| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
300   |
CUYD |
8.00 |
2,400.00 |
15.00 |
4,500.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)(selected soils)
|
100   |
CUYD |
8.00 |
800.00 |
15.00 |
1,500.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
5.00 |
250.00 |
5.00 |
250.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
30.00 |
3,000.00 |
45.00 |
4,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,914.5 |
TON |
60.00 |
354,870.00 |
66.00 |
390,357.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
470.0 |
TON |
60.00 |
28,200.00 |
100.00 |
47,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
24,781   |
SQYD |
2.00 |
49,562.00 |
1.50 |
37,171.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 752   |
CUYD |
10.00 |
- 7,520.00 |
FREE |
FREE |
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.100 |
MILE |
135.00 |
688.50 |
170.00 |
867.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.620 |
MILE |
2.00 |
7.24 |
10.00 |
36.20 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
13.500 |
MILE |
3.00 |
40.50 |
10.00 |
135.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
58,000.00 |
58,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
350   |
EACH |
5.50 |
1,925.00 |
6.20 |
2,170.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.750 |
MILE |
2,400.00 |
16,200.00 |
3,500.00 |
23,625.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.810 |
MILE |
800.00 |
1,448.00 |
1,200.00 |
2,172.00 |
|
|
|
|
| 735-01 |
mailboxes
|
21   |
EACH |
1.00 |
21.00 |
5.00 |
105.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
21   |
EACH |
120.00 |
2,520.00 |
200.00 |
4,200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
3,100.00 |
3,100.00 |
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
31,035   |
SQYD |
9.00 |
279,315.00 |
7.10 |
220,348.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
802,727.24 |
|
810,037.20 |
|
|
|
|
|