| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
37   |
SQYD |
10.00 |
370.00 |
40.00 |
1,480.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,000   |
CUYD |
7.50 |
15,000.00 |
20.00 |
40,000.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
100   |
CUYD |
10.00 |
1,000.00 |
20.00 |
2,000.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
200   |
SQYD |
15.00 |
3,000.00 |
8.25 |
1,650.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,200   |
CUYD |
15.75 |
34,650.00 |
35.00 |
77,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,225.5 |
TON |
60.50 |
679,142.75 |
69.00 |
774,559.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
267.8 |
TON |
50.00 |
13,390.00 |
125.00 |
33,475.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
55,093   |
SQYD |
2.30 |
126,713.90 |
2.60 |
143,241.80 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,818   |
CUYD |
0.10 |
- 381.80 |
1.00 |
- 3,818.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
250.00 |
2,000.00 |
200.00 |
1,600.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
900.00 |
900.00 |
900.00 |
900.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
33,000.00 |
33,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
17.507 |
MILE |
300.00 |
5,252.10 |
450.00 |
7,878.15 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.582 |
MILE |
1.00 |
7.58 |
1.00 |
7.58 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
60.840 |
MILE |
1.00 |
60.84 |
1.00 |
60.84 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
1.6 |
CUYD |
100.00 |
160.00 |
60.00 |
96.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
33,000.00 |
33,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
577   |
EACH |
4.50 |
2,596.50 |
5.20 |
3,000.40 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.210 |
MILE |
2,350.00 |
35,743.50 |
2,400.00 |
36,504.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.895 |
MILE |
700.00 |
1,326.50 |
800.00 |
1,516.00 |
|
|
|
|
| 735-01 |
mailboxes
|
16   |
EACH |
1.00 |
16.00 |
10.00 |
160.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
14   |
EACH |
225.00 |
3,150.00 |
170.00 |
2,380.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
325.00 |
650.00 |
220.00 |
440.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,000.00 |
12,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
61,149   |
SQYD |
6.50 |
397,468.50 |
5.50 |
336,319.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,415,716.37 |
|
1,572,950.77 |
|
|
|
|
|