Letting of 3/29/2006 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 853-05-0006
Parish: TANGIPAHOA
Routes: LA 1050
Description: JUNCTION ROUTE LA 1051 - JUNCTION ROUTE LA 38
Type Const: grading, drainage structures, cement treated base course, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $975,737.03
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $1,175,250.52
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,526,238.02
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 480      LNFT 5.00 2,400.00 6.00 2,880.00        
202-02-I removal of bridge ballast 1      EACH 8,500.00 8,500.00 7,000.00 7,000.00        
202-02-J removal of cross drain pipe 1      EACH 8,500.00 8,500.00 7,000.00 7,000.00        
203-08 borrow (vehicular measurement) 695      CUYD 13.00 9,035.00 18.00 12,510.00        
203-08-A borrow (vehicular meas.)(selected soils) 1,459      CUYD 13.00 18,967.00 19.00 27,721.00        
204-02 temporary hay or straw bales 40      EACH 16.00 640.00 17.00 680.00        
204-06 temporary silt fencing 140      LNFT 6.00 840.00 5.50 770.00        
303-02 removal of existing patches 500      SQYD 0.10 50.00 10.00 5,000.00        
502-01 superpave asphaltic concrete 5,979.0    TON 60.00 358,740.00 50.00 298,950.00        
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
382.0    TON 60.00 22,920.00 99.00 37,818.00        
701-01-I cross drain pipe (24" rcp/pcp) 624      LNFT 85.00 53,040.00 300.00 187,200.00        
701-01-M cross drain pipe (36" rcp/pcp) 64      LNFT 140.00 8,960.00 400.00 25,600.00        
701-01-Q cross drain pipe (60" rcp/pcp) 268      LNFT 200.00 53,600.00 600.00 160,800.00        
701-02-D cross drain pipe arch (24" equiv. rcpa) 144      LNFT 100.00 14,400.00 300.00 43,200.00        
701-02-J cross drain pipe arch (60" equiv. rcpa) 64      LNFT 235.00 15,040.00 600.00 38,400.00        
701-02-R cross drain pipe arch (108" equiv. rcpa) 64      LNFT 1,000.00 64,000.00 1,500.00 96,000.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 444.0    LNFT 33.00 14,652.00 33.00 14,652.00        
704-03 blocked out guard rail 87.5    LNFT 18.00 1,575.00 18.00 1,575.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 50.00 5,000.00 75.00 7,500.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,950.00 7,800.00 2,000.00 8,000.00        
707-04 asphaltic curb 40.0    LNFT 25.00 1,000.00 20.00 800.00        
711-03-D riprap (55 lb) 1.5    TON 200.00 300.00 500.00 750.00        
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 10,000.00 10,000.00        
713-03-E temporary pavement markings (24" width) 44      LNFT 1.00 44.00 0.67 29.48        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.140  MILE 1.00 8.14 145.00 1,180.30        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
3.300  MILE 1.00 3.30 330.00 1,089.00        
713-05-A temporary pavement markings (solid line)(4" width) 28.080  MILE 1.00 28.08 600.00 16,848.00        
722-01 project site laboratory 1      EACH 500.00 500.00 5,000.00 5,000.00        
726-01 bedding material 127.1    CUYD 50.00 6,355.00 55.00 6,990.50        
727-01 mobilization lump      LUMP 70,000.00 70,000.00 150,000.00 150,000.00        
729-16-C object marker assembly (type 3) 57      EACH 72.00 4,104.00 72.00 4,104.00        
731-02 reflectorized raised pavement markers 540      EACH 6.00 3,240.00 5.00 2,700.00        
732-01-E plastic pavement striping (24" width) 22      LNFT 3.25 71.50 2.67 58.74        
732-02-A plastic pavement striping (solid line) (4" width) 14.040  MILE 2,450.00 34,398.00 2,400.00 33,696.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.650  MILE 850.00 1,402.50 800.00 1,320.00        
735-01 mailboxes 20      EACH 6.00 120.00 5.00 100.00        
735-02 mailbox supports (single) 20      EACH 135.00 2,700.00 130.00 2,600.00        
739-01 hydro-seeding 1.47   ACRE 2,000.00 2,940.00 1,800.00 2,646.00        
740-01 construction layout lump      LUMP 13,000.00 13,000.00 10,000.00 10,000.00        
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 10,000.00 10,000.00        
S-001 cement treated base course (12 inch depth) 56,614      SQYD 5.50 311,377.00 5.00 283,070.00        
                       
 CONTRACTOR TOTAL       1,175,250.52   1,526,238.02