Letting of 3/29/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 035-01-0017
Parish: SABINE
Routes: LA 175
Description: JCT US 171 - 5.0 MILES NORTH
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
cement treated base course and related work.
Estimated Construction Cost: $1,416,187.77
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,415,716.37
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,572,950.77
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 500.00 500.00 2,000.00 2,000.00        
202-02-D removal of concrete walks & drives 37      SQYD 10.00 370.00 40.00 1,480.00        
203-08 borrow (vehicular measurement) 2,000      CUYD 7.50 15,000.00 20.00 40,000.00        
203-08-A borrow (vehicular meas.)(selected soils) 100      CUYD 10.00 1,000.00 20.00 2,000.00        
303-02 removal of existing patches 200      SQYD 15.00 3,000.00 8.25 1,650.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,200      CUYD 15.75 34,650.00 35.00 77,000.00        
502-01 superpave asphaltic concrete 11,225.5    TON 60.50 679,142.75 69.00 774,559.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
267.8    TON 50.00 13,390.00 125.00 33,475.00        
509-01 cold planing asphaltic pavement 55,093      SQYD 2.30 126,713.90 2.60 143,241.80        
509-02 contractor retained reclaimed asphaltic pavement - 3,818      CUYD 0.10 - 381.80 1.00 - 3,818.00        
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 250.00 2,000.00 200.00 1,600.00        
701-15 concrete collar 1      EACH 900.00 900.00 900.00 900.00        
713-01 temporary signs & barricades lump      LUMP 33,000.00 33,000.00 10,000.00 10,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
17.507  MILE 300.00 5,252.10 450.00 7,878.15        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.582  MILE 1.00 7.58 1.00 7.58        
713-05-A temporary pavement markings (solid line)(4" width) 60.840  MILE 1.00 60.84 1.00 60.84        
722-01 project site laboratory 1      EACH 5,000.00 5,000.00 2,500.00 2,500.00        
726-01 bedding material 1.6    CUYD 100.00 160.00 60.00 96.00        
727-01 mobilization lump      LUMP 33,000.00 33,000.00 60,000.00 60,000.00        
731-02 reflectorized raised pavement markers 577      EACH 4.50 2,596.50 5.20 3,000.40        
732-02-A plastic pavement striping (solid line) (4" width) 15.210  MILE 2,350.00 35,743.50 2,400.00 36,504.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.895  MILE 700.00 1,326.50 800.00 1,516.00        
735-01 mailboxes 16      EACH 1.00 16.00 10.00 160.00        
735-02 mailbox supports (single) 14      EACH 225.00 3,150.00 170.00 2,380.00        
735-03 mailbox supports (double) 2      EACH 325.00 650.00 220.00 440.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 8,000.00 8,000.00        
744-01 traffic control management lump      LUMP 12,000.00 12,000.00 30,000.00 30,000.00        
S-001 cement treated base course (12 in depth) 61,149      SQYD 6.50 397,468.50 5.50 336,319.50        
                       
 CONTRACTOR TOTAL       1,415,716.37   1,572,950.77