| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - R. E. HEIDT CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
509   |
LNFT |
4.00 |
2,036.00 |
5.00 |
2,545.00 |
10.00 |
5,090.00 |
11.45 |
5,828.05 |
| 203-08 |
borrow (vehicular measurement)
|
52   |
CUYD |
32.00 |
1,664.00 |
22.00 |
1,144.00 |
35.00 |
1,820.00 |
74.00 |
3,848.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,188   |
CUYD |
60.00 |
131,280.00 |
60.00 |
131,280.00 |
30.00 |
65,640.00 |
93.00 |
203,484.00 |
| 502-01 |
superpave asphaltic concrete
|
10,602.9 |
TON |
61.97 |
657,061.71 |
62.00 |
657,379.80 |
69.00 |
731,600.10 |
74.50 |
789,916.05 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
355.8 |
TON |
102.93 |
36,622.49 |
100.00 |
35,580.00 |
25.00 |
8,895.00 |
108.00 |
38,426.40 |
| 509-01 |
cold planing asphaltic pavement
|
1,365   |
SQYD |
15.92 |
21,730.80 |
5.00 |
6,825.00 |
16.00 |
21,840.00 |
4.35 |
5,937.75 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 26   |
CUYD |
0.10 |
- 2.60 |
1.00 |
- 26.00 |
0.01 |
- 0.26 |
1.00 |
- 26.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
32.49 |
3,249.00 |
33.00 |
3,300.00 |
34.00 |
3,400.00 |
33.00 |
3,300.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
266.0 |
LNFT |
47.16 |
12,544.56 |
48.00 |
12,768.00 |
50.00 |
13,300.00 |
47.70 |
12,688.20 |
| 704-03 |
blocked out guard rail
|
162.5 |
LNFT |
16.45 |
2,673.13 |
17.00 |
2,762.50 |
18.00 |
2,925.00 |
16.65 |
2,705.63 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,886.28 |
7,545.12 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
1,910.00 |
7,640.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,828.85 |
8,828.85 |
15,000.00 |
15,000.00 |
92,000.00 |
92,000.00 |
5,100.00 |
5,100.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.130 |
MILE |
130.29 |
668.39 |
400.00 |
2,052.00 |
400.00 |
2,052.00 |
275.00 |
1,410.75 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.130 |
MILE |
261.98 |
1,343.96 |
1.00 |
5.13 |
1.00 |
5.13 |
265.00 |
1,359.45 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.224 |
MILE |
523.47 |
2,211.14 |
1.00 |
4.22 |
1.00 |
4.22 |
530.00 |
2,238.72 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,430   |
SQYD |
69.39 |
99,227.70 |
81.00 |
115,830.00 |
56.00 |
80,080.00 |
68.00 |
97,240.00 |
| 724-02 |
pavement widening
|
1,385.6 |
SQYD |
44.83 |
62,116.45 |
66.00 |
91,449.60 |
48.50 |
67,201.60 |
47.50 |
65,816.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
32,732.63 |
32,732.63 |
40,000.00 |
40,000.00 |
67,000.00 |
67,000.00 |
33,000.00 |
33,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
36   |
EACH |
54.49 |
1,961.64 |
55.00 |
1,980.00 |
60.00 |
2,160.00 |
55.00 |
1,980.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.21 |
280.84 |
75.00 |
300.00 |
77.00 |
308.00 |
71.00 |
284.00 |
| 731-02 |
reflectorized raised pavement markers
|
679   |
EACH |
4.72 |
3,204.88 |
5.00 |
3,395.00 |
5.50 |
3,734.50 |
4.77 |
3,238.83 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.224 |
MILE |
2,460.31 |
10,392.35 |
2,500.00 |
10,560.00 |
2,600.00 |
10,982.40 |
2,500.00 |
10,560.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.130 |
MILE |
733.55 |
3,763.11 |
750.00 |
3,847.50 |
800.00 |
4,104.00 |
745.00 |
3,821.85 |
| 735-01 |
mailboxes
|
26   |
EACH |
17.14 |
445.64 |
2.00 |
52.00 |
5.00 |
130.00 |
1.06 |
27.56 |
| 735-02 |
mailbox supports (single)
|
26   |
EACH |
140.30 |
3,647.80 |
150.00 |
3,900.00 |
250.00 |
6,500.00 |
106.00 |
2,756.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
19,701.17 |
19,701.17 |
3,000.00 |
3,000.00 |
100.00 |
100.00 |
6,500.00 |
6,500.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
12,724.80 |
12,724.80 |
35,000.00 |
35,000.00 |
100.00 |
100.00 |
22,000.00 |
22,000.00 |
| S-103 |
cleaning and resealing existing longitudinal joints
(bridges) |
266   |
LNFT |
3.67 |
976.22 |
4.00 |
1,064.00 |
6.70 |
1,782.20 |
6.05 |
1,609.30 |
| S-104 |
cleaning and resealing existing transverse joints
(bridges) |
216   |
LNFT |
3.67 |
792.72 |
4.00 |
864.00 |
6.70 |
1,447.20 |
6.05 |
1,306.80 |
| S-122 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay (bridges) |
266   |
LNFT |
2.62 |
696.92 |
4.00 |
1,064.00 |
6.20 |
1,649.20 |
5.50 |
1,463.00 |
| S-123 |
sawing and sealing transverse joints in asphaltic
concrete overlay (bridges) |
264   |
LNFT |
2.62 |
691.68 |
4.00 |
1,056.00 |
6.20 |
1,636.80 |
5.50 |
1,452.00 |
| S-127 |
sawcuts in asphaltic concrete lifts (bridges)
|
530   |
LNFT |
1.31 |
694.30 |
3.00 |
1,590.00 |
1.50 |
795.00 |
1.17 |
620.10 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,143,507.40 |
|
1,193,571.75 |
|
1,206,282.09 |
|
1,337,532.44 |
|