Letting of 3/29/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-60-0010
Parish: WEBSTER
Routes:
Description: SALLEY BAKER ROAD BRIDGE OVER TRIB. TO BODCAU BAYOU
Type Const: grading, drainage structures, precast reinforced concrete box culverts and related
work.
Estimated Construction Cost: $197,128.75
 
RankLicenseBidderConstruction Bid
1 28218 F. J. BURNELL, INC. $175,986.25
2 18546 C W & W CONTRACTORS, INC. $210,766.50
3 44111 CONSTRUCTING SOLUTIONS LLC $221,371.00
4 17464 BENTON & BROWN, LLC. $238,238.80
5 23029 TRIAD BUILDERS OF RUSTON INC $249,291.54
 
Item Number Item Description Quantity Unit of Measure - 1 -
F. J. BURNELL, INC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
CONSTRUCTING SOLUTIONS LLC
- 4 -
BENTON & BROWN, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 6,000.00 6,000.00 5,000.00 5,000.00 10,000.00 10,000.00 6,000.00 6,000.00
202-02-A-01 removal of bridge (sta. 100+00; 30.35' long x 15.6'
wide timber bridge)
1      EACH 2,000.00 2,000.00 5,000.00 5,000.00 10,000.00 10,000.00 6,000.00 6,000.00
203-06 excavation & embankment lump      LUMP 10,000.00 10,000.00 8,500.00 8,500.00 15,000.00 15,000.00 29,000.00 29,000.00
204-02 temporary hay or straw bales 40      EACH 10.00 400.00 5.00 200.00 10.00 400.00 7.00 280.00
204-06 temporary silt fencing 510      LNFT 2.00 1,020.00 3.00 1,530.00 3.00 1,530.00 2.00 1,020.00
403-01 aggregate roadway surfacing (vehicular measurement) 62.8    CUYD 75.00 4,710.00 85.00 5,338.00 100.00 6,280.00 120.00 7,536.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 4,500.00 4,500.00 7,500.00 7,500.00 6,000.00 6,000.00
726-01 bedding material 142.0    CUYD 65.00 9,230.00 75.00 10,650.00 40.00 5,680.00 68.00 9,656.00
727-01 mobilization lump      LUMP 20,000.00 20,000.00 10,000.00 10,000.00 15,000.00 15,000.00 20,000.00 20,000.00
729-16-B object marker assembly (type 2) 4      EACH 80.00 320.00 85.00 340.00 90.00 360.00 90.00 360.00
740-01 construction layout lump      LUMP 2,000.00 2,000.00 5,000.00 5,000.00 5,000.00 5,000.00 7,000.00 7,000.00
805-01-B class a concrete (box culvert headwalls) 37.84   CUYD 750.00 28,380.00 900.00 34,056.00 1,000.00 37,840.00 970.00 36,704.80
805-12-P-01 reinforced concrete box culverts (7'x 7')(precast only,
astm c1433)
152.0    LNFT 550.00 83,600.00 750.00 114,000.00 685.00 104,120.00 680.00 103,360.00
806-01 deformed reinforcing steel 2,661      LB 1.25 3,326.25 2.50 6,652.50 1.00 2,661.00 2.00 5,322.00
                       
 CONTRACTOR TOTAL       175,986.25   210,766.50   221,371.00   238,238.80
 
Item Number Item Description Quantity Unit of Measure - 5 -
TRIAD BUILDERS OF RUSTON INC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 8,500.00 8,500.00            
202-02-A-01 removal of bridge (sta. 100+00; 30.35' long x 15.6'
wide timber bridge)
1      EACH 3,500.00 3,500.00            
203-06 excavation & embankment lump      LUMP 21,000.00 21,000.00            
204-02 temporary hay or straw bales 40      EACH 10.00 400.00            
204-06 temporary silt fencing 510      LNFT 2.50 1,275.00            
403-01 aggregate roadway surfacing (vehicular measurement) 62.8    CUYD 85.00 5,338.00            
713-01 temporary signs & barricades lump      LUMP 5,700.00 5,700.00            
726-01 bedding material 142.0    CUYD 85.00 12,070.00            
727-01 mobilization lump      LUMP 50,000.00 50,000.00            
729-16-B object marker assembly (type 2) 4      EACH 120.00 480.00            
740-01 construction layout lump      LUMP 4,000.00 4,000.00            
805-01-B class a concrete (box culvert headwalls) 37.84   CUYD 961.00 36,364.24            
805-12-P-01 reinforced concrete box culverts (7'x 7')(precast only,
astm c1433)
152.0    LNFT 622.00 94,544.00            
806-01 deformed reinforcing steel 2,661      LB 2.30 6,120.30            
                       
 CONTRACTOR TOTAL       249,291.54