| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CIRCLE, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - RIVERWEST CONSTRUCTION COMPANY LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of trees and stumps
|
23   |
EACH |
194.00 |
4,462.00 |
275.00 |
6,325.00 |
200.00 |
4,600.00 |
350.00 |
8,050.00 |
| 203-01-A |
general excavation
|
lump |
lump |
21,800.00 |
21,800.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
46,000.00 |
46,000.00 |
| 203-05-A |
nonplastic embankment
|
lump |
lump |
56,400.00 |
56,400.00 |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
48,000.00 |
48,000.00 |
| 203-08-B |
borrow (vehicular measurement)(plastic soils)(off-site)
|
12,190   |
CUYD |
12.00 |
146,280.00 |
18.00 |
219,420.00 |
16.75 |
204,182.50 |
16.00 |
195,040.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
77.00 |
308.00 |
170.00 |
680.00 |
175.00 |
700.00 |
200.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
5,200   |
LNFT |
2.10 |
10,920.00 |
1.00 |
5,200.00 |
2.50 |
13,000.00 |
1.60 |
8,320.00 |
| 302-01 |
class ii base course
|
1,760.0 |
CUYD |
46.20 |
81,312.00 |
50.00 |
88,000.00 |
54.00 |
95,040.00 |
60.00 |
105,600.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
2,541.0 |
TON |
71.00 |
180,411.00 |
60.00 |
152,460.00 |
55.00 |
139,755.00 |
64.00 |
162,624.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
1,800.00 |
1,800.00 |
25,000.00 |
25,000.00 |
4,000.00 |
4,000.00 |
| 716-01-A |
mulch (vegetative)
|
13.77 |
ACRE |
700.00 |
9,639.00 |
1,000.00 |
13,770.00 |
450.00 |
6,196.50 |
500.00 |
6,885.00 |
| 717-01-A |
seeding (bermuda)
|
207   |
LB |
9.00 |
1,863.00 |
5.00 |
1,035.00 |
10.00 |
2,070.00 |
6.00 |
1,242.00 |
| 718-01-A |
fertilizer (8-8-8)
|
6,890   |
LB |
0.30 |
2,067.00 |
1.50 |
10,335.00 |
0.25 |
1,722.50 |
1.00 |
6,890.00 |
| 719-01-A |
plants (lagerstroemia indica/'watermelon red' crape
myrtle,12'-14'min. ht., 1-1/2" cal.,3 canes min.,b&b,4' min. spread) |
10   |
EACH |
350.00 |
3,500.00 |
325.00 |
3,250.00 |
200.00 |
2,000.00 |
425.00 |
4,250.00 |
| 719-01-B |
plants (quercus virginiana/live oak,3"cal.,12'-14'
min. ht.,6' min. spread ,heavily branched,b&b) |
13   |
EACH |
400.00 |
5,200.00 |
400.00 |
5,200.00 |
350.00 |
4,550.00 |
450.00 |
5,850.00 |
| 719-02-A |
top dressing mulch ( 3" minimum thickness)
|
22   |
SQYD |
14.00 |
308.00 |
13.00 |
286.00 |
5.00 |
110.00 |
25.00 |
550.00 |
| 724-01-C |
pavement patching (3" minimum thickness)
|
36   |
SQYD |
100.00 |
3,600.00 |
85.00 |
3,060.00 |
30.00 |
1,080.00 |
80.00 |
2,880.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
49,000.00 |
49,000.00 |
30,000.00 |
30,000.00 |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
| 729-01 |
sign (type a)
|
6.0 |
SQFT |
32.00 |
192.00 |
30.00 |
180.00 |
35.00 |
210.00 |
100.00 |
600.00 |
| 729-21 |
u-channel post
|
4   |
EACH |
61.00 |
244.00 |
115.00 |
460.00 |
75.00 |
300.00 |
60.00 |
240.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.731 |
MILE |
3,000.00 |
2,193.00 |
3,000.00 |
2,193.00 |
2,600.00 |
1,900.60 |
3,000.00 |
2,193.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.953 |
MILE |
