| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - COASTAL BRIDGE CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
150,000.00 |
150,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
4,504   |
SQYD |
12.50 |
56,300.00 |
65.00 |
292,760.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
4,538   |
SQYD |
12.50 |
56,725.00 |
30.00 |
136,140.00 |
|
|
|
|
| 203-01 |
general excavation
|
6,069   |
CUYD |
20.00 |
121,380.00 |
12.00 |
72,828.00 |
|
|
|
|
| 203-04 |
embankment
|
1,665   |
CUYD |
25.00 |
41,625.00 |
20.00 |
33,300.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
21.00 |
1,050.00 |
15.00 |
750.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
5.00 |
1,000.00 |
2.00 |
400.00 |
|
|
|
|
| 302-01 |
class ii base course
|
5,029.5 |
CUYD |
85.00 |
427,507.50 |
105.00 |
528,097.50 |
|
|
|
|
| 304-01 |
lime
|
300.00 |
TON |
140.00 |
42,000.00 |
130.00 |
39,000.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
19,110   |
SQYD |
4.00 |
76,440.00 |
2.50 |
47,775.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
250.00 |
12,500.00 |
500.00 |
25,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
29,591.2 |
TON |
65.00 |
1,923,428.00 |
65.00 |
1,923,428.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts &
miscellaneous |
681.3 |
TON |
110.00 |
74,943.00 |
90.00 |
61,317.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
27,527   |
SQYD |
3.00 |
82,581.00 |
2.50 |
68,817.50 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
20,000   |
LNFT |
1.60 |
32,000.00 |
1.60 |
32,000.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
15,000   |
LNFT |
2.00 |
30,000.00 |
1.30 |
19,500.00 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
1,500   |
LNFT |
4.00 |
6,000.00 |
2.35 |
3,525.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
384   |
LNFT |
90.00 |
34,560.00 |
75.00 |
28,800.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
24   |
LNFT |
100.00 |
2,400.00 |
85.00 |
2,040.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
24   |
LNFT |
155.00 |
3,720.00 |
135.00 |
3,240.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
24   |
LNFT |
240.00 |
5,760.00 |
205.00 |
4,920.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
24   |
LNFT |
250.00 |
6,000.00 |
219.00 |
5,256.00 |
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
24   |
LNFT |
315.00 |
7,560.00 |
275.00 |
6,600.00 |
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
24   |
LNFT |
320.00 |
7,680.00 |
300.00 |
7,200.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,500.00 |
7,000.00 |
2,300.00 |
4,600.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
7,500.00 |
7,500.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
57   |
EACH |
5,500.00 |
313,500.00 |
5,000.00 |
285,000.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
10   |
EACH |
7,000.00 |
70,000.00 |
6,500.00 |
65,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
5   |
EACH |
2,200.00 |
11,000.00 |
2,000.00 |
10,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
66   |
EACH |
2,500.00 |
165,000.00 |
2,000.00 |
132,000.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
162.0 |
LNFT |
100.00 |
16,200.00 |
60.00 |
9,720.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
206.3 |
LNFT |
20.00 |
4,126.00 |
20.00 |
4,126.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.5 |
LNFT |
100.00 |
1,250.00 |
80.00 |
1,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
4,368.2 |
SQYD |
45.00 |
196,569.00 |
45.00 |
196,569.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,754.6 |
SQYD |
70.00 |
122,822.00 |
75.00 |
131,595.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
18,742.8 |
LNFT |
25.00 |
468,570.00 |
30.00 |
562,284.00 |
|
|
|
|
| 712-01-C |
concrete cast-in-place revetment (6" thick)
|
455   |
SQYD |
75.00 |
34,125.00 |
65.00 |
29,575.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
275,000.00 |
275,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
21,144   |
LNFT |
0.20 |
4,228.80 |
0.20 |
4,228.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.000 |
MILE |
350.00 |
1,400.00 |
300.00 |
1,200.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
4,251   |
SQYD |
75.00 |
318,825.00 |
25.00 |
106,275.00 |
|
|
|
|
| 726-01 |
bedding material
|
115.0 |
CUYD |
60.00 |
6,900.00 |
65.00 |
7,475.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
475,000.00 |
475,000.00 |
600,000.00 |
600,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
90.00 |
360.00 |
70.00 |
280.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,367   |
EACH |
6.00 |
8,202.00 |
5.50 |
7,518.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,024   |
LNFT |
1.25 |
1,280.00 |
1.00 |
1,024.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
312   |
LNFT |
3.50 |
1,092.00 |
3.00 |
936.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.237 |
MILE |
2,500.00 |
20,592.50 |
2,500.00 |
20,592.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.679 |
MILE |
1,200.00 |
9,214.80 |
1,000.00 |
7,679.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
160.00 |
1,280.00 |
150.00 |
1,200.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
17   |
EACH |
250.00 |
4,250.00 |
220.00 |
3,740.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
EACH |
175.00 |
1,400.00 |
150.00 |
1,200.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
2.000 |
MILE |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
60,000.00 |
60,000.00 |
225,000.00 |
225,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
80,000.00 |
80,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
5.49 |
CUYD |
2,000.00 |
10,980.00 |
1,200.00 |
6,588.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
8.0 |
LNFT |
600.00 |
4,800.00 |
750.00 |
6,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
387   |
LB |
1.25 |
483.75 |
2.00 |
774.00 |
|
|
|
|
| S-001 |
paved gutter drain
|
40   |
EACH |
2,700.00 |
108,000.00 |
2,600.00 |
104,000.00 |
|
|
|
|
| S-002 |
headwall raising
|
112   |
LNFT |
90.00 |
10,080.00 |
75.00 |
8,400.00 |
|
|
|
|
| S-003 |
cured in place pipe
|
782   |
LNFT |
215.00 |
168,130.00 |
225.00 |
175,950.00 |
|
|
|
|
| S-004 |
sawing and sealing longitudinal joints in asphalt
|
20,000   |
LNFT |
1.15 |
23,000.00 |
1.15 |
23,000.00 |
|
|
|
|
| S-005 |
sawing and sealing transverse joints in asphalt
|
15,000   |
LNFT |
1.25 |
18,750.00 |
1.05 |
15,750.00 |
|
|
|
|
| S-006 |
sawing longitudinal joints in asphalt
|
20,000   |
LNFT |
1.00 |
20,000.00 |
1.00 |
20,000.00 |
|
|
|
|
| S-007 |
sawing transverse joints in asphalt
|
15,000   |
LNFT |
1.20 |
18,000.00 |
1.00 |
15,000.00 |
|
|
|
|
| S-008 |
dynamic message sign unit
|
2   |
EACH |
24,000.00 |
48,000.00 |
20,000.00 |
40,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
6,248,070.35 |
|
6,675,973.80 |
|
|
|
|
| | Number of Days Bid at $3,000 per day. |
|
|
350 |
1,050,000.00 |
250 |
750,000.00 |
0 |
|
0 |
|
| | TOTAL BID |
|
|
|
7,298,070.35 |
|
7,425,973.80 |
|
|
|
|
|