| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FLEMING CONSTRUCTION CO., INC. |
- 2 - B & K CONSTRUCTION CO. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
2,401   |
SQYD |
14.00 |
33,614.00 |
12.00 |
28,812.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
307   |
SQYD |
10.00 |
3,070.00 |
9.00 |
2,763.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
110   |
LNFT |
10.00 |
1,100.00 |
4.50 |
495.00 |
|
|
|
|
| 203-01-A |
general excavation (canal)
|
672   |
CUYD |
20.00 |
13,440.00 |
26.00 |
17,472.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
4,926   |
CUYD |
15.00 |
73,890.00 |
26.00 |
128,076.00 |
|
|
|
|
| 203-05-A |
nonplastic embankment(vehicular measurement)
|
4,639   |
CUYD |
25.00 |
115,975.00 |
14.00 |
64,946.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
15.00 |
420.00 |
11.00 |
308.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
250.00 |
1,000.00 |
700.00 |
2,800.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
50   |
LNFT |
10.00 |
500.00 |
3.50 |
175.00 |
|
|
|
|
| 302-02-A-01 |
class ii base course(6"thick)(stone or recycled
portland cement concrete) |
3,455.0 |
SQYD |
22.00 |
76,010.00 |
19.00 |
65,645.00 |
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
3,000.6 |
SQYD |
68.00 |
204,040.80 |
64.00 |
192,038.40 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
5   |
EACH |
130.00 |
650.00 |
200.00 |
1,000.00 |
|
|
|
|
| 602-05-U-04 |
full depth patching of jointed conc pvmt(unknown
thickness)(unknown size) |
300.0 |
SQYD |
100.00 |
30,000.00 |
150.00 |
45,000.00 |
|
|
|
|
| 701-10-E |
reinforced concrete pipe (extension)(12")
|
8   |
LNFT |
460.00 |
3,680.00 |
275.00 |
2,200.00 |
|
|
|
|
| 701-10-F |
reinforced concrete pipe (extension)(15")
|
54   |
LNFT |
366.00 |
19,764.00 |
205.00 |
11,070.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
285.00 |
2,280.00 |
346.00 |
2,768.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
16   |
LNFT |
325.00 |
5,200.00 |
343.00 |
5,488.00 |
|
|
|
|
| 706-01-A-01 |
concrete walk (4" thick)(w/welded wire fabric)
|
17.8 |
SQYD |
220.00 |
3,916.00 |
50.00 |
890.00 |
|
|
|
|
| 706-03-A-01 |
incidental concrete paving (4" thick)(w/welded wire
fabric) |
1,329.9 |
SQYD |
55.00 |
73,144.50 |
50.00 |
66,495.00 |
|
|
|
|
| 707-01 |
concrete curb
|
2,217.4 |
LNFT |
10.00 |
22,174.00 |
16.00 |
35,478.40 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,370.00 |
9,370.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
140   |
LNFT |
6.00 |
840.00 |
2.00 |
280.00 |
|
|
|
|
| 714-01 |
slab sodding
|
107   |
SQYD |
10.00 |
1,070.00 |
8.00 |
856.00 |
|
|
|
|
| 717-01 |
seeding
|
11   |
LB |
100.00 |
1,100.00 |
50.00 |
550.00 |
|
|
|
|
| 718-01 |
fertilizer
|
423   |
LB |
4.00 |
1,692.00 |
1.00 |
423.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
2,020.7 |
CUYD |
85.00 |
171,759.50 |
90.00 |
181,863.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
78,000.00 |
78,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 736-09 |
loop detector
|
74   |
LNFT |
25.00 |
1,850.00 |
15.00 |
1,110.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
4,500.00 |
4,500.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 805-01 |
class a concrete
|
812.13 |
CUYD |
455.00 |
369,519.15 |
700.00 |
568,491.00 |
|
|
|
|
| 805-01-I |
class a concrete(maintenance slab)
|
40.98 |
CUYD |
1,060.00 |
43,438.80 |
320.00 |
13,113.60 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
115,517   |
LB |
0.77 |
88,948.09 |
1.00 |
115,517.00 |
|
|
|
|
| S-001 |
dam removal and replacement(first five (5) occurences)
|
lump |
LUMP |
4,500.00 |
4,500.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| S-002 |
dam removal and replacement(each additional occurence)
|
lump |
LUMP |
1,900.00 |
1,900.00 |
3,800.00 |
3,800.00 |
|
|
|
|
| S-003 |
initial installation and final removal of dams
|
lump |
LUMP |
21,000.00 |
21,000.00 |
82,000.00 |
82,000.00 |
|
|
|
|
| S-004 |
temporary sheeting and bracing system
|
lump |
LUMP |
150,000.00 |
150,000.00 |
805,000.00 |
805,000.00 |
|
|
|
|
| S-005 |
geotextile fabric (class d)
|
9,612   |
SQYD |
1.25 |
12,015.00 |
2.00 |
19,224.00 |
|
|
|
|
| S-006 |
adjusting water lines (12" cast iron)
(non-participating pay item) |
110   |
lnft |
125.00 |
13,750.00 |
250.00 |
27,500.00 |
|
|
|
|
| S-007 |
adjusting water lines (12" transite)(non-participating
pay item) |
80   |
lnft |
165.00 |
13,200.00 |
209.00 |
16,720.00 |
|
|
|
|
| S-008 |
saw cutting (full depth)
|
6,588   |
LNFT |
9.00 |
59,292.00 |
10.00 |
65,880.00 |
|
|
|
|
| S-009 |
vibration monitoring
|
lump |
LUMP |
1,800.00 |
1,800.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-010 |
police traffic control (non-participating pay item)
|
32   |
hour |
40.00 |
1,280.00 |
46.00 |
1,472.00 |
|
|
|
|
| S-011 |
temporary traffic signal system(non-participating pay
item) |
lump |
LUMP |
55,000.00 |
55,000.00 |
79,961.61 |
79,961.61 |
|
|
|
|
| S-012 |
permanent traffic signal system(non-participating pay
item) |
lump |
LUMP |
209,000.00 |
209,000.00 |
302,884.61 |
302,884.61 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,057,692.84 |
|
3,362,565.62 |
|
|
|
|
|