| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - HARD ROCK CONSTRUCTION CO. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
237,000.00 |
237,000.00 |
|
|
|
|
| 202-02-A |
removal of bridges sta. 61+80 (3-19' span concrete
slab span 26'x 57' on timber piles) |
1   |
EACH |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
9,268   |
SQYD |
18.00 |
166,824.00 |
10.00 |
92,680.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stablized base
|
15,298.0 |
SQYD |
3.00 |
45,894.00 |
10.00 |
152,980.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
60   |
LNFT |
10.00 |
600.00 |
10.00 |
600.00 |
|
|
|
|
| 202-02-I |
removal of existing signal equipment
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
20,999   |
CUYD |
20.00 |
419,980.00 |
15.00 |
314,985.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
478   |
CUYD |
30.00 |
14,340.00 |
26.00 |
12,428.00 |
|
|
|
|
| 203-03 |
muck excavation
|
661   |
CUYD |
20.00 |
13,220.00 |
40.00 |
26,440.00 |
|
|
|
|
| 203-04 |
embankment
|
5,706   |
CUYD |
15.00 |
85,590.00 |
20.00 |
114,120.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
150   |
EACH |
25.00 |
3,750.00 |
14.00 |
2,100.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
500   |
LNFT |
8.00 |
4,000.00 |
12.00 |
6,000.00 |
|
|
|
|
| 204-04 |
temporary sediment basins
|
6   |
EACH |
900.00 |
5,400.00 |
2,000.00 |
12,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
200.00 |
2,000.00 |
200.00 |
2,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,500   |
LNFT |
2.00 |
9,000.00 |
2.00 |
9,000.00 |
|
|
|
|
| 302-01 |
class ii base course
|
9,593.0 |
CUYD |
95.00 |
911,335.00 |
80.00 |
767,440.00 |
|
|
|
|
| 302-02-A |
class ii base course (6" thick)
|
1,550.1 |
SQYD |
20.00 |
31,002.00 |
13.00 |
20,151.30 |
|
|
|
|
| 304-01 |
lime
|
233.29 |
TON |
150.00 |
34,993.50 |
130.00 |
30,327.70 |
|
|
|
|
| 304-04-E |
lime treatment (type d) (9 " thick)
|
22,107   |
SQYD |
2.00 |
44,214.00 |
3.00 |
66,321.00 |
|
|
|
|
| 305-01-G |
subgrade layer (8" thick)(stone)
|
1,840   |
SQYD |
24.00 |
44,160.00 |
18.00 |
33,120.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
445.0 |
CUYD |
45.00 |
20,025.00 |
50.00 |
22,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
987.5 |
TON |
75.00 |
74,062.50 |
100.00 |
98,750.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,121   |
SQYD |
2.50 |
5,302.50 |
6.00 |
12,726.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 60   |
CUYD |
0.00 |
0.00 |
1.00 |
- 60.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
36,906.8 |
SQYD |
60.00 |
2,214,408.00 |
51.00 |
1,882,246.80 |
|
|
|
|
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
4,780.1 |
SQYD |
65.00 |
310,706.50 |
52.00 |
248,565.20 |
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
202   |
LNFT |
195.00 |
39,390.00 |
100.00 |
20,200.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
66   |
LNFT |
200.00 |
13,200.00 |
115.00 |
7,590.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
66   |
LNFT |
225.00 |
14,850.00 |
225.00 |
14,850.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
264   |
LNFT |
265.00 |
69,960.00 |
275.00 |
72,600.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
3,104   |
LNFT |
75.00 |
232,800.00 |
70.00 |
217,280.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
630   |
LNFT |
85.00 |
53,550.00 |
75.00 |
47,250.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,478   |
LNFT |
92.00 |
135,976.00 |
80.00 |
118,240.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
2,715   |
LNFT |
108.00 |
293,220.00 |
120.00 |
325,800.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
376   |
LNFT |
140.00 |
52,640.00 |
130.00 |
48,880.00 |
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
440   |
LNFT |
165.00 |
72,600.00 |
180.00 |
79,200.00 |
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
164   |
LNFT |
220.00 |
36,080.00 |
250.00 |
41,000.00 |
|
|
|
|
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
570   |
LNFT |
235.00 |
133,950.00 |
260.00 |
148,200.00 |
|
|
|
|
| 701-04-F |
storm drain pipe arch (36" equiv.)
|
124   |
LNFT |
170.00 |
21,080.00 |
140.00 |
17,360.00 |
|
|
|
|
| 701-04-G |
storm drain pipe arch (42" equiv.)
