| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - F. MILLER & SONS, LLC |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - PETERS CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
13,200.00 |
13,200.00 |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 15+00.00;18.75' wide x 39.08'
long; timber bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
13,700.00 |
13,700.00 |
10,000.00 |
10,000.00 |
4,500.00 |
4,500.00 |
| 202-02-A-02 |
removal of bridge(sta. 15+00.42;18.80' wide x 39.44'
long; timber bridge) |
1   |
EACH |
6,000.00 |
6,000.00 |
18,300.00 |
18,300.00 |
10,000.00 |
10,000.00 |
5,600.00 |
5,600.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
16,500.00 |
16,500.00 |
37,900.00 |
37,900.00 |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
| 204-02 |
temporary hay or straw bales
|
8   |
EACH |
10.00 |
80.00 |
21.00 |
168.00 |
10.00 |
80.00 |
9.00 |
72.00 |
| 204-03 |
temporary slope drains
|
80   |
LNFT |
10.00 |
800.00 |
9.00 |
720.00 |
15.00 |
1,200.00 |
2.00 |
160.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
155.00 |
1,240.00 |
125.00 |
1,000.00 |
100.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
1,020   |
LNFT |
2.00 |
2,040.00 |
4.00 |
4,080.00 |
3.00 |
3,060.00 |
5.00 |
5,100.00 |
| 302-01-A |
class ii base course(stone or recycled portland cement
concrete) |
294.0 |
CUYD |
95.00 |
27,930.00 |
70.00 |
20,580.00 |
85.00 |
24,990.00 |
22.00 |
6,468.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
11   |
CUYD |
100.00 |
1,100.00 |
70.00 |
770.00 |
90.00 |
990.00 |
45.00 |
495.00 |
| 502-01 |
superpave asphaltic concrete
|
229.9 |
TON |
175.00 |
40,232.50 |
217.00 |
49,888.30 |
225.00 |
51,727.50 |
275.00 |
63,222.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
60.00 |
12,000.00 |
54.00 |
10,800.00 |
78.00 |
15,600.00 |
70.00 |
14,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
32.00 |
6,400.00 |
24.00 |
4,800.00 |
36.00 |
7,200.00 |
40.00 |
8,000.00 |
| 712-04 |
flexible revetment
|
347   |
SQYD |
65.00 |
22,555.00 |
56.00 |
19,432.00 |
55.00 |
19,085.00 |
75.00 |
26,025.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,500.00 |
12,500.00 |
44,800.00 |
44,800.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
32,500.00 |
32,500.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
26,000.00 |
26,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
75.00 |
1,200.00 |
68.00 |
1,088.00 |
108.00 |
1,728.00 |
75.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
19,700.00 |
19,700.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,656   |
LNFT |
46.00 |
76,176.00 |
44.50 |
73,692.00 |
60.00 |
99,360.00 |
64.00 |
105,984.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
100.00 |
200.00 |
250.00 |
500.00 |
1,000.00 |
2,000.00 |
| 805-10-A |
bridge superstructure & substructure(24' clear roadway;
90 degree crossing, precast only) |
3   |
SPAN |
19,000.00 |
57,000.00 |
15,800.00 |
47,400.00 |
23,000.00 |
69,000.00 |
24,000.00 |
72,000.00 |
| 805-10-B |
bridge superstructure & substructure(24' clear roadway;
75 degree crossing, precast only) |
3   |
SPAN |
20,000.00 |
60,000.00 |
16,800.00 |
50,400.00 |
23,575.00 |
70,725.00 |
25,000.00 |
75,000.00 |
| S-101 |
concrete approach slabs(24' clear roadway: 90 degree
crossing) (w/out asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
7,500.00 |
15,000.00 |
9,500.00 |
19,000.00 |
8,500.00 |
17,000.00 |
| S-102 |
concrete approach slabs(24' clear roadway: 75 degree
crossing) (w/out asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
7,500.00 |
15,000.00 |
9,500.00 |
19,000.00 |
8,500.00 |
17,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
432,815.50 |
|
512,858.30 |
|
524,245.50 |
|
527,626.50 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - W. E. MCDONALD & SON, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 15+00.00;18.75' wide x 39.08'
long; timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta. 15+00.42;18.80' wide x 39.44'
long; timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
8   |
EACH |
50.00 |
400.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
80   |
LNFT |
20.00 |
1,600.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
300.00 |
2,400.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,020   |
LNFT |
3.00 |
3,060.00 |
|
|
|
|
|
|
| 302-01-A |
class ii base course(stone or recycled portland cement
concrete) |
294.0 |
CUYD |
100.00 |
29,400.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
11   |
CUYD |
100.00 |
1,100.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
229.9 |
TON |
225.00 |
51,727.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
52.00 |
10,400.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
200.0 |
LNFT |
23.00 |
4,600.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
347   |
SQYD |
75.00 |
26,025.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
29,000.00 |
29,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
100.00 |
1,600.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,656   |
LNFT |
50.00 |
82,800.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(24' clear roadway;
90 degree crossing, precast only) |
3   |
SPAN |
30,000.00 |
90,000.00 |
|
|
|
|
|
|
| 805-10-B |
bridge superstructure & substructure(24' clear roadway;
75 degree crossing, precast only) |
3   |
SPAN |
30,000.00 |
90,000.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs(24' clear roadway: 90 degree
crossing) (w/out asphalt) |
2   |
EACH |
12,000.00 |
24,000.00 |
|
|
|
|
|
|
| S-102 |
concrete approach slabs(24' clear roadway: 75 degree
crossing) (w/out asphalt) |
2   |
EACH |
12,000.00 |
24,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
595,614.50 |
|
|
|
|
|
|
|