1,400.00 |
1,334.20 |
1,350.00 |
1,286.55 |
1,200.00 |
1,143.60 |
1,500.00 |
1,429.50 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
44   |
EACH |
165.00 |
7,260.00 |
160.00 |
7,040.00 |
150.00 |
6,600.00 |
250.00 |
11,000.00 |
| 732-04-F |
plastic pavement legends & symbols (pedestrian)
|
11   |
EACH |
260.00 |
2,860.00 |
250.00 |
2,750.00 |
230.00 |
2,530.00 |
250.00 |
2,750.00 |
| 732-04-G |
plastic pavement legends & symbols (bicycle)
|
11   |
EACH |
260.00 |
2,860.00 |
250.00 |
2,750.00 |
230.00 |
2,530.00 |
250.00 |
2,750.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
24,000.00 |
24,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
26,000.00 |
26,000.00 |
| S-001-A |
geotextile fabric (against rip rap)
|
1,870   |
SQYD |
1.10 |
2,057.00 |
1.60 |
2,992.00 |
1.00 |
1,870.00 |
2.00 |
3,740.00 |
| S-001-B |
geotextile fabric (under base course)
|
13,530   |
SQYD |
1.10 |
14,883.00 |
1.25 |
16,912.50 |
1.00 |
13,530.00 |
1.10 |
14,883.00 |
| S-002-A |
safety fence (safety fence and signs)
|
5,200   |
LNFT |
1.10 |
5,720.00 |
1.50 |
7,800.00 |
3.00 |
15,600.00 |
2.50 |
13,000.00 |
| S-002-B |
safety fence (gates)
|
2   |
EACH |
500.40 |
1,000.80 |
550.00 |
1,100.00 |
150.00 |
300.00 |
750.00 |
1,500.00 |
| | SUBTOTAL GENERAL |
|
|
|
644,674.00 |
|
671,285.05 |
|
751,520.70 |
|
762,066.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
additive alternate
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
additive alternate a1
|
|
|
|
|
|
|
|
|
|
|
| 202-02-I-01 |
removal of trees and stumps
|
1   |
EACH |
232.00 |
232.00 |
275.00 |
275.00 |
200.00 |
200.00 |
350.00 |
350.00 |
| 203-01-A-01 |
general excavation
|
lump |
lump |
456.00 |
456.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
7,000.00 |
7,000.00 |
| 203-05-A-01 |
nonplastic embankment
|
lump |
lump |
7,000.00 |
7,000.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
4,800.00 |
4,800.00 |
| 203-08-B-01 |
borrow (vehicular measurement)(plastic soils)(off-site)
|
1,275   |
CUYD |
10.50 |
13,387.50 |
18.00 |
22,950.00 |
16.75 |
21,356.25 |
16.00 |
20,400.00 |
| 204-06-01 |
temporary silt fencing
|
600   |
LNFT |
2.00 |
1,200.00 |
1.00 |
600.00 |
2.50 |
1,500.00 |
1.60 |
960.00 |
| 302-01-01 |
class ii base course
|
230.0 |
CUYD |
44.25 |
10,177.50 |
50.00 |
11,500.00 |
54.00 |
12,420.00 |
60.00 |
13,800.00 |
| 502-01-A-01 |
superpave asphaltic concrete, paved drives and
turnouts |
308.0 |
TON |
67.50 |
20,790.00 |
60.00 |
18,480.00 |
55.00 |
16,940.00 |
64.00 |
19,712.00 |
| 713-01-01 |
temporary signs & barricades
|
lump |
LUMP |
606.00 |
606.00 |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
| 716-01-A-01 |
mulch (vegetative)
|
1.65 |
ACRE |
670.00 |
1,105.50 |
1,000.00 |
1,650.00 |
450.00 |
742.50 |
500.00 |
825.00 |
| 717-01-A-01 |
seeding (bermuda)
|
25   |
LB |
8.50 |
212.50 |
5.00 |
125.00 |
10.00 |
250.00 |
6.00 |
150.00 |
| 718-01-A-01 |
fertilizer (8-8-8)
|
830   |
LB |
0.30 |
249.00 |
1.50 |
1,245.00 |
0.25 |
207.50 |
1.00 |
830.00 |
| 719-01-B-01 |
plants (quercus virginiana/live oak,3"cal.,12'-14'
min. ht.,6' min. spread ,heavily branched,b&b) |
1   |
EACH |