|
148   |
LNFT |
190.00 |
28,120.00 |
190.00 |
28,120.00 |
|
|
|
|
| 701-04-H |
storm drain pipe arch (48" equiv.)
|
130   |
LNFT |
220.00 |
28,600.00 |
200.00 |
26,000.00 |
|
|
|
|
| 701-09-A |
fabricating pipe fittings (15x15x15)
|
8   |
EACH |
900.00 |
7,200.00 |
300.00 |
2,400.00 |
|
|
|
|
| 701-09-B |
fabricating pipe fittings (18x18x15)
|
1   |
EACH |
1,000.00 |
1,000.00 |
400.00 |
400.00 |
|
|
|
|
| 701-09-C |
fabricating pipe fittings (24x24x15)
|
6   |
EACH |
1,200.00 |
7,200.00 |
900.00 |
5,400.00 |
|
|
|
|
| 701-09-D |
fabricating pipe fittings (30x30x15)
|
10   |
EACH |
1,400.00 |
14,000.00 |
1,700.00 |
17,000.00 |
|
|
|
|
| 702-02-A |
manholes (mh-06)
|
3   |
EACH |
2,400.00 |
7,200.00 |
8,000.00 |
24,000.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
4   |
EACH |
4,500.00 |
18,000.00 |
4,000.00 |
16,000.00 |
|
|
|
|
| 702-02-G |
manholes (r-cb-46)
|
3   |
EACH |
8,500.00 |
25,500.00 |
5,000.00 |
15,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
21   |
EACH |
2,600.00 |
54,600.00 |
2,000.00 |
42,000.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
5   |
EACH |
4,000.00 |
20,000.00 |
4,000.00 |
20,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
46   |
EACH |
3,600.00 |
165,600.00 |
3,000.00 |
138,000.00 |
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
8   |
EACH |
5,500.00 |
44,000.00 |
5,000.00 |
40,000.00 |
|
|
|
|
| 702-03-E |
catch basins (cb-03)
|
63   |
EACH |
2,100.00 |
132,300.00 |
2,000.00 |
126,000.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
17   |
EACH |
7,000.00 |
119,000.00 |
5,000.00 |
85,000.00 |
|
|
|
|
| 702-03-G |
catch basins (cb-09)
|
3   |
EACH |
5,000.00 |
15,000.00 |
5,000.00 |
15,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
1,000.00 |
6,000.00 |
1,000.00 |
6,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
3,126.7 |
SQYD |
30.00 |
93,801.00 |
50.00 |
156,335.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
6,063.8 |
SQYD |
40.00 |
242,552.00 |
50.00 |
303,190.00 |
|
|
|
|
| 707-01 |
concrete curb
|
9,631.0 |
LNFT |
5.00 |
48,155.00 |
6.00 |
57,786.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,286.0 |
LNFT |
25.00 |
32,150.00 |
20.00 |
25,720.00 |
|
|
|
|
| 711-01-B |
riprap (10 lb, 12"thick)
|
245   |
SQYD |
55.00 |
13,475.00 |
50.00 |
12,250.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
573   |
SQYD |
60.00 |
34,380.00 |
60.00 |
34,380.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
700   |
LNFT |
0.25 |
175.00 |
1.00 |
700.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (6" width)
|
600   |
LNFT |
0.50 |
300.00 |
1.00 |
600.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
600   |
LNFT |
0.75 |
450.00 |
1.00 |
600.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
400   |
LNFT |
1.00 |
400.00 |
1.00 |
400.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
600   |
LNFT |
2.00 |
1,200.00 |
1.00 |
600.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.500 |
MILE |
500.00 |
750.00 |
400.00 |
600.00 |
|
|
|
|
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
1.500 |
MILE |
4,500.00 |
6,750.00 |
4,000.00 |
6,000.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.300 |
MILE |
800.00 |
1,840.00 |
700.00 |
1,610.00 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
2.300 |
MILE |
18,000.00 |
41,400.00 |
18,000.00 |
41,400.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
10   |
EACH |
60.00 |
600.00 |
58.00 |
580.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
70.00 |
420.00 |
70.00 |
420.00 |
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
500   |
EACH |
6.00 |
3,000.00 |
6.00 |
3,000.00 |
