| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
10.00 |
2,000.00 |
35.00 |
7,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
436.1 |
TON |
102.00 |
44,482.20 |
115.00 |
50,151.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
29.3 |
TON |
220.00 |
6,446.00 |
115.00 |
3,369.50 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
64   |
LNFT |
150.00 |
9,600.00 |
165.00 |
10,560.00 |
|
|
|
|
| 711-03-C |
riprap (30 lb)
|
10   |
TON |
100.00 |
1,000.00 |
100.00 |
1,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
25   |
SQYD |
150.00 |
3,750.00 |
70.00 |
1,750.00 |
|
|
|
|
| 724-02 |
pavement widening
|
1,705.0 |
SQYD |
57.00 |
97,185.00 |
65.00 |
110,825.00 |
|
|
|
|
| 726-01 |
bedding material
|
28.0 |
CUYD |
135.00 |
3,780.00 |
100.00 |
2,800.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
44,000.00 |
44,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
80.00 |
160.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
350   |
EACH |
5.50 |
1,925.00 |
6.00 |
2,100.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
75   |
LNFT |
1.00 |
75.00 |
1.00 |
75.00 |
|
|
|
|
| 732-01-C-04 |
plastic pavement striping (8" width)(dashed)
|
255   |
LNFT |
1.00 |
255.00 |
1.00 |
255.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
263   |
LNFT |
3.00 |
789.00 |
3.00 |
789.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.756 |
MILE |
2,500.00 |
1,890.00 |
3,000.00 |
2,268.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
200.00 |
200.00 |
200.00 |
200.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
200.00 |
200.00 |
200.00 |
200.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
0.4 |
MILE |
8,750.00 |
3,500.00 |
10,000.00 |
4,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
242,477.20 |
|
253,503.00 |
|
|
|
|
|