Letting of 3/29/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-64-0107
Parish: WINN
Routes:
Description: COUCH ROAD BRIDGE OVER POPE CREEK
Type Const: grading, bridge removal, class ii base course, superpave asphaltic concrete pavement,
p. c. concrete bridge, and related work.
Estimated Construction Cost: $271,756.50
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $295,122.50
2 23112 BEN ALLEN, INC. $298,880.00
3 18546 C W & W CONTRACTORS, INC. $321,119.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
BEN ALLEN, INC.
- 3 -
C W & W CONTRACTORS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 15,000.00 15,000.00 12,000.00 12,000.00 6,000.00 6,000.00    
202-02-A-01 removal of bridge(sta. 5+98,13.7' x 45' long, grated
steel deck supported by 18" deep steel beams w/
timber piles)
1      EACH 15,000.00 15,000.00 14,000.00 14,000.00 15,000.00 15,000.00    
203-06 excavation & embankment lump      LUMP 14,000.00 14,000.00 20,000.00 20,000.00 10,000.00 10,000.00    
204-02 temporary hay or straw bales 20      EACH 10.00 200.00 FREE FREE 10.00 200.00    
204-03 temporary slope drains 200      LNFT FREE FREE FREE FREE 6.00 1,200.00    
204-05-A temporary sediment check dams (hay) 4      EACH 100.00 400.00 FREE FREE 125.00 500.00    
204-06 temporary silt fencing 850      LNFT 3.00 2,550.00 FREE FREE 3.00 2,550.00    
302-01-A class ii base course(stone only) 168.7    CUYD 95.00 16,026.50 100.00 16,870.00 85.00 14,339.50    
401-02 aggregate surface course (adjusted vehicular
measurement)
9      CUYD 100.00 900.00 100.00 900.00 100.00 900.00    
502-01 superpave asphaltic concrete 131.0    TON 145.00 18,995.00 160.00 20,960.00 200.00 26,200.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 62.00 6,200.00 40.00 4,000.00 66.00 6,600.00    
704-09 guard rail anchor sections (turndown) 100.0    LNFT 33.00 3,300.00 60.00 6,000.00 42.00 4,200.00    
711-01-D riprap (55 lb,18" thick) 450      SQYD 60.00 27,000.00 60.00 27,000.00 65.00 29,250.00    
711-04 geotextile fabric 450      SQYD 5.00 2,250.00 3.00 1,350.00 3.00 1,350.00    
713-01 temporary signs & barricades lump      LUMP 6,500.00 6,500.00 5,000.00 5,000.00 6,000.00 6,000.00    
727-01 mobilization lump      LUMP 28,000.00 28,000.00 20,000.00 20,000.00 25,000.00 25,000.00    
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 75.00 600.00 85.00 680.00    
740-01 construction layout lump      LUMP 4,000.00 4,000.00 4,000.00 4,000.00 8,500.00 8,500.00    
804-01-B precast concrete piles (14") 900      LNFT 48.00 43,200.00 48.00 43,200.00 66.00 59,400.00    
804-12 loading permanent piles 1      EACH 1.00 1.00 FREE FREE 250.00 250.00    
805-10-A bridge superstructure & substructure(90 degree
crossing,24'clear roadway)
4      SPAN 19,000.00 76,000.00 22,000.00 88,000.00 22,000.00 88,000.00    
S-101 concrete approach slabs(90 degree crossing,24' clear
roadway)(w/asphalt)
2      EACH 7,500.00 15,000.00 7,500.00 15,000.00 7,500.00 15,000.00    
                       
 CONTRACTOR TOTAL       295,122.50   298,880.00   321,119.50