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
25   |
EACH |
1,050.00 |
26,250.00 |
1,000.00 |
25,000.00 |
|
|
|
|
| 717-01 |
seeding
|
135   |
LB |
12.00 |
1,620.00 |
10.00 |
1,350.00 |
|
|
|
|
| 718-02 |
agricultural lime
|
12.0 |
TON |
90.00 |
1,080.00 |
100.00 |
1,200.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 723-02 |
granular material (vehicular measurement)
|
200   |
CUYD |
40.00 |
8,000.00 |
50.00 |
10,000.00 |
|
|
|
|
| 725-01 |
temporary detour roads
|
655.6 |
LNFT |
215.00 |
140,954.00 |
100.00 |
65,560.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
900,000.00 |
900,000.00 |
|
|
|
|
| 729-01-A |
sign (type a)(r10-12)(24"x30")"left turn yield on
green"(1 each ladotd) |
5.0 |
SQFT |
35.00 |
175.00 |
36.00 |
180.00 |
|
|
|
|
| 729-01-B |
sign (type a)(r3-5l)(30"x36")"left turn only"(symbol)
(3 each ladotd) |
15.0 |
SQFT |
35.00 |
525.00 |
36.00 |
540.00 |
|
|
|
|
| 729-01-C |
sign (type a)(r3-5r)(30"x36")"right turn only"(symbol)
(2 each ladotd) |
10.0 |
SQFT |
35.00 |
350.00 |
36.00 |
360.00 |
|
|
|
|
| 729-01-D |
sign (type a)(r10-15)(24"x30")"turning traffic must
yield to pedestrians" (3 each ladotd) |
15.0 |
SQFT |
35.00 |
525.00 |
36.00 |
540.00 |
|
|
|
|
| 729-01-E |
sign (type a)(d-3)(18"x48") street name sign (3 each
ladotd) |
18.0 |
SQFT |
35.00 |
630.00 |
36.00 |
648.00 |
|
|
|
|
| 729-01-F |
sign (type a)(r1-2)(36"x36"x36") yield sign
|
3.9 |
SQFT |
35.00 |
136.50 |
36.00 |
140.40 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
100.00 |
200.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,259   |
EACH |
6.00 |
7,554.00 |
6.00 |
7,554.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
446   |
LNFT |
0.50 |
223.00 |
1.00 |
446.00 |
|
|
|
|
| 732-01-B-01 |
plastic pavement striping (6" width)(preformed marking
tape) (type v) |
546   |
LNFT |
4.00 |
2,184.00 |
4.00 |
2,184.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
548   |
LNFT |
1.00 |
548.00 |
1.00 |
548.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
254   |
LNFT |
3.00 |
762.00 |
3.00 |
762.00 |
|
|
|
|
| 732-01-E-01 |
plastic pavement striping (24" width) preformed
marking tape (type v) |
362   |
LNFT |
7.00 |
2,534.00 |
7.00 |
2,534.00 |
|
|
|
|
| 732-02-A |
plastic pvmt striping (solid line)(4" width)
|
4.400 |
MILE |
2,500.00 |
11,000.00 |
2,000.00 |
8,800.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.825 |
MILE |
850.00 |
2,401.25 |
1,000.00 |
2,825.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
62   |
EACH |
160.00 |
9,920.00 |
150.00 |
9,300.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
250.00 |
1,000.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
23   |
EACH |
180.00 |
4,140.00 |
170.00 |
3,910.00 |
|
|
|
|
| 735-01 |
mailboxes
|
35   |
EACH |
2.00 |
70.00 |
6.00 |
210.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
120.00 |
1,200.00 |
150.00 |
1,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
200.00 |
1,000.00 |
250.00 |
1,250.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
4   |
EACH |
300.00 |
1,200.00 |
400.00 |
1,600.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
1,755   |
LNFT |
4.00 |
7,020.00 |
4.00 |
7,020.00 |
|
|
|
|
| 736-03-A |
jacked or bored conduit (1" pec)
|
490   |
LNFT |
8.50 |
4,165.00 |
9.00 |
4,410.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (2" pec)
|
205   |
LNFT |
9.25 |
1,896.25 |
9.00 |
1,845.00 |
|
|
|
|
| 736-03-C |
jacked or bored conduit (3" pec)
|
320   |
LNFT |
9.50 |
3,040.00 |
9.00 |
2,880.00 |
|
|
|
|
| 736-04-B |
signal support (mast arm standard with 45' arm)
(w/street light) |
1   |
EACH |
12,000.00 |
12,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 736-04-C |
