| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - F. J. BURNELL, INC. |
- 3 - LOUISIANA BRIDGE, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 1+150.00; 7.285m x 9.765m
timber structure) |
1   |
ea |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
35   |
ea |
10.00 |
350.00 |
10.00 |
350.00 |
9.00 |
315.00 |
|
|
| 204-03 |
temporary slope drains
|
30   |
ln m |
20.00 |
600.00 |
30.00 |
900.00 |
1.00 |
30.00 |
|
|
| 204-05 |
temporary sediment check dams (hay)
|
4   |
ea |
150.00 |
600.00 |
100.00 |
400.00 |
85.00 |
340.00 |
|
|
| 204-06 |
temporary silt fencing
|
304   |
ln m |
10.00 |
3,040.00 |
7.50 |
2,280.00 |
5.25 |
1,596.00 |
|
|
| 302-01 |
class ii base course
|
263.1 |
cu m |
100.00 |
26,310.00 |
90.00 |
23,679.00 |
163.50 |
43,016.85 |
|
|
| 502-01 |
superpave asphaltic concrete
|
209.9 |
Mg |
125.00 |
26,237.50 |
200.00 |
41,980.00 |
182.00 |
38,201.80 |
|
|
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
45.0 |
ln m |
150.00 |
6,750.00 |
174.00 |
7,830.00 |
223.00 |
10,035.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
204.00 |
6,217.92 |
190.00 |
5,791.20 |
193.00 |
5,882.64 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
90.00 |
2,743.20 |
85.00 |
2,590.80 |
84.00 |
2,560.32 |
|
|
| 707-04 |
asphaltic curb
|
12.0 |
ln m |
100.00 |
1,200.00 |
90.00 |
1,080.00 |
187.00 |
2,244.00 |
|
|
| 711-01-D |
riprap (25 kg,460mm thick)
|
472   |
sq m |
90.00 |
42,480.00 |
60.00 |
28,320.00 |
80.00 |
37,760.00 |
|
|
| 711-04 |
geotextile fabric
|
472   |
sq m |
3.00 |
1,416.00 |
2.50 |
1,180.00 |
3.50 |
1,652.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
6,500.00 |
6,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
26,000.00 |
26,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
85.00 |
680.00 |
80.00 |
640.00 |
77.00 |
616.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
285.0 |
ln m |
220.00 |
62,700.00 |
175.00 |
49,875.00 |
205.00 |
58,425.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
500.00 |
500.00 |
100.00 |
100.00 |
1.00 |
1.00 |
|
|
| 805-10-A-01 |
bridge superstructure & substructure (90 degree-7.3m
clear roadway)(c.i.p.) |
4   |
span |
22,000.00 |
88,000.00 |
26,000.00 |
104,000.00 |
20,000.00 |
80,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
328,824.62 |
|
349,996.00 |
|
378,675.61 |
|
|
|