394.00 |
394.00 |
400.00 |
400.00 |
350.00 |
350.00 |
425.00 |
425.00 |
| 719-02-A-01 |
top dressing mulch ( 3" minimum thickness)
|
1   |
SQYD |
13.00 |
13.00 |
13.00 |
13.00 |
5.00 |
5.00 |
25.00 |
25.00 |
| 732-02-A-01 |
plastic pavement striping (solid line) (4" width)
|
0.045 |
MILE |
3,241.77 |
145.87 |
3,000.00 |
135.00 |
2,400.00 |
108.00 |
3,000.00 |
135.00 |
| 732-03-A-01 |
plastic pavement striping (broken line)(4" width)
|
0.121 |
MILE |
1,339.80 |
162.11 |
1,350.00 |
163.35 |
1,200.00 |
145.20 |
1,500.00 |
181.50 |
| 732-04-A-01 |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
158.00 |
632.00 |
160.00 |
640.00 |
150.00 |
600.00 |
250.00 |
1,000.00 |
| 732-04-F-01 |
plastic pavement legends & symbols (pedestrian)
|
1   |
EACH |
250.00 |
250.00 |
250.00 |
250.00 |
230.00 |
230.00 |
250.00 |
250.00 |
| 732-04-G-01 |
plastic pavement legends & symbols (bicycle)
|
1   |
EACH |
250.00 |
250.00 |
250.00 |
250.00 |
230.00 |
230.00 |
250.00 |
250.00 |
| 740-01-01 |
construction layout
|
lump |
LUMP |
370.00 |
370.00 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| S-001-B-01 |
geotextile fabric (under base course)
|
1,860   |
SQYD |
1.10 |
2,046.00 |
1.25 |
2,325.00 |
1.00 |
1,860.00 |
1.10 |
2,046.00 |
| S-002-A-01 |
safety fence (safety fence and signs)
|
600   |
LNFT |
1.10 |
660.00 |
1.50 |
900.00 |
3.00 |
1,800.00 |
2.50 |
1,500.00 |
| | SUBTOTAL ALT A1 |
|
|
|
60,338.98 |
|
69,701.35 |
|
69,944.45 |
|
77,139.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B |
additive alternate
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B1 |
additive alternate b1
|
|
|
|
|
|
|
|
|
|
|
| 202-02-I-02 |
removal of trees and stumps
|
2   |
EACH |
182.00 |
364.00 |
275.00 |
550.00 |
200.00 |
400.00 |
350.00 |
700.00 |
| 203-01-A-02 |
general excavation
|
lump |
lump |
700.00 |
700.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
12,000.00 |
12,000.00 |
| 203-05-A-02 |
nonplastic embankment
|
lump |
lump |
11,200.00 |
11,200.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
8,400.00 |
8,400.00 |
| 203-08-B-02 |
borrow (vehicular measurement)(plastic soils)(off-site)
|
2,290   |
CUYD |
12.00 |
27,480.00 |
18.00 |
41,220.00 |
16.75 |
38,357.50 |
16.00 |
36,640.00 |
| 204-06-02 |
temporary silt fencing
|
1,260   |
LNFT |
2.00 |
2,520.00 |
1.00 |
1,260.00 |
2.50 |
3,150.00 |
1.60 |
2,016.00 |
| 302-01-02 |
class ii base course
|
407.0 |
CUYD |
44.00 |
17,908.00 |
50.00 |
20,350.00 |
54.00 |
21,978.00 |
60.00 |
24,420.00 |
| 502-01-A-02 |
superpave asphaltic concrete, paved drives and
turnouts |
624.0 |
TON |
68.00 |
42,432.00 |
60.00 |
37,440.00 |
55.00 |
34,320.00 |
64.00 |
39,936.00 |
| 713-01-02 |
temporary signs & barricades
|
lump |
LUMP |
600.00 |
600.00 |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
1,500.00 |
1,500.00 |
| 716-01-A-02 |
mulch (vegetative)
|
3.47 |
ACRE |
670.00 |
2,324.90 |
1,000.00 |
3,470.00 |
450.00 |
1,561.50 |
500.00 |
1,735.00 |
| 717-01-A-02 |
seeding (bermuda)
|
52   |
LB |
8.50 |
442.00 |
5.00 |
260.00 |
10.00 |
520.00 |
6.00 |
312.00 |
| 718-01-A-02 |
fertilizer (8-8-8)
|
1,740   |
LB |
0.30 |