signal support (mast arm standard with 50' arm)
(w/street light) |
2   |
EACH |
14,000.00 |
28,000.00 |
12,000.00 |
24,000.00 |
|
|
|
|
| 736-04-D |
signal support (mast arm standard with 50'and 30' arm)
(w/street light) |
1   |
EACH |
15,000.00 |
15,000.00 |
13,000.00 |
13,000.00 |
|
|
|
|
| 736-04-E |
signal support (pedestal)
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 736-04-F |
signal support (mast arm standard with 30' arm)
|
2   |
EACH |
8,000.00 |
16,000.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| 736-05-B |
signal heads (3-section r, y arrow, g arrow, 12" lens)
(led) |
2   |
EACH |
900.00 |
1,800.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 736-05-C |
signal heads (5-section, r, y arrow, y, g arrow, g,
12" lens)(led) |
3   |
EACH |
1,250.00 |
3,750.00 |
1,300.00 |
3,900.00 |
|
|
|
|
| 736-05-D |
signal heads (5-section,r, y, y arrow, g, g arrow, 12"
lens)(led) |
2   |
EACH |
1,250.00 |
2,500.00 |
1,300.00 |
2,600.00 |
|
|
|
|
| 736-05-E |
signal heads (4-section,r,y,g arrow, g,12" lens)(led)
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 736-05-F |
signal heads (4-section,r,y arrow, g, g arrow, 12"
lens)(led) |
2   |
EACH |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 736-05-G |
signal heads (3-section,r, y arrow, g arrow, 12" lens)
(led) |
9   |
EACH |
900.00 |
8,100.00 |
800.00 |
7,200.00 |
|
|
|
|
| 736-05-H |
signal heads (3-section r,y,g, 12"lens)(led)
|
7   |
EACH |
900.00 |
6,300.00 |
900.00 |
6,300.00 |
|
|
|
|
| 736-06 |
signal service
|
2   |
EACH |
1,000.00 |
2,000.00 |
900.00 |
1,800.00 |
|
|
|
|
| 736-08-A |
signal controller (nema ts2, type 2, 8-phase with type
6, tsi cabinet) |
2   |
EACH |
20,000.00 |
40,000.00 |
20,000.00 |
40,000.00 |
|
|
|
|
| 736-10-A |
underground junction box (type "d")
|
14   |
EACH |
400.00 |
5,600.00 |
300.00 |
4,200.00 |
|
|
|
|
| 736-10-B |
underground junction box (type "e")
|
5   |
EACH |
500.00 |
2,500.00 |
400.00 |
2,000.00 |
|
|
|
|
| 736-10-C |
underground junction box (type "f")
|
6   |
EACH |
600.00 |
3,600.00 |
500.00 |
3,000.00 |
|
|
|
|
| 736-10-D |
underground junction box (type "h")
|
2   |
EACH |
900.00 |
1,800.00 |
900.00 |
1,800.00 |
|
|
|
|
| 736-10-E |
underground junction box (type "l")with fiber optic
modem, 8 phase nema |
9   |
EACH |
1,000.00 |
9,000.00 |
1,000.00 |
9,000.00 |
|
|
|
|
| 736-11-A |
conduit (1" pec)(sch 80)
|
470   |
LNFT |
2.20 |
1,034.00 |
2.00 |
940.00 |
|
|
|
|
| 736-11-B |
conduit (2" pec)(sch 80)
|
420   |
LNFT |
4.50 |
1,890.00 |
4.00 |
1,680.00 |
|
|
|
|
| 736-11-C |
conduit (3" pec) (sch 80)
|
155   |
LNFT |
7.00 |
1,085.00 |
6.00 |
930.00 |
|
|
|
|
| 736-12-A |
conductor 3c (street light cable/#6 awg)
|
930   |
LNFT |
5.00 |
4,650.00 |
5.00 |
4,650.00 |
|
|
|
|
| 736-12-B |
conductor 2c (pedestrian detector/#14 awg)(stranded
and shielded) |
1,825   |
LNFT |
2.00 |
3,650.00 |
1.00 |
1,825.00 |
|
|
|
|
| 736-12-C |
conductor 3c (emergency veh. detector)
|
1,045   |
LNFT |
4.00 |
4,180.00 |
3.00 |
3,135.00 |
|
|
|
|
| 736-12-F-01 |
conductor 3c (signal, #14 awg)
|
2,575   |
LNFT |
2.50 |
6,437.50 |
2.00 |
5,150.00 |
|
|
|
|
| 736-12-F-02 |
conductor 3c (sign illumination, #14 awg)
|
2,140   |
LNFT |
3.00 |
6,420.00 |
3.00 |
6,420.00 |
|
|
|
|
| 736-12-F-03 |
conductor 3c (power)
|
400   |
LNFT |
5.00 |
2,000.00 |
5.00 |
2,000.00 |
|
|
|
|
| 736-12-G |
conductor 6c (signal, #14 awg stranded)
|
3,800   |
LNFT |
2.00 |
7,600.00 |
2.00 |
7,600.00 |
|
|
|
|
| 736-12-H |
conductor 10c (signal, #14 awg stranded)
|
1,920   |
LNFT |
2.50 |
4,800.00 |
2.00 |
3,840.00 |
|
|
|
|
| 736-12-J |
conductor (fiber optic cable , 36 count (6/8)(24 count
