Letting of 1/26/2005 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-64-0102
Parish: WINN
Routes:
Description: PORT-DE-LUCE CREEK BRIDGE
Type Const: grading, concrete slab span bridge, and related work.
 
RankLicenseBidderAmount
112136 SHILOH CONTRACTORS, INC. $192,523.50
214788 LOUISIANA BRIDGE, INC. $208,197.02
318546 C,W & W CONTRACTORS, INC. $224,754.84
409090 GUINN BROTHERS, LLC. $225,494.90
534567 JAMES CONSTRUCTION GROUP LLC $226,054.00
625747 KOSTMAYER CONSTRUCTION, LLC $247,044.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
SHILOH CONTRACTORS, INC.
- 2 -
LOUISIANA BRIDGE, INC.
- 3 -
C,W & W CONTRACTORS, INC.
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 9,000.00 9,000.00 7,000.00 7,000.00 8,000.00 8,000.00 15,000.00 15,000.00
202-01 removal of structures & obstructions lump      lump 1,500.00 1,500.00 3,000.00 3,000.00 4,000.00 4,000.00 5,000.00 5,000.00
203-06 excavation & embankment lump      lump 22,000.00 22,000.00 25,000.00 25,000.00 12,000.00 12,000.00 17,000.00 17,000.00
204-02 temporary hay or straw bales 21      ea 1.00 21.00 1.00 21.00 10.00 210.00 10.00 210.00
204-03 temporary slope drains 23      ln m 1.00 23.00 1.00 23.00 18.00 414.00 1.00 23.00
204-05-A temporary sediment check dams (hay) 7      ea 1.00 7.00 1.00 7.00 250.00 1,750.00 100.00 700.00
204-06 temporary silt fencing 60      ln m 3.00 180.00 1.00 60.00 10.00 600.00 5.00 300.00
403-01 aggregate roadway surfacing (vehicular measurement) 87.7    cu m 75.00 6,577.50 73.00 6,402.10 80.00 7,016.00 85.00 7,454.50
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 140.00 4,267.20 167.00 5,090.16 220.00 6,705.60 195.00 5,943.60
704-09 guard rail anchor sections (turndown) 30.48   ln m 110.00 3,352.80 112.00 3,413.76 113.00 3,444.24 110.00 3,352.80
711-01-D riprap (25 kg, 460mm thick ) 220      sq m 50.00 11,000.00 51.00 11,220.00 60.00 13,200.00 45.00 9,900.00
711-04 geotextile fabric 220      sq m 3.00 660.00 3.00 660.00 2.00 440.00 5.00 1,100.00
713-01 temporary signs & barricades lump      lump 2,000.00 2,000.00 6,500.00 6,500.00 3,000.00 3,000.00 6,000.00 6,000.00
727-01 mobilization lump      lump 18,000.00 18,000.00 18,500.00 18,500.00 25,000.00 25,000.00 30,000.00 30,000.00
729-16-C object marker assembly (type 3) 8      ea 70.00 560.00 78.00 624.00 93.75 750.00 95.00 760.00
740-01 construction layout lump      lump 3,000.00 3,000.00 3,500.00 3,500.00 6,000.00 6,000.00 4,000.00 4,000.00
804-01-B precast concrete piles (350 mm) 225.0    ln m 115.00 25,875.00 143.00 32,175.00 193.00 43,425.00 110.00 24,750.00
804-12 loading permanent piles 1      ea FREE FREE 1.00 1.00 800.00 800.00 1.00 1.00
805-10-A bridge superstructure & substructure (60 degree
crossing - 7.3m roadway)
4      span 19,000.00 76,000.00 17,500.00 70,000.00 20,000.00 80,000.00 20,000.00 80,000.00
S-101 concrete approach slabs (60 degree crossing - 7.3m
roadway)
2      ea 4,250.00 8,500.00 7,500.00 15,000.00 4,000.00 8,000.00 7,000.00 14,000.00
                       
 CONTRACTOR TOTAL       192,523.50   208,197.02   224,754.84   225,494.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
JAMES CONSTRUCTION GROUP LLC
- 6 -
KOSTMAYER CONSTRUCTION, LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 13,500.00 13,500.00 12,000.00 12,000.00        
202-01 removal of structures & obstructions lump      lump 3,000.00 3,000.00 3,000.00 3,000.00        
203-06 excavation & embankment lump      lump 25,000.00 25,000.00 12,000.00 12,000.00        
204-02 temporary hay or straw bales 21      ea 10.00 210.00 15.00 315.00        
204-03 temporary slope drains 23      ln m 8.00 184.00 40.00 920.00        
204-05-A temporary sediment check dams (hay) 7      ea 200.00 1,400.00 180.00 1,260.00        
204-06 temporary silt fencing 60      ln m 5.00 300.00 5.00 300.00        
403-01 aggregate roadway surfacing (vehicular measurement) 87.7    cu m 100.00 8,770.00 75.00 6,577.50        
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 150.00 4,572.00 165.00 5,029.20        
704-09 guard rail anchor sections (turndown) 30.48   ln m 100.00 3,048.00 130.00 3,962.40        
711-01-D riprap (25 kg, 460mm thick ) 220      sq m 50.00 11,000.00 54.00 11,880.00        
711-04 geotextile fabric 220      sq m 3.00 660.00 3.00 660.00        
713-01 temporary signs & barricades lump      lump 5,000.00 5,000.00 12,000.00 12,000.00        
727-01 mobilization lump      lump 22,000.00 22,000.00 48,000.00 48,000.00        
729-16-C object marker assembly (type 3) 8      ea 70.00 560.00 80.00 640.00        
740-01 construction layout lump      lump 5,000.00 5,000.00 5,000.00 5,000.00        
804-01-B precast concrete piles (350 mm) 225.0    ln m 150.00 33,750.00 140.00 31,500.00        
804-12 loading permanent piles 1      ea 100.00 100.00 FREE FREE        
805-10-A bridge superstructure & substructure (60 degree
crossing - 7.3m roadway)
4      span 19,000.00 76,000.00 19,500.00 78,000.00        
S-101 concrete approach slabs (60 degree crossing - 7.3m
roadway)
2      ea 6,000.00 12,000.00 7,000.00 14,000.00        
                       
 CONTRACTOR TOTAL       226,054.00   247,044.10