522.00 |
1.50 |
2,610.00 |
0.25 |
435.00 |
1.00 |
1,740.00 |
| 719-01-A-02 |
plants (lagerstroemia indica/'watermelon red' crape
myrtle,12'-14'min. ht., 1-1/2" cal.,3 canes min.,b&b,4' min. spread) |
1   |
EACH |
332.00 |
332.00 |
325.00 |
325.00 |
200.00 |
200.00 |
425.00 |
425.00 |
| 719-01-B-02 |
plants (quercus virginiana/live oak,3"cal.,12'-14'
min. ht.,6' min. spread ,heavily branched,b&b) |
1   |
EACH |
394.00 |
394.00 |
400.00 |
400.00 |
350.00 |
350.00 |
425.00 |
425.00 |
| 719-02-A-02 |
top dressing mulch ( 3" minimum thickness)
|
2   |
SQYD |
13.50 |
27.00 |
13.00 |
26.00 |
5.00 |
10.00 |
25.00 |
50.00 |
| 729-01-02 |
sign (type a)
|
10.0 |
SQFT |
30.00 |
300.00 |
30.00 |
300.00 |
30.00 |
300.00 |
100.00 |
1,000.00 |
| 729-21-02 |
u-channel post
|
4   |
EACH |
58.00 |
232.00 |
115.00 |
460.00 |
75.00 |
300.00 |
60.00 |
240.00 |
| 732-02-A-02 |
plastic pavement striping (solid line) (4" width)
|
0.238 |
MILE |
2,951.52 |
702.46 |
3,000.00 |
714.00 |
2,600.00 |
618.80 |
3,000.00 |
714.00 |
| 732-03-A-02 |
plastic pavement striping (broken line)(4" width)
|
0.231 |
MILE |
1,344.76 |
310.63 |
1,350.00 |
311.85 |
1,200.00 |
277.20 |
1,500.00 |
346.50 |
| 732-04-A-02 |
plastic pavement legends & symbols (arrow)
|
18   |
EACH |
157.50 |
2,835.00 |
160.00 |
2,880.00 |
150.00 |
2,700.00 |
250.00 |
4,500.00 |
| 732-04-F-02 |
plastic pavement legends & symbols (pedestrian)
|
6   |
EACH |
248.00 |
1,488.00 |
250.00 |
1,500.00 |
230.00 |
1,380.00 |
250.00 |
1,500.00 |
| 732-04-G-02 |
plastic pavement legends & symbols (bicycle)
|
6   |
EACH |
248.00 |
1,488.00 |
250.00 |
1,500.00 |
230.00 |
1,380.00 |
250.00 |
1,500.00 |
| 740-01-02 |
construction layout
|
lump |
LUMP |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
2,100.00 |
2,100.00 |
| S-001-B-02 |
geotextile fabric (under base course)
|
2,990   |
SQYD |
1.00 |
2,990.00 |
1.25 |
3,737.50 |
1.00 |
2,990.00 |
1.10 |
3,289.00 |
| S-002-A-02 |
safety fence (safety fence and signs)
|
1,260   |
LNFT |
1.00 |
1,260.00 |
1.50 |
1,890.00 |
3.00 |
3,780.00 |
2.50 |
3,150.00 |
| | SUBTOTAL ALT B1 |
|
|
|
119,451.99 |
|
144,004.35 |
|
141,508.00 |
|
148,638.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C |
additive alternate
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C1 |
additive alternate c1
|
|
|
|
|
|
|
|
|
|
|
| 202-02-I-03 |
removal of trees and stumps
|
9   |
EACH |
194.00 |
1,746.00 |
275.00 |
2,475.00 |
200.00 |
1,800.00 |
350.00 |
3,150.00 |
| 203-01-A-03 |
general excavation
|
lump |
lump |
6,200.00 |
6,200.00 |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
12,000.00 |
12,000.00 |
| 203-05-A-03 |
nonplastic embankment
|
lump |
lump |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
17,000.00 |
17,000.00 |
9,600.00 |
9,600.00 |
| 203-08-B-03 |
borrow (vehicular measurement)(plastic soils)(off-site)
|
950   |
CUYD |
16.00 |
15,200.00 |
18.00 |
17,100.00 |
16.75 |
15,912.50 |
16.00 |
15,200.00 |
| 204-06-03 |
temporary silt fencing
|
1,240   |
LNFT |
2.00 |
2,480.00 |
1.00 |
1,240.00 |
2.50 |
3,100.00 |
1.60 |
1,984.00 |
| 302-01-03 |
class ii base course
|
400.0 |
CUYD |
44.00 |