multi-mode, 12 count single mode) |
3,735   |
LNFT |
3.60 |
13,446.00 |
4.00 |
14,940.00 |
|
|
|
|
| 736-12-K |
conductor, 6c (pedestrian signal #14 awg)
|
1,720   |
LNFT |
2.00 |
3,440.00 |
2.00 |
3,440.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
6.00 |
ACRE |
1,200.00 |
7,200.00 |
1,000.00 |
6,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
175,000.00 |
175,000.00 |
185,000.00 |
185,000.00 |
|
|
|
|
| 742-01-A |
sanitary sewer pipe (8" ductile iron pipe)
|
92   |
LNFT |
185.00 |
17,020.00 |
240.00 |
22,080.00 |
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
14   |
EACH |
620.00 |
8,680.00 |
725.00 |
10,150.00 |
|
|
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
200   |
LNFT |
52.00 |
10,400.00 |
100.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
130,000.00 |
130,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,736   |
LNFT |
50.00 |
86,800.00 |
50.00 |
86,800.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
600.00 |
600.00 |
600.00 |
600.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
28.55 |
CUYD |
1,200.00 |
34,260.00 |
1,500.00 |
42,825.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
48.88 |
CUYD |
1,250.00 |
61,100.00 |
1,300.00 |
63,544.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
194.94 |
CUYD |
615.00 |
119,888.10 |
650.00 |
126,711.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
660.0 |
LNFT |
600.00 |
396,000.00 |
600.00 |
396,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
48,903   |
LB |
0.80 |
39,122.40 |
1.00 |
48,903.00 |
|
|
|
|
| 810-05 |
pipe and concrete railing
|
119.75 |
LNFT |
235.00 |
28,141.25 |
200.00 |
23,950.00 |
|
|
|
|
| 813-01 |
concrete approach slab
|
693.34 |
SQYD |
155.00 |
107,467.70 |
150.00 |
104,001.00 |
|
|
|
|
| S-001 |
emergency vehicle detector
|
2   |
EACH |
600.00 |
1,200.00 |
600.00 |
1,200.00 |
|
|
|
|
| S-002 |
pedestrian push button and sign
|
12   |
EACH |
225.00 |
2,700.00 |
200.00 |
2,400.00 |
|
|
|
|
| S-003 |
internally illuminated signs (street name)
|
4   |
EACH |
2,400.00 |
9,600.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| S-004 |
internally illuminated signs (left turn yield (r10-12))
|
2   |
EACH |
1,500.00 |
3,000.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| S-005 |
internally illuminated signs (lane control (r3-8a))
|
1   |
EACH |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| S-006 |
video detector
|
7   |
EACH |
6,500.00 |
45,500.00 |
6,000.00 |
42,000.00 |
|
|
|
|
| S-007 |
signal head (hand, man)(16" x 18")
|
12   |
EACH |
800.00 |
9,600.00 |
800.00 |
9,600.00 |
|
|
|
|
| S-008 |
emergency vehicle phase selector
|
2   |
EACH |
3,600.00 |
7,200.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| S-009 |
street light service
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| S-010 |
saw cut 2" asphalt
|
400   |
LNFT |
3.00 |
1,200.00 |
5.00 |
2,000.00 |
|
|
|
|
| S-010A |
saw cut 3" asphalt
|
100   |
LNFT |
4.00 |
400.00 |
8.00 |
800.00 |
|
|
|
|
| S-010B |
saw cut 4" asphalt
|
100   |
LNFT |
5.00 |
500.00 |
10.00 |
1,000.00 |
|
|
|
|
| S-010C |
saw cut 5" asphalt
|
100   |
LNFT |
7.00 |
700.00 |
11.00 |
1,100.00 |
|
|
|
|
| S-010D |
saw cut 6" concrete
|
1,921   |
LNFT |
8.00 |
15,368.00 |
6.00 |
11,526.00 |
|
|
|
|
| S-011 |
traffic maintenance asphaltic concrete
|
100   |
TON |
100.00 |
10,000.00 |
100.00 |
10,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
9,188,003.95 |
|
9,288,748.40 |
|
|
|
|
| | Number of Days Bid at $1,000 per day. |
|
|
500 |
500,000.00 |
540 |
540,000.00 |
0 |
|
0 |
|
| | TOTAL BID |
|
|
|
9,688,003.95 |
|
9,828,748.40 |
|
|
|
|
|