,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
527   |
EACH |
5.50 |
2,898.50 |
6.00 |
3,162.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
4,273   |
LNFT |
0.65 |
2,777.45 |
0.70 |
2,991.10 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,421   |
LNFT |
1.25 |
1,776.25 |
1.30 |
1,847.30 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
947   |
LNFT |
1.80 |
1,704.60 |
2.00 |
1,894.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,173   |
LNFT |
3.50 |
4,105.50 |
4.00 |
4,692.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.949 |
MILE |
2,500.00 |
17,372.50 |
2,500.00 |
17,372.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
3.571 |
MILE |
1,000.00 |
3,571.00 |
1,100.00 |
3,928.10 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
175.00 |
1,925.00 |
200.00 |
2,200.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
5   |
EACH |
225.00 |
1,125.00 |
250.00 |
1,250.00 |
|
|
|
|
| 732-04-E-01 |
plastic pavement legends & symbols (school)(modified
as per nodpw std 10) |
2   |
EACH |
460.00 |
920.00 |
500.00 |
1,000.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.586 |
MILE |
5,800.00 |
3,398.80 |
6,000.00 |
3,516.00 |
|
|
|
|
| 736-09 |
loop detector
|
970   |
LNFT |
12.00 |
11,640.00 |
14.00 |
13,580.00 |
|
|
|
|
| 737-01-A |
painted traffic striping (solid line) (4" width)
|
1.561 |
MILE |
1,000.00 |
1,561.00 |
1,100.00 |
1,717.10 |
|
|
|
|
| 737-02-A |
painted traffic striping (broken line) (4" width)
|
0.780 |
MILE |
400.00 |
312.00 |
440.00 |
343.20 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-003 |
remove and replace existing bus shelter & incidentals
|
1   |
EACH |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-004 |
roadway reinforcing mesh (complete road system)
|
56,207   |
SQYD |
6.00 |
337,242.00 |
6.00 |
337,242.00 |
|
|
|
|
| S-005 |
roadway joint reinforcing mesh (detail repair system)
|
9,399   |
LNFT |
2.50 |
23,497.50 |
3.00 |
28,197.00 |
|
|
|
|
| S-007 |
cleaning and shagging with mortar existing drainage
structures(dmh,cb,di) |
21   |
EACH |
800.00 |
16,800.00 |
500.00 |
10,500.00 |
|
|
|
|
| S-009 |
adjusting drain structures (catch basins and drop
inlets) type a |
51   |
EACH |
700.00 |
35,700.00 |
600.00 |
30,600.00 |
|
|
|
|
| S-010 |
adjusting drain structures (catch basins and drop
inlets) type b |
6   |
EACH |
1,200.00 |
7,200.00 |
800.00 |
4,800.00 |
|
|
|
|
| S-011 |
9" thick concrete pavement patching
|
3,683   |
SQYD |
100.00 |
368,300.00 |
80.00 |
294,640.00 |
|
|
|
|
| S-012 |
tree trimming
|
lump |
LUMP |
14,000.00 |
14,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-013 |
root pruning
|
44   |
EACH |
145.00 |
6,380.00 |
180.00 |
7,920.00 |
|
|
|
|
| S-014 |
signs
|
79   |
EACH |
200.00 |
15,800.00 |
250.00 |
19,750.00 |
|
|
|
|
| S-015 |
drain manholes
|
3   |
EACH |
4,000.00 |
12,000.00 |
3,500.00 |
10,500.00 |
|
|
|
|
| S-016 |
mountable (rollover) catch basin
|
2   |
EACH |
4,500.00 |
9,000.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| S-018 |
sodding
|
1,830   |
SQYD |
7.00 |
12,810.00 |
9.00 |
16,470.00 |
|
|
|
|
| S-019 |
full depth saw cutting
|
29,608.0 |
LNFT |
12.50 |
370,100.00 |
10.00 |
296,080.00 |
|
|
|
|
| S-020 |
10" thick concrete bus pad
|
984   |
SQYD |
170.00 |
167,280.00 |
100.00 |
98,400.00 |
|
|
|
|
| S-021 |
adjusting gas valve boxes (ci)
|
1   |
EACH |
300.00 |
300.00 |
500.00 |
500.00 |
|
|
|
|
| S-022 |
adjusting gas manholes
|
2   |
EACH |
900.00 |
1,800.00 |
500.00 |
1,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,887,292.65 |
|
5,083,830.20 |
|
|
|
|
|