17,600.00 |
50.00 |
20,000.00 |
54.00 |
21,600.00 |
60.00 |
24,000.00 |
| 502-01-A-03 |
superpave asphaltic concrete, paved drives and
turnouts |
616.0 |
TON |
68.00 |
41,888.00 |
60.00 |
36,960.00 |
55.00 |
33,880.00 |
64.00 |
39,424.00 |
| 713-01-03 |
temporary signs & barricades
|
lump |
LUMP |
600.00 |
600.00 |
1,800.00 |
1,800.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
| 716-01-A-03 |
mulch (vegetative)
|
3.42 |
ACRE |
670.00 |
2,291.40 |
1,000.00 |
3,420.00 |
450.00 |
1,539.00 |
500.00 |
1,710.00 |
| 717-01-A-03 |
seeding (bermuda)
|
51   |
LB |
8.50 |
433.50 |
5.00 |
255.00 |
10.00 |
510.00 |
6.00 |
306.00 |
| 718-01-A-03 |
fertilizer (8-8-8)
|
1,710   |
LB |
0.30 |
513.00 |
1.50 |
2,565.00 |
0.25 |
427.50 |
1.00 |
1,710.00 |
| 719-01-A-03 |
plants (lagerstroemia indica/'watermelon red' crape
myrtle,12'-14'min. ht., 1-1/2" cal.,3 canes min.,b&b,4' min. spread) |
5   |
EACH |
332.00 |
1,660.00 |
325.00 |
1,625.00 |
200.00 |
1,000.00 |
425.00 |
2,125.00 |
| 719-01-B-03 |
plants (quercus virginiana/live oak,3"cal.,12'-14'
min. ht.,6' min. spread ,heavily branched,b&b) |
5   |
EACH |
394.00 |
1,970.00 |
400.00 |
2,000.00 |
350.00 |
1,750.00 |
425.00 |
2,125.00 |
| 719-02-A-03 |
top dressing mulch ( 3" minimum thickness)
|
11   |
SQYD |
13.50 |
148.50 |
13.00 |
143.00 |
5.00 |
55.00 |
25.00 |
275.00 |
| 729-01-03 |
sign (type a)
|
7.8 |
SQFT |
30.25 |
235.95 |
30.00 |
234.00 |
30.00 |
234.00 |
100.00 |
780.00 |
| 729-21-03 |
u-channel post
|
3   |
EACH |
58.00 |
174.00 |
115.00 |
345.00 |
75.00 |
225.00 |
60.00 |
180.00 |
| 732-01-D-03 |
plastic pavement striping (12" width)
|
50   |
LNFT |
1.80 |
90.00 |
1.80 |
90.00 |
1.75 |
87.50 |
2.00 |
100.00 |
| 732-02-A-03 |
plastic pavement striping (solid line) (4" width)
|
0.228 |
MILE |
2,952.00 |
673.05 |
3,000.00 |
684.00 |
2,600.00 |
592.80 |
3,000.00 |
684.00 |
| 732-03-A-03 |
plastic pavement striping (broken line)(4" width)
|
0.228 |
MILE |
1,362.25 |
310.59 |
1,350.00 |
307.80 |
1,200.00 |
273.60 |
1,500.00 |
342.00 |
| 732-04-A-03 |
plastic pavement legends & symbols (arrow)
|
18   |
EACH |
158.00 |
2,844.00 |
160.00 |
2,880.00 |
150.00 |
2,700.00 |
250.00 |
4,500.00 |
| 732-04-F-03 |
plastic pavement legends & symbols (pedestrian)
|
6   |
EACH |
248.00 |
1,488.00 |
250.00 |
1,500.00 |
230.00 |
1,380.00 |
250.00 |
1,500.00 |
| 732-04-G-03 |
plastic pavement legends & symbols (bicycle)
|
6   |
EACH |
248.00 |
1,488.00 |
250.00 |
1,500.00 |
230.00 |
1,380.00 |
250.00 |
1,500.00 |
| 740-01-03 |
construction layout
|
lump |
LUMP |
365.00 |
365.00 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
3,000.00 |
3,000.00 |
| S-001-B-03 |
geotextile fabric (under base course)
|
2,950   |
SQYD |
1.00 |
2,950.00 |
1.25 |
3,687.50 |
1.00 |
2,950.00 |
1.10 |
3,245.00 |
| S-002-A-03 |
safety fence (safety fence and signs)
|
1,240   |
LNFT |
1.00 |
1,240.00 |
1.50 |
1,860.00 |
3.00 |
3,720.00 |
2.50 |
3,100.00 |
| | SUBTOTAL ALT C1 |
|
|
|
116,588.99 |
|
129,671.30 |
|
132,616.90 |
|
135,040.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
941,053.96 |
|
1,014,662.05 |
|
1,095,590.05 |
|
1,122,884.50 |
|