Lead Project: 804-14-0009
Parish: ASSUMPTION
Routes: LA 1010
Description: 2.51 MILES WEST OF LA 1 - LA 1
Type Const: grading, cement treated base course, cold planing asph pavement, superpave asph
concrete overlay and related work.
Estimated Construction Cost: $685,090.68
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $809,966.70
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $827,543.82
3 06487 HUEY STOCKSTILL, INC. $850,013.35
4 00046 BARBER BROS. CONTRACTING CO., L.L.C $900,869.60
5 00481 COASTAL BRIDGE CO., L.L.C. $931,047.79
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
HUEY STOCKSTILL, INC.
- 4 -
BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 47      SQYD 10.00 470.00 15.00 705.00 100.00 4,700.00 30.00 1,410.00
203-08-A borrow (vehicular meas.)(selected soils) 1,800      CUYD 10.00 18,000.00 15.00 27,000.00 20.00 36,000.00 18.00 32,400.00
304-01 lime 28.38   TON 1.00 28.38 150.00 4,257.00 150.00 4,257.00 150.00 4,257.00
304-03-B lime treatment (type c) (8 1/2" thick) 810      SQYD 0.10 81.00 5.00 4,050.00 6.00 4,860.00 3.00 2,430.00
304-04-D lime treatment (type d) (12" thick) 1,620      SQYD 0.10 162.00 5.00 8,100.00 3.50 5,670.00 6.00 9,720.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,131      CUYD 20.00 22,620.00 15.00 16,965.00 55.00 62,205.00 24.00 27,144.00
502-01 superpave asphaltic concrete 5,952.8    TON 67.00 398,837.60 50.00 297,640.00 65.00 386,932.00 65.00 386,932.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
270.3    TON 67.00 18,110.10 100.00 27,030.00 120.00 32,436.00 100.00 27,030.00
509-01-A cold planing asphaltic pavement (2" average depth) 29,451      SQYD 2.00 58,902.00 1.50 44,176.50 1.25 36,813.75 2.50 73,627.50
509-02 contractor retained reclaimed asphaltic pavement - 818      CUYD 10.00 - 8,180.00 0.01 - 8.18 8.50 - 6,953.00 0.00 0.00
702-04-A adjusting manholes 1      EACH 200.00 200.00 750.00 750.00 1,000.00 1,000.00 500.00 500.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 55,000.00 55,000.00 6,000.00 6,000.00 28,000.00 28,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.530  MILE 100.00 753.00 500.00 3,765.00 50.00 376.50 300.00 2,259.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.054  MILE 0.10 0.71 100.00 705.40 10.00 70.54 400.00 2,821.60
713-05-A temporary pavement markings (solid line)(4" width) 2.066  MILE 0.10 0.21 100.00 206.60 10.00 20.66 800.00 1,652.80
722-01 project site laboratory 1      EACH 500.00 500.00 2,000.00 2,000.00 5,000.00 5,000.00 6,000.00 6,000.00
727-01 mobilization lump      LUMP 55,000.00 55,000.00 55,000.00 55,000.00 54,000.00 54,000.00 30,000.00 30,000.00
729-16-B object marker assembly (type 2) 4      EACH 85.00 340.00 45.00 180.00 100.00 400.00 75.00 300.00
731-02 reflectorized raised pavement markers 332      EACH 5.50 1,826.00 8.00 2,656.00 5.50 1,826.00 6.50 2,158.00
732-02-A plastic pavement striping (solid line) (4" width) 0.689  MILE 2,500.00 1,722.50 3,000.00 2,067.00 2,500.00 1,722.50 2,800.00 1,929.20
732-03-A plastic pavement striping (broken line)(4" width) 2.351  MILE 1,200.00 2,821.20 1,500.00 3,526.50 1,200.00 2,821.20 1,500.00 3,526.50
740-01 construction layout lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00 2,000.00 2,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 1,000.00 1,000.00 25,000.00 25,000.00 7,000.00 7,000.00 20,000.00 20,000.00
S-001 cement treated base course (12 in depth) 32,396      SQYD 7.00 226,772.00 7.00 226,772.00 6.20 200,855.20 7.00 226,772.00
                       
 CONTRACTOR TOTAL       809,966.70   827,543.82   850,013.35   900,869.60
 
Item Number Item Description Quantity Unit of Measure - 5 -
COASTAL BRIDGE CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 47      SQYD 40.00 1,880.00            
203-08-A borrow (vehicular meas.)(selected soils) 1,800      CUYD 5.00 9,000.00            
304-01 lime 28.38   TON 150.00 4,257.00            
304-03-B lime treatment (type c) (8 1/2" thick) 810      SQYD 2.70 2,187.00            
304-04-D lime treatment (type d) (12" thick) 1,620      SQYD 2.80 4,536.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
1,131      CUYD 68.00 76,908.00            
502-01 superpave asphaltic concrete 5,952.8    TON 65.50 389,908.40            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
270.3    TON 92.00 24,867.60            
509-01-A cold planing asphaltic pavement (2" average depth) 29,451      SQYD 2.00 58,902.00            
509-02 contractor retained reclaimed asphaltic pavement - 818      CUYD 1.22 - 997.96            
702-04-A adjusting manholes 1      EACH 750.00 750.00            
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.530  MILE 275.00 2,070.75            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.054  MILE 350.00 2,468.90            
713-05-A temporary pavement markings (solid line)(4" width) 2.066  MILE 750.00 1,549.50            
722-01 project site laboratory 1      EACH 5,500.00 5,500.00            
727-01 mobilization lump      LUMP 70,000.00 70,000.00            
729-16-B object marker assembly (type 2) 4      EACH 70.00 280.00            
731-02 reflectorized raised pavement markers 332      EACH 6.00 1,992.00            
732-02-A plastic pavement striping (solid line) (4" width) 0.689  MILE 2,600.00 1,791.40            
732-03-A plastic pavement striping (broken line)(4" width) 2.351  MILE 1,200.00 2,821.20            
740-01 construction layout lump      LUMP 45,000.00 45,000.00            
744-01 traffic control management lump      LUMP 11,000.00 11,000.00            
S-001 cement treated base course (12 in depth) 32,396      SQYD 6.00 194,376.00            
                       
 CONTRACTOR TOTAL       931,047.79