Letting of 3/29/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 355-03-0010
Parish: CONCORDIA
Routes: LA 566
Description: BEGIN CONTROL - TENSAS LEVEE
Type Const: grading, lime treatment, cement treated base course, superpave asphaltic concrete
pavement and related work.
Estimated Construction Cost: $1,414,423.34
 
RankLicenseBidderConstruction Bid
1 02268 SOIL STABILIZERS, INC. $1,281,628.09
2 02214 W. E. BLAIN & SONS, INC. $1,307,863.02
3 05789 D & J CONSTRUCTION CO., INC. $1,356,436.03
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,485,961.18
5 12312 GILCHRIST CONSTRUCTION CO. LLC $1,627,542.13
 
Item Number Item Description Quantity Unit of Measure - 1 -
SOIL STABILIZERS, INC.
- 2 -
W. E. BLAIN & SONS, INC.
- 3 -
D & J CONSTRUCTION CO., INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 2,000      CUYD 4.00 8,000.00 19.70 39,400.00 12.00 24,000.00 15.00 30,000.00
203-08-A borrow (vehicular meas.)(selected soils) 2,790      CUYD 5.00 13,950.00 13.00 36,270.00 8.00 22,320.00 15.00 41,850.00
304-01 lime 283.93   TON 130.00 36,910.90 130.00 36,910.90 131.00 37,194.83 150.00 42,589.50
304-04-D lime treatment (type d) (12" thick) 18,027      SQYD 1.50 27,040.50 2.10 37,856.70 1.50 27,040.50 2.00 36,054.00
401-02 aggregate surface course (adjusted vehicular
measurement)
195      CUYD 30.00 5,850.00 44.00 8,580.00 60.00 11,700.00 24.00 4,680.00
502-01 superpave asphaltic concrete 9,841.8    TON 66.00 649,558.80 57.50 565,903.50 66.00 649,558.80 64.50 634,796.10
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
444.0    TON 66.00 29,304.00 90.00 39,960.00 66.00 29,304.00 124.00 55,056.00
713-01 temporary signs & barricades lump      LUMP 17,000.00 17,000.00 33,000.00 33,000.00 15,000.00 15,000.00 6,000.00 6,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.243  MILE 200.00 1,848.60 400.00 3,697.20 177.00 1,636.01 150.00 1,386.45
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.424  MILE 1.00 7.42 175.00 1,299.20 1.00 7.42 280.00 2,078.72
713-05-A temporary pavement markings (solid line)(4" width) 26.066  MILE 1.00 26.07 350.00 9,123.10 1.00 26.07 500.00 13,033.00
713-07-A temporary reflectorized raised pavement markers (tabs) 611      EACH 2.00 1,222.00 1.00 611.00 1.50 916.50 1.50 916.50
722-01 project site laboratory 1      EACH 2,500.00 2,500.00 10,000.00 10,000.00 5,000.00 5,000.00 5,000.00 5,000.00
727-01 mobilization lump      LUMP 35,000.00 35,000.00 66,000.00 66,000.00 40,000.00 40,000.00 148,000.00 148,000.00
731-02 reflectorized raised pavement markers 611      EACH 4.00 2,444.00 4.25 2,596.75 4.50 2,749.50 5.00 3,055.00
732-02-A plastic pavement striping (solid line) (4" width) 13.033  MILE 2,000.00 26,066.00 2,150.00 28,020.95 2,000.00 26,066.00 2,350.00 30,627.55
732-03-A plastic pavement striping (broken line)(4" width) 3.712  MILE 650.00 2,412.80 700.00 2,598.40 700.00 2,598.40 780.00 2,895.36
735-01 mailboxes 12      EACH 5.00 60.00 1.00 12.00 1.00 12.00 18.00 216.00
735-02 mailbox supports (single) 12      EACH 175.00 2,100.00 130.00 1,560.00 150.00 1,800.00 200.00 2,400.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 27,000.00 27,000.00 13,000.00 13,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 12,000.00 12,000.00 10,000.00 10,000.00 10,000.00 10,000.00
S-001 cement treated base course (12 in depth) 62,358      SQYD 6.50 405,327.00 5.54 345,463.32 7.00 436,506.00 6.50 405,327.00
                       
 CONTRACTOR TOTAL       1,281,628.09   1,307,863.02   1,356,436.03   1,485,961.18
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 2,000      CUYD 19.00 38,000.00            
203-08-A borrow (vehicular meas.)(selected soils) 2,790      CUYD 20.00 55,800.00            
304-01 lime 283.93   TON 120.00 34,071.60            
304-04-D lime treatment (type d) (12" thick) 18,027      SQYD 2.50 45,067.50            
401-02 aggregate surface course (adjusted vehicular
measurement)
195      CUYD 100.00 19,500.00            
502-01 superpave asphaltic concrete 9,841.8    TON 79.00 777,502.20            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
444.0    TON 140.00 62,160.00            
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.243  MILE 400.00 3,697.20            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.424  MILE 280.00 2,078.72            
713-05-A temporary pavement markings (solid line)(4" width) 26.066  MILE 560.00 14,596.96            
713-07-A temporary reflectorized raised pavement markers (tabs) 611      EACH 0.40 244.40            
722-01 project site laboratory 1      EACH 3,000.00 3,000.00            
727-01 mobilization lump      LUMP 50,000.00 50,000.00            
731-02 reflectorized raised pavement markers 611      EACH 5.25 3,207.75            
732-02-A plastic pavement striping (solid line) (4" width) 13.033  MILE 2,400.00 31,279.20            
732-03-A plastic pavement striping (broken line)(4" width) 3.712  MILE 800.00 2,969.60            
735-01 mailboxes 12      EACH 10.00 120.00            
735-02 mailbox supports (single) 12      EACH 160.00 1,920.00            
740-01 construction layout lump      LUMP 12,000.00 12,000.00            
744-01 traffic control management lump      LUMP 60,000.00 60,000.00            
S-001 cement treated base course (12 in depth) 62,358      SQYD 6.50 405,327.00            
                       
 CONTRACTOR TOTAL       1,627,542.13