| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
480   |
LNFT |
5.00 |
2,400.00 |
6.00 |
2,880.00 |
|
|
|
|
| 202-02-I |
removal of bridge ballast
|
1   |
EACH |
8,500.00 |
8,500.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 202-02-J |
removal of cross drain pipe
|
1   |
EACH |
8,500.00 |
8,500.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
695   |
CUYD |
13.00 |
9,035.00 |
18.00 |
12,510.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,459   |
CUYD |
13.00 |
18,967.00 |
19.00 |
27,721.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
16.00 |
640.00 |
17.00 |
680.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
140   |
LNFT |
6.00 |
840.00 |
5.50 |
770.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
500   |
SQYD |
0.10 |
50.00 |
10.00 |
5,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,979.0 |
TON |
60.00 |
358,740.00 |
50.00 |
298,950.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
382.0 |
TON |
60.00 |
22,920.00 |
99.00 |
37,818.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
624   |
LNFT |
85.00 |
53,040.00 |
300.00 |
187,200.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
64   |
LNFT |
140.00 |
8,960.00 |
400.00 |
25,600.00 |
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
268   |
LNFT |
200.00 |
53,600.00 |
600.00 |
160,800.00 |
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
144   |
LNFT |
100.00 |
14,400.00 |
300.00 |
43,200.00 |
|
|
|
|
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
64   |
LNFT |
235.00 |
15,040.00 |
600.00 |
38,400.00 |
|
|
|
|
| 701-02-R |
cross drain pipe arch (108" equiv. rcpa)
|
64   |
LNFT |
1,000.00 |
64,000.00 |
1,500.00 |
96,000.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
444.0 |
LNFT |
33.00 |
14,652.00 |
33.00 |
14,652.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
18.00 |
1,575.00 |
18.00 |
1,575.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
75.00 |
7,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,950.00 |
7,800.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
25.00 |
1,000.00 |
20.00 |
800.00 |
|
|
|
|
| 711-03-D |
riprap (55 lb)
|
1.5 |
TON |
200.00 |
300.00 |
500.00 |
750.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
44   |
LNFT |
1.00 |
44.00 |
0.67 |
29.48 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.140 |
MILE |
1.00 |
8.14 |
145.00 |
1,180.30 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.300 |
MILE |
1.00 |
3.30 |
330.00 |
1,089.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
28.080 |
MILE |
1.00 |
28.08 |
600.00 |
16,848.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
500.00 |
500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
127.1 |
CUYD |
50.00 |
6,355.00 |
55.00 |
6,990.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
70,000.00 |
70,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
57   |
EACH |
72.00 |
4,104.00 |
72.00 |
4,104.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
540   |
EACH |
6.00 |
3,240.00 |
5.00 |
2,700.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.25 |
71.50 |
2.67 |
58.74 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.040 |
MILE |
2,450.00 |
34,398.00 |
2,400.00 |
33,696.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.650 |
MILE |
850.00 |
1,402.50 |
800.00 |
1,320.00 |
|
|
|
|
| 735-01 |
mailboxes
|
20   |
EACH |
6.00 |
120.00 |
5.00 |
100.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
135.00 |
2,700.00 |
130.00 |
2,600.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.47 |
ACRE |
2,000.00 |
2,940.00 |
1,800.00 |
2,646.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
cement treated base course (12 inch depth)
|
56,614   |
SQYD |
5.50 |
311,377.00 |
5.00 |
283,070.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,175,250.52 |
|
1,526,238.02 |
|
|
|
|
|