| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - R-K CONTRACTORS, L.L.C. |
- 2 - SPINKS CONSTRUCTION, INC. |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
3,727.33 |
3,727.33 |
30,000.00 |
30,000.00 |
8,500.00 |
8,500.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,422.25 |
4,422.25 |
20,000.00 |
20,000.00 |
5,500.00 |
5,500.00 |
|
|
| 202-03 |
relocation of air conditioner guard
|
1   |
EACH |
583.74 |
583.74 |
1.00 |
1.00 |
600.00 |
600.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
50   |
CUYD |
44.22 |
2,211.00 |
50.00 |
2,500.00 |
18.00 |
900.00 |
|
|
| 701-01-B |
cross drain pipe (6" pvc)
|
52   |
LNFT |
36.64 |
1,905.28 |
10.00 |
520.00 |
36.00 |
1,872.00 |
|
|
| 701-01-E |
cross drain pipe (12" rcp)
|
48   |
LNFT |
42.96 |
2,062.08 |
20.00 |
960.00 |
60.00 |
2,880.00 |
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
6   |
LNFT |
79.60 |
477.60 |
45.00 |
270.00 |
90.00 |
540.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
2,140.0 |
SQYD |
33.80 |
72,332.00 |
30.00 |
64,200.00 |
37.00 |
79,180.00 |
|
|
| 706-01-C |
concrete walk (6" thick)
|
160.0 |
SQYD |
40.12 |
6,419.20 |
40.00 |
6,400.00 |
42.00 |
6,720.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,317.50 |
6,317.50 |
12,000.00 |
12,000.00 |
17,000.00 |
17,000.00 |
|
|
| 717-01 |
seeding
|
41   |
LB |
18.95 |
776.95 |
20.00 |
820.00 |
30.00 |
1,230.00 |
|
|
| 718-01 |
fertilizer
|
1,180   |
LB |
0.57 |
672.60 |
1.00 |
1,180.00 |
1.20 |
1,416.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
12,003.25 |
12,003.25 |
20,000.00 |
20,000.00 |
36,000.00 |
36,000.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
1,750   |
LNFT |
3.16 |
5,530.00 |
3.00 |
5,250.00 |
3.00 |
5,250.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,032.40 |
3,032.40 |
2,900.00 |
2,900.00 |
4,500.00 |
4,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
122,473.18 |
|
167,001.00 |
|
172,088.00 |
|
|
|